I JUL 2 91987 1
i Docket No.
50-336 Northeast Nuclear Energy Company ATTN:
Mr. E. J. Mroczka Senior Vice President - Nuclear Engineering and Operations Group P. O.-Box 270 Hartford, Connecticut 06141-0270 Gentlemen:
Subject:
Request for Additional Information In order to complete their review of your response to IE Bulletin 85-03, the NRC h
Office of Nuclear Reactor Regulation (NP.R) requires additional information.
The additional information requirements are aescribed in the enclosure.
A rr. ply within 30 days of receipt of this letter is requested.
Please send a copy of your reply to Mr. R. J. Kiessel of hRR.
Your cooperation is appreciated.
Sincerely, STABinal Signsg p.n Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects
Enclosure:
As Stated cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations S. E. Scace, Station Superintendent D. O. Nordquist, Manager of Quality Assurzace R. M. Kacich, Manager, Generation Facilities Licensing Gerald Garfield, Esquire Public Document Room (PDR)
Local Public Document P.oom (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Connecticut QOOg$
P k
o pd/ \\
- o s'
)
I Northeast Nuclear Energy Company 2
JUL 2 919BT
{
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief j
M. McBride, RI, Pilgrim P. Swetlead, SRI, Haddam Neck J. Shedlosky, SRI, Millstone 3 D.' Jaffe, LPM, NRR R. J. Kie>sel, NRR (w/~ enc 1)
R. Bores, CRSS i
l i
RI:DRP RI:URP R
Limroth/meo McCabe zipger 7/21/87 q{g
-/pq gQ OFFICIAL RECORD COPY
l t:
Page 1 of 1 REQUEST FOR ADDITIONAL INFORMATION (RAI) RE.:
Review of' Responses to Action Iten e of IE Bulletin-85-03 Licensee:
Unit (s): Millstone 2' Northeast Utilities Date of Response: 06-11-86 P. O. Box 270 Hartford, Connecticut 06141-0270 Respondent:
J, F. Opeka Senior Vice President The informatiOn.provided in your response to Action Item e of IE Bulletin 85-03 was found to be deficient in some areas.
Please provide the additional information necessary to resolve the following comments and questions:
- 1. Unlisted MOVs 2SI-614, -624, -634 and -644 in discharge lines of the safety injection tank system are shown normally open (FL) on Drawing 25203-26015 Revision 18.
The possible problem g
that the. system would be inoperable if the MOVs were left closed inadvertently should be addressed.
Base' on the assumption of inadvertent equipment operations as required by Action Item a of the bulletin, revise the table of the response.
of 06-11-86 to include these valves.
- 2. Has water hammer due to valve closure been considered in the determination of pressure differentials?
If not, please explain.
- 3. Please expand the proposed program for action items b, e and d of.the bulletin to include the following details as a minimum:
(a) commitment to a training program for setting switches, maintaining valve operators, using test equipment and interpreting test results, (b) commitment to justify continted operation of a valve determined to be inoperable, and (c) description of a method possibly needed to extrapolate valve stem, thrust measured at less than maximum differential pressure.
4 Please submit and justify a date for planned completion of Action Item f of the bulletin.
As indicated by the response of 06-11-86, the specified due date of January 15, 1988 for Action Item f will not be met.