Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236Q701 + (05:20:21, 3 December 2024)
- ML20236Q702 + (05:20:21, 3 December 2024)
- ML20236Q697 + (05:20:23, 3 December 2024)
- ML20236Q693 + (05:20:24, 3 December 2024)
- ML20236Q692 + (05:20:25, 3 December 2024)
- ML20236Q689 + (05:20:26, 3 December 2024)
- ML20236Q691 + (05:20:26, 3 December 2024)
- ML20236Q688 + (05:20:29, 3 December 2024)
- ML20236Q683 + (05:20:32, 3 December 2024)
- IR 05000280/1998005 + (05:20:36, 3 December 2024)
- IR 05000302/1995015 + (05:20:37, 3 December 2024)
- ML20236Q675 + (05:20:38, 3 December 2024)
- ML20236Q676 + (05:20:38, 3 December 2024)
- ST-HL-AE-2408, Monthly Operating Rept for Oct 1987 + (05:20:39, 3 December 2024)
- NOC-AE-00002, Informs That STP Nuclear Operating Company Withdraws Proposed Amend to Incorporate SG Tube Repair by Electrosleeving + (05:20:39, 3 December 2024)
- ML20236Q672 + (05:20:40, 3 December 2024)
- ML20236Q671 + (05:20:41, 3 December 2024)
- IR 05000413/1998006 + (05:21:02, 3 December 2024)
- ML20236Q667 + (05:21:02, 3 December 2024)
- ML20236Q666 + (05:21:03, 3 December 2024)
- ML20236Q664 + (05:21:04, 3 December 2024)
- ML20236Q661 + (05:21:04, 3 December 2024)
- ML20236Q659 + (05:21:05, 3 December 2024)
- ML20236Q657 + (05:21:06, 3 December 2024)
- ML20236Q658 + (05:21:06, 3 December 2024)
- ML20236Q655 + (05:21:07, 3 December 2024)
- 05000423/LER-1987-035-01, :on 871016,discrepancy Between Plant Tech Spec (TS) Surveillance Method Specified & Actual Method Used for Biannual Procedure Review Discovered.Caused by Administrative Error.Ts Surveillance Updated + (05:21:09, 3 December 2024)
- 05000423/LER-1998-035, :on 980612,service Water Pump Cubicle Temperature Could Exceed Design Basis,Was Determined.Caused by Inadequate Design Control Process During Initial Plant Design.Reviewed & Revised Design Basis Calculations + (05:21:10, 3 December 2024)
- IR 05000321/1998003 + (05:21:24, 3 December 2024)
- ML20236Q644 + (05:21:25, 3 December 2024)
- 05000454/LER-1998-015-01, :on 980618,non-licensed Operator Started B Train MCR Ofc Supply Fan That Was Shutdown Due to Lcoar Action Requirements.Caused by Poor Practices.Shutdown MCR Ofc Fans & Taken out-of-svc Immediately + (05:21:27, 3 December 2024)
- ML20236Q636 + (05:21:28, 3 December 2024)
- ML20236Q637 + (05:21:28, 3 December 2024)
- NPL-98-0591, Provides Confirmation of Completion of Requested Actions,Iaw Required Response to GL 96-01 Re Testing of safety-related Logic Circuits + (05:21:29, 3 December 2024)
- ML20236Q630 + (05:21:30, 3 December 2024)
- ML20236Q632 + (05:21:30, 3 December 2024)
- ML20236Q628 + (05:21:31, 3 December 2024)
- ML20236Q626 + (05:21:32, 3 December 2024)
- IR 05000338/1987026 + (05:21:32, 3 December 2024)
- ML20236Q623 + (05:21:33, 3 December 2024)
- ML20236Q624 + (05:21:33, 3 December 2024)
- ML20236Q622 + (05:21:34, 3 December 2024)
- ML20236Q621 + (05:21:34, 3 December 2024)
- ML20236Q619 + (05:21:35, 3 December 2024)
- IR 05000424/1987059 + (05:21:36, 3 December 2024)
- IR 05000313/1998005 + (05:21:37, 3 December 2024)
- ML20236Q615 + (05:21:38, 3 December 2024)
- ML20236Q612 + (05:21:39, 3 December 2024)
- ML20236Q613 + (05:21:39, 3 December 2024)
- 05000458/LER-1998-002, :on 980425,failure of Two Trains of Annulus Mixing Was Noted.Caused by Problem W/Instantaneous Trip of Setpoint a & B Supply Breakers.Corrected Trip Settings & Replaced B Breaker + (05:21:41, 3 December 2024)
- B17355, Informs Staff of Change in End Date for First 10 Year ISI Interval & Change in Starting Date for Second 10 Year ISI Interval.End of First 10 Year ISI Will Be Extended to Oct 1999 & Beginning of Second 10 Year ISI Will Begin Apr 1999 + (05:21:42, 3 December 2024)