IR 05000289/1985098

From kanterella
Jump to navigation Jump to search
Forwards Final SALP Rept 50-289/85-98 for 850916-860110, Initially Forwarded on 860317.Based on 860421 Written Comments,No Changes Required.Revised Page Issued to Correct Typos
ML20197H310
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/14/1986
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20197H314 List:
References
NUDOCS 8605190131
Download: ML20197H310 (6)


Text

. -

._ .

r

-

MAY 141986 Docket No. 50-289 GPU Nuclear Corporation ATTN: Mr. H. D. Hukill Vice President and Director of TMI-1 P. O. Box 480 Middletown, Pennsylvania 17057 Gentlemen:

Subject: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP);

REPORT NO. 50-289/85-98 This letter refers to the SALP of Three Mile Island Unit 1 for the period of September 16, 1985 through January 10, 1986, initially forwarded to you by our March 17,1986 letter (Enclosure 1). This SALP evaluation was discussed with you and your staff at a meeting held on March 31,1986 (see Enclosure 2 for attendees). We have reviewed your April 21, 1986 written comments (Enclosure 3) and herewith transmit the final report (Enclosure 4). Based on a review of your comments, no substantive changes to the original March 17, 1986 report are required. We have, however, issued a revised page to correct typographical error Our overall assessment is that you and your staff have demonstrated competent management, exercised good control of activities, maintained a positive atti-tude, and have been responsive to NRC concern Your cooperation in the SALP program is appreciate

Sincerely, Original bigned by Themas E. Murley, Thomas E. Murley Regional Administrator

Enclosures:

NRC Region I letter - T. E. Murley to H. D. Hukill, March 17, 1986 SALP Meeting Attendees GPUN letter, H. D. Hukill to T. E. Murley, April 21, 1986 SALP Report 50-289/85-98

,

, OFFICIAL RECORD COPY 266BAUNACK5/6/86 - 0001.0.0-9605190131 860514 PDR I O ADOCK 05000289 I PDR l

- . - . . . _ . , - . - - - . . .. - . - _ .

.__,4c a- ,.._, a w -, 4 .m-. sa . .- a. .~-. -

. .

i i *

GPU Nuclear Corporation 2

.

I

REGION I o, c 631 PARK AVENUE

-

D KING OF PRUSSIA, PENNSYLVANIA 19406

% . . . . . ,o MAR 171986 Docket No. 50-289 GPU Nuclear Corporation ATTN: Mr. H. D. Hukill Director, TMI-l P. O. Box 480 Middletown, PA 17057 Gentlemen:

Subject: Systematic Assessment of Licensee Performance (SALP); Report No. 50-289/85-98 The NRC Region I SALP Board conducted a review on January 24, 1986, and evalu- I ated the performance of activities associated with the Three Mile Island (Unit 1) Nuclear Generating Station. The results of this assessment are documented in the enclosed SALP report, which covers the pericd September 16, 1985, to January 10, 1986. A meeting to discuss the report is scheduled for March 31, 1986, at King of Prussi t, At the meeting, you should be prepared to discuss our assessment and any plans you may have to improve your performance. Any comments you may have regarding our report may be discussed at the meeting. Additionally, you may provide written comments within twenty days after the meetin Following our meeting and receipt of your response, the enclosed report, your respo.nse, and summary of our findings and planned actions will be placed in the NRC Public Document Roo Your cooperation is appreciate

Sincerely, Thomas E. Murley Regional. Administrator Enclosure:

As stated f7s i mi SM

,

. nyn -

- .. .

.

.E' .

.

GPU Nuclear Corporation 2

.

cc w/encis:

R. J. Tecle, Dperations and Maintenance Director, TMI-l C. W. Smyth, Manager, TMI-l Licensing R. J. McGoey, Manager, PWR Licensing G. F. Trowbridge, Esquire TMI-1 Hearing Service List Public Document Room (PDR) ,

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania s

i i

I

'

l

I i

l l

l I

.

- - _ . . ._ .- . .--- . _.-

,

. .

{ -

-

.

Enclosure 2

.

TMI-I PRINCIPAL SALP ATTENDEES i

GPUN f

P. Clark, President

,

R. Heward, Vice President, Radiological and Environmental Controls H. Hukill, Vice President and Director, TMI-1 3

>

'

R. J. Toole, Operations and Maintenance Director N. Kazanas, Director, Quality Assurance J. Thorpe, Director, Licensing and Regulatory Affairs G. Kuehn, Manager, Radiological Controls

C. Smythe, TMI-I Licensing Manager NRC i

T. Murley, Regional Administrator R. Starostecki, Director, Division of Reactor Projects (DRP)

j S. Ebneter, Director, Division of Reactor Safety (DRS)

l W. Kane, Deputy Director, Division of Reactor Projects

W. Johnston, Deputy Director, DRS

) H. Kister, Chief, Projects Branch No.1, Division of Reactor Projects i

R. Blough, Chief, Reactor Projects Section 1A, DRP R. Conte, Senior Resident Inspector (iMI-1)

R. Weller, Section Leader, Project Directorate No. 6, NRR J. Thoma, TMI-1 Operating Reactors Project Manager, NRR

]- L. J. Callan, Chief, Performance Appraisia Section, IE F. Young, Resident Inspector (TMI-1)

! D. Johnson, Resident Inspector (TMI-1)

W. Baunack, Project Engineer, Projects Section 1A, DRP t Commonwealth of Pennsylvania

'

A. Bhattacharyya, Nuclear Engineer ,

i l

I  !

. l

,

.

!

.

_ -_ A