ML20236Q636

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Insp Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls
ML20236Q636
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/14/1998
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20236Q638 List:
References
50-321-98-03, 50-321-98-3, 50-366-98-03, 50-366-98-3, NUDOCS 9807200380
Download: ML20236Q636 (3)


See also: IR 05000321/1998003

Text

_ _ _ _ - _

___

.___ _ __ __-_ _ _ __ _ _ _ _ _ _ _ _

_ _ - _ _ _

_ _ - ___ -

.

,

.,

-

July 14, 1998

Southern Nuclear Operating Company, Inc.

ATTN:

Mr.'H.

L.. Sumner. Jr.

Vice President. Hatch Plant

Nuclear Operations

P.O. Box 1295

'

Birmingham, AL 35201

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-321/98-03 and 50-366/98-03

Dear Mr.'Sumner:

On June 20,'1998, the NRC completed an inspection at your Hatch facility. The

,

enclosed report presents the results of that inspection.

During the seven-week period covered by this inspection report, your conduct

of activities at the Hatch facility was generally characterized by safety-

conscious operations, sound engineering and maintenance practices, and careful

i

radiological _ work controls.

-

l'

The_ enclosed Inspection Report identifies activities that violate NRC

'

requirements that will not be subject to enforcement action because the

licensee's efforts in correcting the violation meet the criteria specified in

NUREG - 1600. Enforcement Policy.

In accordance with 10 CFR 2.790 of'the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

s

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by H.O.

Christensen

for P.H. Skinner)

Pierce H. Skinner. Chief

jej72gog g g

&

Reactor Projects Branch 2

/

e

. .

,P,DR

6

Division of Reactor Projects

j7

Il

Docket Nos.:

50-321 and'50-366

License Nos.: DPR-57 and NPF-5

Enclosure:

NRC Inspection Report 50-321/98-03

and 50-366/98-03

cc w/ encl:

(See page 2)

(

-

-

- - - - - - - _ - -

% ?L

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-____ __

.

.

..

SNC

2

cc w/ encl:

J. D. Woodard

Executive Vice President

Southern Nuclear Operating Company. Inc.

P. O. Box 1295

Birmingham AL 35201-1295

P. H.-Wells-

General Manager. Plant Hatch

Southern Nuclear Operating Company. Inc.

U. S. Highway 1 North

'j

P. O. Box 2010

Baxley, GA 31515-

D

M. Crowe

4

Manager Licensing - Hatch

Southern Nuclear Operating Company. Inc.

P. O. Box 1295

Birmingham AL 35201-1295

Ernest L. Blake. Esq.

Shaw Pittman. Potts and

Trowbridge

2300 N Street. NW

I

Washington. D. C.

20037

,

Office of Planning and Budget

'

Room 610

270 Washington Street. SW

Atlanta GA 30334

i

. Director

Department of Natural Resources

205 Butler Street. SE. Suite 1252

Atlanta, GA 30334

Manager., Radioactive Materials Program

Department of Natural Resources

4244 International Parkway

Suite 114

l

Atlanta. GA 30354

!

Chairman

Appling County Commissioners

County Courthouse

Baxley. GA 31513

cc w/ encl cont'd:

(See Page 3)

l

om we

~%

- ~u m m us

r.es

.

.

.

SNC-

3

cc w/ enc 1: Continued

Program Manager

Fossil & Nuclear Operations

Oglethor)e Power Corporation

2100 E.

Exchange Place

Tucker, GA 30085-1349

Charles A. Patrizia. Esq.

Paul. Hastings Janofsky & Walker

10th Floor

1299 Pennsylvania Avenue

Washington, D. C.

20004-9500

Senior Engineer - Power Supply

Municipal Electr1c Authority

of Georgia

1470 R1veredge Parkway NW

Atlanta, GA 30328-4684

Distribution w/ encl:

L. Plisco RII

P. H. Skinner. RII

B.' L. Holbrook. RII

W. P. Kleinsorge. RII

l

L. Olshan. NRR

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

11030 Hatch Parkway North

Baxley GA 31513

l

OFFICE

Ell @

kil.DRP

g

simuls vuur.

g'g ' > ,7

gQ

i

i

uma

aneur.a:a. ac.nwr

v

DATE

T/ l y /95

T/ 3 p /95

r/

/98

T/

/95

T/

/95

T/

/95

T/

/95

wurir

TE5 (W)

YES @)

YES

NO

YES

ND

TES

NO

YES

un

YES

M)

I

Of flCIAL RECUND GIPY

D00AENT RAME: C:\\tlATCi!\\f!LEEFEE\\lE18-03. HAT

TOTAL P.02

_ - _ - _ _ _ _ _ _ -

_ _ _ -