Forwards Insp Rept 50-213/87-25 on 870826-1008.Util Advising NRC of Decision to Discontinue Convening Separate Plant Operations Review Committee Meetings for Review of Plant Design Change Records Ack & Acceptable
ML20236J005
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/28/1987
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20236J008 List:
References
NUDOCS 8711050098
Download: ML20236J005 (2)


See also: IR 05000213/1987025

Text

--- __ - --

)

)

I'

l

l .

l

, 007 28 1987

,

i Docket / License: 50-213/DPR-61

!

.

l Connecticut Yankee Atomic Power Company

l ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

l Gentlemen:

Subject: Routine Resident Inspection 50-213/87-25 (8/26/87 - 10/8/87)

l This transmits the findings of the above subject NRC inspection by J. T.

Shedlosky, A. A. Asars and others at the Haddam Neck Plant. The findings

i have been discussed with Mr. D. B. Miller of your staff.

l

Thank you for informing us, by letter dated September 18, 1987, of your

decision to discontinue convening separate Plant Operations Review Committee

meetings for review of Plant Design Change Records. This change, which is

discussed in Cetail 5.3 of the enclosed inspection report, is acceptable to the

NRC.

During this inspection, we observed that management attention to outage activities

was detailed and ongoing, and had a strong focus on maintaining radiation

exposures as low as practicable. Also, our observations of diving activities

in support of repairs to the reactor vessel core suppnrt barrel and thermal

shield found a thorough implementation of radiation protection controls.

'-

We also note that you expanded the scope of the Reactor Pressure Vessel

Intervice Inspection because of the lack of pre-service baseline data on the

Reactor Vessel and because of changed ASME Boiler and Pressure Vessel Code require-

J

ments, k'e consider this voluntary action to be a significant positive contribution

to the assurance of reactor safety.

As noted in Attachment I to the enclosed report, equipment maintenance and

cleanup concerns identified by the Region I Administrator were considered l

sufficient to warrant a repeat inspection after outage completion. 1

Sincerely,

@liis1 Sidediy,

-

ho ggg gy8 3

O Lee H. Bettenhausen, Chief  !

Projects Branch No. 1 l

Division of Reactor Projects

Enclosures: NRC Region I Report 50-213/87-25 j

Enclosure 1, Regional Administrator Inspection  !

0FFICIAL RECORD COPY IR HN 87-25 - 0001.0.0

10/23/87

0I \\

- - - - -

,_ _ __. _ _ _ _ _ . __ - _ _ _ _ - _ _ - _ __ ._ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _

o

'

,

OCT 2 8 W

'

Connecticut Yankee Atomic

'

j Power Company 2

cc w/ enc 1:

0, B Miller, Station Superintendent

.

O. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

W. D. Romberg, Vice President, Nuclear Operations

l Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room

Management Assistant, DRMA l

DRP Section Chief l

W. Raymond, SRI, Millstone

F. Akstulewicz, LPM, NRR

R. Bores., DRSS

C. Anderson, URS' i

J. Strotnider, DRS

N. Blumberg, DRS

M. Shanbaky, DRSS

R. Keller, DRSS

{

RI P .RI: O RI:DRSS RI:DRP RI: Der R

Asars S8e 1 sky Shanba,y McCabe A4t* Bettenhausen

1 (t @LO @ cje

l 10/24/87 10/Jf87 10/)2tY 7 10/'n/87 /fu[/1 104 /87

IR HN 87-2S - 0002.0,0

q

l

OFFICIAL RECORD COPY

l 10/23/87