Ice c)'
OCT 2 71987 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. E. J. Mroczka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06141 Gentlemen:
l
Subject:
10 CFR 50.49 EQUIPMENT QUALIFICATION INSPECTION, HADDEM NECK NUCLEAR POWER PLANT (50-213/87-28) 1 This letter confirms the dates of November 16-20, 1987 for the NRC 10 CFR 50.49 equipment qualification (EQ) inspection of Haddam Neck. These dates were i
established during a conference call on October 20, 1987 between Mr. J. Ferraro of your organization and Mr. R. Paolino of the NRC Region I office.
The inspection will take place at the corporate office in East Berlin, Connecticut with a one l
day visit to the plant site.
A management entrance meeting is scheduled for 2:00 p.m. on November 16, 1987.
The management exit meeting is tentatively scheduled for 1:00 p.m. on November 20, 1987.
j The inspection will include the following:
1.
Review of your implementation of 10 CFR 50.49 EQ program, including preservation of qualified status of equipment.
j 2.
Review of your implementation of Technical Evaluation Report / Safety Evaluation Report EQ corrective action commitments.
3.
Review of EQ documentation files.
\\
4.
Physical inspection of equipment from the Master List.
{
One week prior to the inspection we will require one copy of each document identified in attachment l' with a plus (+) mark.
A duplicate copy is to be sent to:
Uldis Potapovs, Chief Equipment Qualification Inspection Section EW/S 312A U. S. Nuclear Regulatory Commission Washington, DC 20555 K
G 0FFICIAL RECORD COPY PAOLIN010/21/87 - 0001.0.0 p\\
10/22/87
l o
i I
Connecticut Yankee Atomic Power Co.
2 Your cooperation with us during this inspection will be appreciated.
Should j
you have any questions regarding this inspection, you can contact Mr. R. Paolino at (215) 337-5285 or Mr. C. Anderson at (215) 337-5376.
l l
Sincerely, l
Origine.1 signed B7:
l cittf ord J. ACIC#
William V. Johnston Acting Director
[
Division of Reactor Safety
]
l cc D. B. Miller, Station Superintendent j
D. O. Nordquist, Manager of Quality Assurance R. M. Kacich, Manager, Generation Facilities Licensing W. D. Romberg, Vice President, Nuclear Operations Gerald Garfield, Esquire Public Document Room (PDR) i Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Connecticut bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encl)
Section Chief, DRP W. Raymond, SRI, Millstone 1,2 and 3 J. Akstulewicz, LPM, NRR R. Bores, DRSS U. Potapovs, NRR
Enclosure:
RI:DRS R
RI S
Paolino/cgl E-th Anderpon l
// t 7
/o/16/4 7
/
/v* f 7 0FFICIAL RECORD COPY PAOLIN010/21/87 - 0002.0.0 10/22/87 l
l
________o
- f... _
i l
ATTACHMENT 1 1
i i
1 REFERENCES i
1 1.
+ Licensee's overall EQ Program
/
2.
+NRC Safety Evaluation Reports concerning environmental qualification of
{
l safety-related electrical equipment, including the SER that forwarded the TER to each licensee.
3.
+ Licensee's commitments for corrective action including May 1983 SER/TER f
response, 1984 minutes of meeting with NRC, and subsequent changes, j
Licensee's list of equipment requiring environmental qualification l
4.
+a.
(Master List, submitted in May 1983).
i
+b.
Master List, version in effect at time of inspection.
l 5.
+a.
Generic Letter 84-24, D.G. Eisenhut to Licensee's and Applications, dated December 27, 1984,
Subject:
Certification of Compliance to 10 CFR 50.49.
+b.
Licensee's response to Generic Letter 84-24 6.
+ Licensee's current System Component Evaluation Worksheets (SCEW sheets) or equivalent (earlier SCEW sheets may have been included in previous licensee submittals).
1 7.
+ Licensee's procedures applicable to equipment qualification (EQ) program, procurement of qualified equipment, maintenance of qualified equipoent, EQ documentation, modifications to EQ equipment, EQ personnel training (site and corporate personnel), QA/EQ interface including corporate QA, Site q
QA/QC audits, EQ spare parts procurement and licensee program for EQ related NRC Information Notices / Bulletins, s
8.
- Licensee's qualification documentation and/or EQ files.
+*These documents must be availabTe for the Inspectors use throughout the inspection.
+These documents are requested for review before the inspection.
- - - --