Discusses Safety Insp Repts 50-266/85-13 & 50-301/85-13 on 850722-26 & Forwards Notice of Violation.Violation Re Lack of Evaluation & Reportability of Auxiliary Feedwater Flow Transmitters Closed
ML20197H106
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/14/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20197H112 List:
References
NUDOCS 8605190062
Download: ML20197H106 (2)


See also: IR 05000266/1985013

Text

.-

.

MAY 141986

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice President

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the special safety inspection (Inspection Report Nos.

50-266/85013 and 50-301/85013) conducted by Mr. R. C. Wilson and other NRC

representatives on July 22-26, 1985, of activities at the Point Beach Nuclear

Plant, Units 1 and 2, authorized by NRC Licenses No. DPR-24 and No. DPR-27,

and to the discussion of our findings with Mr. C. W. Fay and other members of

his staff at the conclusion of the inspection.

The purpose of the inspection was to review the implementation of your EQ

program in accordance with requirements of 10 CFR 50.49. During this inspection,

four of these activities appeared to be in violation of NRC requirements, and

were specified in Appendix A of our November 1, 1985, Report Nos. 50-266/85013

and 50-301/85013 as Potential Enforcement / Unresolved items. The enclosed

Notice of Violation addresses two of these issues (50-266/85013-02(DRS);

50-301/85013-02(DRS) and 50-266/85013-03(DRS); 50-301/85013-03(DRS)) as

violations of 10 CFR 50.49. A written response is required.

One of the remaining two items (50-266/85013-01(DRS); 50-301/85013-01(DRS)),

concerning a lack of licensee evaluation and reportability of the auxiliary

feedwater flow transmitters, has been addressed as part of item

50-266/85013-02(DRS); 50-301/85013-02(DRS), in the enclosed Notice of Violation.

This item was tracked as Item 50-266/85013-01(DRS);50-301/85013-01(DRS)and

has been closed.

Item 50-266/85013-04(DRS);50-301/85013-04(DRS)concerninganapparent

lack of evidence that Limitorque DC operators, MS 2019 and 2020 were type

tested in the same configuration as installed in the plant, is considered

an Unresolved Item pending further review of the tested configuration.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

. _ .

8605190062 860514

PDR

ADOCK O

26

e

i

I[

N> f o/

.

.

Wisconsin Electric Power

2

MAY 14198S

Company

The responses directed by this letter and the accompanying Notice (Order)

are not subject to the clearance procedures of the Office of Management

and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

'

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~'

Cri:inal SIPCd D' U U UWICO

J. J. Harrison, Chief

Engineering Branch

Enclosure: Notice of Violation

cc w/ enclosure:

J. J. Zach, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

Commission

4

i

N

RIII

RIII

RIII

IE

RI I

RI(ITv'

'

A9Q

Sm(eegge

QC

Jy

JwA

Gautam/jk

Muffett

Potapovs

Jack w

Harri on

05/13/86

05/g/86 05/lA/86

05/ /86

05/p/86 05// '/86

i

-

- _ - -

.

-

- -

. -

-

_ _ . .