Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151J723 + (19:33:01, 24 May 2025)
- ML20151J646 + (19:33:14, 24 May 2025)
- TAC:53384 + (19:33:27, 24 May 2025)
- ML20151J559 + (19:33:28, 24 May 2025)
- TAC:12132 + (19:33:31, 24 May 2025)
- 05000331/LER-1997-007, :on 970624,inadequate Test of Reactor Mode Switch to Shutdown Position Rod Block Function & RBM Was Performed.Caused by Procedural Inadequacy.Stp 42C002-Q Has Been Revised & Was re-performed Satisfactorily + (19:33:36, 24 May 2025)
- 05000271/LER-1996-012, :on 960416,determined That Low Pressure Coolant Injection Flow Could Potentially Be Diverted.Caused by Inadequate Design Review Prior to Proceduralizing Use of Sys.Revised RHR Procedure + (19:35:59, 24 May 2025)
- 05000219/LER-1997-008-01, :on 970627,determined That Intermediate Range Monitor Sys Contacts in Reactor Protection Were Not Tested by Procedure.Caused by Inadequate Testing Procedures. Revised Sp 620.4.005 + (19:36:07, 24 May 2025)
- IR 05000528/1984013 + (19:36:10, 24 May 2025)
- ML20151J405 + (19:36:38, 24 May 2025)
- ML20151J395 + (19:36:39, 24 May 2025)
- 05000369/LER-1988-014-02, :on 880624,ESF Actuation & Blackout Occurred Due to Personnel Taking Wrong Action.Caused by Slow Response of Diesel Generator 2A Lube Oil Pressure Switches.Switches Recalibr & Procedure Will Be Revised + (19:36:41, 24 May 2025)
- 05000368/LER-1997-007-01, :on 970626,fuel Handling Area Ventilation Flow Rate Less than TS Requirement During Crane Operation W/Load Over Storage Pool Due to Personnel Error.Provided Addl Guidance in Crane Hold Card Instructions + (19:36:47, 24 May 2025)
- ML20151J311 + (19:36:56, 24 May 2025)
- ML20151J204 + (19:37:15, 24 May 2025)
- ML20151J171 + (19:37:19, 24 May 2025)
- ML20151J163 + (19:37:22, 24 May 2025)
- ML20151J131 + (19:37:31, 24 May 2025)
- 05000424/LER-1997-002-01, Forwards LER 97-002-01 Re P-4 Turbine Trip & Other Circuits Not Surveillance Tested Per GL 96-01, Testing of SR Logic Circuits + (19:37:44, 24 May 2025)
- ML20151J048 + (19:37:47, 24 May 2025)
- ML20151H923 + (19:38:13, 24 May 2025)
- ML20151H902 + (19:38:23, 24 May 2025)
- TAC:42465 + (19:38:25, 24 May 2025)
- TAC:67733 + (19:38:45, 24 May 2025)
- TAC:49164 + (19:38:58, 24 May 2025)
- 05000339/LER-1982-067-03, Steam Generator C Narrow Range Channel 2 Indicated High.Caused by Failure of Transmitter Amplifier Card.Card Replaced & Loop Recalibr + (19:39:02, 24 May 2025)
- 05000339/LER-1982-067, Forwards Updated LER 82-067/03X-1 + (19:39:06, 24 May 2025)
- IR 05000244/1982023 + (19:42:14, 24 May 2025)
- NUREG-0647, Requests Responses Re Relief from Surveillance Requirements of Equipment Which Would Result in Excessive Exposure.Tech Spec Change Requests,Scheduling for Recovering Affected Sys & Rev to Recovery Plan Requested + (19:42:59, 24 May 2025)
- TAC:8132 + (19:43:28, 24 May 2025)
- ML20151H368 + (19:44:17, 24 May 2025)
- TAC:42493 + (19:45:03, 24 May 2025)
- ML20151G933 + (19:46:13, 24 May 2025)
- 05000267/LER-1988-008, :on 880421,discovered Two Tech Spec Surveillances Not Performed within Required Monthly Interval.Caused by Miscommunication Between PORC & Nuclear Document Clerk.Surveillances Completed + (19:47:30, 24 May 2025)
- ML20151G587 + (19:47:39, 24 May 2025)
- TAC:67871 + (19:48:53, 24 May 2025)
- ML20151F853 + (19:49:59, 24 May 2025)
- ML20151F521 + (19:50:49, 24 May 2025)
- ML20151F516 + (19:50:51, 24 May 2025)
- ML20151F467 + (19:51:00, 24 May 2025)
- ML20151E689 + (19:53:31, 24 May 2025)
- ML20151E500 + (19:56:34, 24 May 2025)
- ML20151E037 + (19:58:02, 24 May 2025)
- TAC:67698 + (19:58:05, 24 May 2025)
- ML20151E017 + (19:58:06, 24 May 2025)
- L-84-151, Forwards Application for Amend to License NFP-36,consisting of License Change Application 15.Amend Reduces Test Frequency of Emergency Diesel Generators Per Generic Ltr 84-15.Fee Paid + (19:59:23, 24 May 2025)
- ML20151D546 + (19:59:49, 24 May 2025)
- TAC:51606 + (20:00:46, 24 May 2025)
- ML20151C674 + (20:02:45, 24 May 2025)
- ML20151B904 + (20:07:30, 24 May 2025)
- 05000440/LER-1988-025, :on 880618,overtravel of Reactor Protection Sys (RPS) Power Transfer Switch Occurred,Resulting in Loss of Power to Both Busses & Full RPS Actuation.Caused by Personnel Error.Info Tag Installed & Design Change Planned + (20:08:11, 24 May 2025)