Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000370/LER-1997-004, (S)-00:on 971204,discovered Deliberate Damage to Unit 2 Personnel Airlock Door Seals.Caused by Tampering. Immediately Placed Security Personnel at Containment Access & Personnel Asked to Heighten Awareness of Surroundings + (10:02:48, 24 May 2025)
- ML20198D715 + (10:03:02, 24 May 2025)
- L-97-078, Provides Conclusion of plant-specific Analysis Re Fuel Rod Internal Pressure Issue.Notification Satisfies Agreement Reached at WOG & NRC 971113 Mgt Meeting + (10:03:11, 24 May 2025)
- TAC:M85571 + (10:03:19, 24 May 2025)
- ML20198D567 + (10:03:50, 24 May 2025)
- ML20198D546 + (10:03:57, 24 May 2025)
- ML20198D515 + (10:04:08, 24 May 2025)
- L-97-073, Application for Amend,Consisting of Proposed Change Requests 218 & 85,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors + (10:04:36, 24 May 2025)
- ML20198D367 + (10:04:43, 24 May 2025)
- TXX-9224, Monthly Operating Rept for April 1992 for CPSES 1 + (10:05:01, 24 May 2025)
- NPL-97-0538, Forwards Proprietary & non-proprietary Slide Presentation, 14 X 14,0.422 Inch Od,Vantage + (422V+) Fuel Design Application for Point Beach Units 1 & 2, Used During 970805 Meeting Between Licensee & Nrc.Proprietary Info Withheld + (10:05:18, 24 May 2025)
- DD-98-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 981222 + (10:05:19, 24 May 2025)
- ML20198D220 + (10:05:23, 24 May 2025)
- ML20198D132 + (10:05:43, 24 May 2025)
- ML20198D042 + (10:06:03, 24 May 2025)
- IR 05000245/1991005 + (10:06:16, 24 May 2025)
- IR 05000267/1985031 + (10:06:28, 24 May 2025)
- ML20198C922 + (10:06:38, 24 May 2025)
- ML20198C905 + (10:06:44, 24 May 2025)
- ML20198C887 + (10:06:51, 24 May 2025)
- ML20198C813 + (10:07:14, 24 May 2025)
- ML20198C807 + (10:07:17, 24 May 2025)
- ML20198C788 + (10:07:22, 24 May 2025)
- ML20198C682 + (10:08:06, 24 May 2025)
- ML20198C521 + (10:09:27, 24 May 2025)
- DCL-85-264, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence + (10:09:36, 24 May 2025)
- ML20198C456 + (10:10:52, 24 May 2025)
- ML20198C443 + (10:10:54, 24 May 2025)
- 05000413/LER-1990-025, Notifies of Missed Commitment & Change in Commitment Re LER 90-025 & Insp Repts 50-413/90-09 & 50-414/90-09.Prior Commitment Is Being Changed to Allow Continued Use of Vendor Methodology + (10:11:07, 24 May 2025)
- ML20198C367 + (10:11:13, 24 May 2025)
- ML20198C354 + (10:11:16, 24 May 2025)
- ML20198C305 + (10:11:34, 24 May 2025)
- IR 05000278/1985032 + (10:11:39, 24 May 2025)
- IR 05000395/1985033 + (10:11:41, 24 May 2025)
- TAC:60478 + (10:12:07, 24 May 2025)
- IR 05000443/1998009 + (10:12:17, 24 May 2025)
- 05000293/LER-1997-027, :on 971128,EDG Winter Ambient Air Temp Occurred.Caused by Ambiguity in Fsar.Compensatory Measures Will Be Instituted When Diesel Generators Not Running + (10:12:31, 24 May 2025)
- L-98-221, Forwards Proposed Change to BVPS QAP Description Included in Unit 2 Ufsar,For Approval.Change Will Reduce QAP Description Commitments for Units 1 & 2 by Allowing Conditional Release to Site of Matl & Equipment + (10:12:46, 24 May 2025)
- L-97-034, Forwards Cycle 13 Reload & COLR, Updated to Include New Radial Peaking Factor at Rated Thermal Power Limits for Unrodded Core Planes.Cycle 13 Reload Design,Discussed + (10:13:15, 24 May 2025)
- ML20198B897 + (10:13:26, 24 May 2025)
- L-98-235, Forwards Beaver Valley Powwer Station Unit 1 Simulator Four Yr Certification Rept 1995 - 1998, IAW 10CFR55.45 + (10:13:42, 24 May 2025)
- TAC:57335 + (10:13:57, 24 May 2025)
- A05364, Forwards Addl Response to Generic Ltr 83-28,Item 1.2, Post- Trip Review:Data & Info Capabilities, Per 860415 Telcon. Status of Responses to Generic Ltr Also Encl.All Action Items Either Complete or Closed + (10:14:22, 24 May 2025)
- ML20198B630 + (10:14:32, 24 May 2025)
- ML20198B618 + (10:14:35, 24 May 2025)
- 05000293/LER-1997-011-02, Forwards LER 97-011-02 Re SSW Sys Single Failure Vulnerability IAW 10CFR50.73.Commitments Made within Ltr, Submitted + (10:14:37, 24 May 2025)
- IR 05000483/1985001 + (10:15:10, 24 May 2025)
- ML20198B414 + (10:15:33, 24 May 2025)
- ML20198B405 + (10:15:35, 24 May 2025)
- 05000423/LER-1998-044, :on 981111,manual Reactor Trip Initiated When Differential Pressure Between a & B CWS Condensers Measured Greater than 2 Inches Water Gauge.Caused by High Levels of Debris Impinging.Modified Procedures + (10:15:55, 24 May 2025)
- ML20198B307 + (10:16:00, 24 May 2025)