Confirms Dates of 871116-20 for NRC 10CFR50.49 Equipment Qualification Insp at Plant Site,Per 871020 Telcon.Insp Will Include Listed Items
ML20236J015
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/27/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8711050100
Download: ML20236J015 (3)


Text

-__

Ice c)'

OCT 2 71987 Docket No. 50-213 Connecticut Yankee Atomic Power Company ATTN: Mr. E. J. Mroczka Senior Vice President - Nuclear Engineering and Operations Group P. O. Box 270 Hartford, Connecticut 06141 Gentlemen:

l

Subject:

10 CFR 50.49 EQUIPMENT QUALIFICATION INSPECTION, HADDEM NECK NUCLEAR POWER PLANT (50-213/87-28) 1 This letter confirms the dates of November 16-20, 1987 for the NRC 10 CFR 50.49 equipment qualification (EQ) inspection of Haddam Neck. These dates were i

established during a conference call on October 20, 1987 between Mr. J. Ferraro of your organization and Mr. R. Paolino of the NRC Region I office.

The inspection will take place at the corporate office in East Berlin, Connecticut with a one l

day visit to the plant site.

A management entrance meeting is scheduled for 2:00 p.m. on November 16, 1987.

The management exit meeting is tentatively scheduled for 1:00 p.m. on November 20, 1987.

j The inspection will include the following:

1.

Review of your implementation of 10 CFR 50.49 EQ program, including preservation of qualified status of equipment.

j 2.

Review of your implementation of Technical Evaluation Report / Safety Evaluation Report EQ corrective action commitments.

3.

Review of EQ documentation files.

\\

4.

Physical inspection of equipment from the Master List.

{

One week prior to the inspection we will require one copy of each document identified in attachment l' with a plus (+) mark.

A duplicate copy is to be sent to:

Uldis Potapovs, Chief Equipment Qualification Inspection Section EW/S 312A U. S. Nuclear Regulatory Commission Washington, DC 20555 K

G 0FFICIAL RECORD COPY PAOLIN010/21/87 - 0001.0.0 p\\

10/22/87

l o

i I

Connecticut Yankee Atomic Power Co.

2 Your cooperation with us during this inspection will be appreciated.

Should j

you have any questions regarding this inspection, you can contact Mr. R. Paolino at (215) 337-5285 or Mr. C. Anderson at (215) 337-5376.

l l

Sincerely, l

Origine.1 signed B7:

l cittf ord J. ACIC#

William V. Johnston Acting Director

[

Division of Reactor Safety

]

l cc D. B. Miller, Station Superintendent j

D. O. Nordquist, Manager of Quality Assurance R. M. Kacich, Manager, Generation Facilities Licensing W. D. Romberg, Vice President, Nuclear Operations Gerald Garfield, Esquire Public Document Room (PDR) i Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o encl)

Section Chief, DRP W. Raymond, SRI, Millstone 1,2 and 3 J. Akstulewicz, LPM, NRR R. Bores, DRSS U. Potapovs, NRR

Enclosure:

RI:DRS R

RI S

Paolino/cgl E-th Anderpon l

// t 7

/o/16/4 7

/

/v* f 7 0FFICIAL RECORD COPY PAOLIN010/21/87 - 0002.0.0 10/22/87 l

l

________o

f... _

i l

ATTACHMENT 1 1

i i

1 REFERENCES i

1 1.

+ Licensee's overall EQ Program

/

2.

+NRC Safety Evaluation Reports concerning environmental qualification of

{

l safety-related electrical equipment, including the SER that forwarded the TER to each licensee.

3.

+ Licensee's commitments for corrective action including May 1983 SER/TER f

response, 1984 minutes of meeting with NRC, and subsequent changes, j

Licensee's list of equipment requiring environmental qualification l

4.

+a.

(Master List, submitted in May 1983).

i

+b.

Master List, version in effect at time of inspection.

l 5.

+a.

Generic Letter 84-24, D.G. Eisenhut to Licensee's and Applications, dated December 27, 1984,

Subject:

Certification of Compliance to 10 CFR 50.49.

+b.

Licensee's response to Generic Letter 84-24 6.

+ Licensee's current System Component Evaluation Worksheets (SCEW sheets) or equivalent (earlier SCEW sheets may have been included in previous licensee submittals).

1 7.

+ Licensee's procedures applicable to equipment qualification (EQ) program, procurement of qualified equipment, maintenance of qualified equipoent, EQ documentation, modifications to EQ equipment, EQ personnel training (site and corporate personnel), QA/EQ interface including corporate QA, Site q

QA/QC audits, EQ spare parts procurement and licensee program for EQ related NRC Information Notices / Bulletins, s

8.

  • Licensee's qualification documentation and/or EQ files.

+*These documents must be availabTe for the Inspectors use throughout the inspection.