ML20236J005
| ML20236J005 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 10/28/1987 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20236J008 | List: |
| References | |
| NUDOCS 8711050098 | |
| Download: ML20236J005 (2) | |
See also: IR 05000213/1987025
Text
--- __ - --
)
)
I'
l
l
.
l
007 28 1987
,
,
Docket / License:
50-213/DPR-61
i
!
.
Connecticut Yankee Atomic Power Company
l
l
ATTN:
Mr. E. J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
l
Subject:
Routine Resident Inspection 50-213/87-25 (8/26/87 - 10/8/87)
l
This transmits the findings of the above subject NRC inspection by J. T.
Shedlosky, A. A. Asars and others at the Haddam Neck Plant. The findings
i
have been discussed with Mr. D. B. Miller of your staff.
l
Thank you for informing us, by letter dated September 18, 1987, of your
decision to discontinue convening separate Plant Operations Review Committee
meetings for review of Plant Design Change Records.
This change, which is
discussed in Cetail 5.3 of the enclosed inspection report, is acceptable to the
NRC.
During this inspection, we observed that management attention to outage activities
was detailed and ongoing, and had a strong focus on maintaining radiation
exposures as low as practicable. Also, our observations of diving activities
in support of repairs to the reactor vessel core suppnrt barrel and thermal
shield found a thorough implementation of radiation protection controls.
' -
We also note that you expanded the scope of the Reactor Pressure Vessel
Intervice Inspection because of the lack of pre-service baseline data on the
Reactor Vessel and because of changed ASME Boiler and Pressure Vessel Code require-
J
ments, k'e consider this voluntary action to be a significant positive contribution
to the assurance of reactor safety.
As noted in Attachment I to the enclosed report, equipment maintenance and
l
cleanup concerns identified by the Region I Administrator were considered
sufficient to warrant a repeat inspection after outage completion.
1
Sincerely,
@liis1 Sidediy,
ho ggg gy8
-
3
O
Lee H. Bettenhausen, Chief
!
l
Projects Branch No. 1
Division of Reactor Projects
Enclosures: NRC Region I Report 50-213/87-25
j
Enclosure 1, Regional Administrator Inspection
!
0FFICIAL RECORD COPY
IR HN 87-25 - 0001.0.0
10/23/87
0I
\\\\
- - - - -
,_ _
__.
_
_ _ _ _ .
__ -
_ _ _ _ - _ _ - _
__ ._
. _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _
o
OCT 2 8 W
'
,
'
Connecticut Yankee Atomic
'
j
Power Company
2
cc w/ enc 1:
0, B Miller, Station Superintendent
.
O. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
W. D. Romberg, Vice President, Nuclear Operations
l
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room
Management Assistant, DRMA
l
DRP Section Chief
l
W. Raymond, SRI, Millstone
F. Akstulewicz, LPM, NRR
R. Bores., DRSS
C. Anderson, URS'
i
J. Strotnider, DRS
N. Blumberg, DRS
M. Shanbaky, DRSS
R. Keller, DRSS
{
RI
P
.RI:
O
RI:DRSS
RI:DRP RI: Der R
Asars
S8e 1 sky
Shanba,y
McCabe A4t* Bettenhausen
1
(t
@LO
@
cje
l
10/24/87 10/Jf87
10/)2tY 7
10/'n/87 /fu[/1 104 /87
q
OFFICIAL RECORD COPY
IR HN 87-2S - 0002.0,0
l
l
10/23/87
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _