Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000293/LER-1998-015-01, Forwards LER 98-015-01, Non-Conservative Degraded Voltage Trip Setpoint, Per 10CFR50.73.Supplement to LER 98-014-00 Was Scheduled to Be Issued 981130,but Will Now Be Issued Once Evaluation & Design Calculations Have Been Com + (12:25:06, 24 May 2025)
- ML20196B532 + (12:25:11, 24 May 2025)
- ML20196B503 + (12:27:05, 24 May 2025)
- ML20196B494 + (12:27:08, 24 May 2025)
- ML20196B471 + (12:27:17, 24 May 2025)
- ML20196B415 + (12:27:35, 24 May 2025)
- ML20196B320 + (12:28:02, 24 May 2025)
- 05000482/LER-1998-006, :on 960119,failure to Correctly Test Portion of Automatic Level Control Circuitry of EDG Fuel Oil Transfer Sys Was Noted.Caused by Failure to Ensure well-constructed License Amend Was Submitted.Revised Procedures & Forms + (12:28:33, 24 May 2025)
- 05000482/LER-1999-007, :on 990519,action Statement 19 of TS 3.3.2 Was Violated.Caused by Inadequate Work Practices.Revised Procedure & Discussed Expectations with Maint & Operations Personnel + (12:28:34, 24 May 2025)
- ML20196B206 + (12:28:35, 24 May 2025)
- ML20196B151 + (12:28:52, 24 May 2025)
- TAC:M93477 + (12:28:56, 24 May 2025)
- ML20196B125 + (12:28:59, 24 May 2025)
- 05000456/LER-1998-004-01, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations + (12:29:32, 24 May 2025)
- ML20196A885 + (12:30:17, 24 May 2025)
- 05000423/LER-1998-042, :on 981020,identified That TS Definition of Analog Channel Operational Test Not Met.Caused by Inadequate Verification of Compliance of Surveillance Procedure with TS Definition.Procedures Revised + (12:30:20, 24 May 2025)
- ML20196A873 + (12:30:21, 24 May 2025)
- ML20196A793 + (12:30:42, 24 May 2025)
- ML20196A660 + (12:31:19, 24 May 2025)
- ML20196A562 + (12:32:01, 24 May 2025)
- ML20196A530 + (12:32:08, 24 May 2025)
- 05000338/LER-1988-025-01, :on 881101,Tech Spec 3.6.2.2 Violated.Caused by One Recirculation Spray Subsystem W/One Casing Cooling Subsystem Inoperable.Functional Testing on Casing Cooling Tank Level Transmitters Stopped + (12:32:18, 24 May 2025)
- ML20196A503 + (12:32:20, 24 May 2025)
- 05000373/LER-1988-002-03, :on 880316,Type B & Type C Total Leakage Exceeded 0.6 La During Leak Rate Testing.Caused by Excessive Leakages.Corrective Actions Include Installment of New Disc Listed in Table 1 + (12:32:23, 24 May 2025)
- 05000423/LER-1988-018, :on 880519,two Reportable Events Re Control Bldg Inlet Ventilation High Radiation Control Bldg Isolation Trip Setpoint Discovered.Caused by Administrative Error. Default Values Changed to Comply W/Tech Specs + (12:32:25, 24 May 2025)
- ML20196A484 + (12:32:27, 24 May 2025)
- ML20196A441 + (12:32:40, 24 May 2025)
- ML20196A360 + (12:33:02, 24 May 2025)
- ML20196A347 + (12:33:06, 24 May 2025)
- ML20196A331 + (12:33:15, 24 May 2025)
- ML20196A327 + (12:33:16, 24 May 2025)
- ML20196A324 + (12:33:18, 24 May 2025)
- ML20196A318 + (12:33:20, 24 May 2025)
- ML20196A304 + (12:33:26, 24 May 2025)
- 05000499/LER-1998-003-01, :on 981016,discovered Missed Tube Insp in SG 2B,per TS Surveillance 4.4.5.2.Caused by Lack of Addl Controls to Prevent Re SG Tube Insp Data.Licensee Revised 2FE05 Insp Records & SG Insp Database.With + (12:33:30, 24 May 2025)
- ML20196A285 + (12:33:34, 24 May 2025)
- 05000277/LER-1987-031-01, :on 871231,recognized That Extraction Steam Block Valves Have Common Electrical Feed & Will Fail Closed on Loss of Power.Caused by Error During Design Process. Plant Mod Will Be Implemented, + (12:33:36, 24 May 2025)
- 05000412/LER-1988-017, :on 881005,benchboard Position Indication Lights for PORV Showed Dual Indication.Caused by Degraded Wiring & Gaskets.Gaskets Replaced W/Improved Model.Porvs Returned to Operable Status + (12:33:38, 24 May 2025)
- ML20196A240 + (12:33:55, 24 May 2025)
- TAC:66674 + (12:33:58, 24 May 2025)
- ML20196A217 + (12:34:04, 24 May 2025)
- ML20196A213 + (12:34:07, 24 May 2025)
- ML20196A193 + (12:34:13, 24 May 2025)
- ML20196A180 + (12:34:18, 24 May 2025)
- ML20196A171 + (12:34:21, 24 May 2025)
- ML20196A169 + (12:34:22, 24 May 2025)
- ML20196A161 + (12:34:25, 24 May 2025)
- 05000333/LER-1999-004-01, :on 990403,two Electrical Leads in 09-30 Panel in Relay Room Were Found Unlanded.Caused by Inattention to Detail & Inadequate Process to Ensure Complete Protective Tag.Performed Extent of Condition Walkdowns.With + (12:34:33, 24 May 2025)
- 05000425/LER-1998-009, :on 981021,trouble Alarm Was Received for Train B ESFAS Sequencer Due to Inoperability.Caused by Inability to Interpret Initial Conditions.Sequencer Was down-powered to Replace Field Buffer Card.With + (12:34:49, 24 May 2025)
- ML20196A093 + (12:34:53, 24 May 2025)
- 05000456/LER-1999-001-06, :on 990516,both Trains of LPSI Were Declared Inoperable.Caused by Leakage of SI Accumulator Water.Design Changes Were Implemented to Install Local High Point Vents in Common Portion of Rh Sys Piping to 1B & 1C RCS + (12:35:05, 24 May 2025)