Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197H468 + (10:44:48, 24 May 2025)
- ML20197H429 + (10:44:59, 24 May 2025)
- ML20197H382 + (10:45:08, 24 May 2025)
- IR 05000289/1985098 + (10:45:29, 24 May 2025)
- 05000250/LER-1984-016, :on 840513,isotopic Analysis for Iodines in RCS Not Performed within Required Time Interval.Caused by Poor Communication Between Operations & Chemistry Personnel.Addl Training Given & Sampling Procedure Revised + (10:46:02, 24 May 2025)
- NPL-97-0826, Forwards Dec 1997 Rev to Plant Fsar,Iaw 10CFR50.4(b)(6).Rev Conducted to Comply W/License Amends Which Required Relocation of Turbine Overspeed Protection TSs to FSAR + (10:46:14, 24 May 2025)
- 05000388/LER-1986-006-01, :on 860413,inboard Containment Isolation Valve Closed & RWCU Pumps Tripped.Caused by Isolation of RWCU During High Differential Flow as RWCU Filter/Demineralizer Being Returned to Svc.No Action Planned + (10:46:29, 24 May 2025)
- ML20197H106 + (10:46:45, 24 May 2025)
- 05000458/LER-1986-029, :on 860405,standby Svc Water Sys Experienced Inadvertent Start.Caused by Electrical Transient.Standby Svc Water Pump Secured + (10:47:32, 24 May 2025)
- ML20197H017 + (10:47:40, 24 May 2025)
- ML20197H004 + (10:47:44, 24 May 2025)
- 05000416/LER-1984-029, :on 840422,when Plant Changed Operating Modes to Startup,Proper Surveillance to Prove Operability of Drywell Purge Compressor B Not Completed.Caused by Personnel Error + (10:47:52, 24 May 2025)
- 05000324/LER-1998-002-01, :on 980708,excessive FW Temp Reduction Was Noted as Result of Loss of Stator CW with Main Turbine. Caused by Failure to Analyze Worst Case Lfwh Transient. Process Computer Databank Was Updated.With + (10:48:22, 24 May 2025)
- 05000387/LER-1986-016, :on 860412,automatic Scram Signal Generated on Reactor Protection Sys When Reactor Vessel Water Level Dropped.Caused by Vessel Level Indication Error Resulting from Valve Pack Leak.Event Reviewed by Staff + (10:48:26, 24 May 2025)
- 05000277/LER-1998-007-02, :on 981107,failure to Meet TS & Associated LCO Requirments of Absolute Difference in APRM & Calculated Power of Less than 2% Was Noted.Caused by Substitute Valves Being Used.Removed Substitute Valves.With + (10:48:31, 24 May 2025)
- ML20197G880 + (10:48:56, 24 May 2025)
- ML20197G862 + (10:49:01, 24 May 2025)
- IR 05000322/1986003 + (10:49:05, 24 May 2025)
- IR 05000413/1997003 + (10:49:31, 24 May 2025)
- TAC:51701 + (10:49:35, 24 May 2025)
- 05000373/LER-1984-028, :on 840513,spurious Closure of Div II RCIC Steam Line High Temp Isolation Switch Caused Steam Line to Isolate & Turbine to Trip.Temp Switches Recalibr + (10:49:40, 24 May 2025)
- 05000339/LER-1986-007-01, :on 860416,trip Occurred During Throttle valve- Governor Valve Transfer.Caused by Turbine First Stage Pressure Spike.Investigation of Electro Hydraulic Control Sys Underway + (10:49:42, 24 May 2025)
- ML20197G694 + (10:49:44, 24 May 2025)
- IR 05000324/1996013 + (10:49:46, 24 May 2025)
- ML20197G674 + (10:49:50, 24 May 2025)
- ML20197G668 + (10:49:52, 24 May 2025)
- ML20197G657 + (10:49:55, 24 May 2025)
- ML20197G645 + (10:49:59, 24 May 2025)
- ML20197G627 + (10:50:05, 24 May 2025)
- ML20197G619 + (10:50:08, 24 May 2025)
- 05000282/LER-1998-017, :on 981103,failure to Test SR Hi Flux Trip Functions During non-refueling Outages as Required by TS 4.1-1A Was Noted.Caused by No Sp Existing to Test SR Hfr Trip Logic Function.Developed Procedure for Testing + (10:50:14, 24 May 2025)
- 05000304/LER-1997-009-08, :on 971202,test Relay SIX1-AX Did Not Unlatch as Required During Restoration of PT 10-3.Caused by Failure to Follow Procedures.Rewired Test Relay SIX1-AX + (10:50:18, 24 May 2025)
- IR 05000298/1988004 + (10:50:26, 24 May 2025)
- ML20197G534 + (10:50:31, 24 May 2025)
- IR 05000267/1988003 + (10:50:34, 24 May 2025)
- ML20197G511 + (10:50:37, 24 May 2025)
- ML20197G497 + (10:50:41, 24 May 2025)
- ML20197G485 + (10:50:48, 24 May 2025)
- TAC:51953 + (10:50:49, 24 May 2025)
- 05000295/LER-1997-025-02, :on 971124,visual Insp of Reactor Cavity Area Was Not Performed Per Ts.Caused by Inadequate Review of TSS 15.6.21 Procedure Performed in 1991.Revised TSS 15.6.21 Procedure + (10:50:52, 24 May 2025)
- ML20197G419 + (10:51:05, 24 May 2025)
- NUREG-0801, Forwards Comments on Program Plan for Detailed Control Room Design Review (Dcrdr).Program Plan Addresses All Required Elements of DCRDR.In-progress Audit Not Planned + (10:51:09, 24 May 2025)
- 05000445/LER-1997-004-02, Forwards LER 97-004-02 Re Issues Discovered During Review of GL 96-01 Associated W/Ts Surveillances + (10:51:37, 24 May 2025)
- 05000295/LER-1997-021-01, Forwards LER 97-021-01,per 10CFR50.73(a)(2)(i)(B). Commitments Associated W/Correspondence,Encl + (10:52:13, 24 May 2025)
- IR 05000344/1986006 + (10:52:30, 24 May 2025)
- IR 05000192/1988001 + (10:52:35, 24 May 2025)
- IR 05000443/1996003 + (10:52:49, 24 May 2025)
- ML20197F960 + (10:52:52, 24 May 2025)
- CY-97-155, Requests Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements. Request Is That Applicable Parts of Previously Granted Exemption to 10CFR70.24 Be Reapproved.Justification for Request,Encl + (10:53:07, 24 May 2025)
- IR 05000298/1988010 + (10:53:23, 24 May 2025)
- ML20197F748 + (10:53:38, 24 May 2025)