ENCLOSURE 1
Entergy Operations, Inc.
Docket No.:
50-382
Waterford Steam Electric Station, Unit 3
License No.:
- NPF-38
During an NRC inspection conducted November 17 through December 5,1997, a violation of
NRC requirements was identified. In accoroance with the " General Staternent of Policy and
Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:
Criterion XVI of Appendix B to 10 CFR Part 50 states, in part, measures sitall be
established to assure that conditions adverse to quality, such as nonconformances, are
promptly identified and corrected.
Procedure W2.501, " Corrective Action," Step 4.9, stated, in part, that a nonconforming
condition is an adverse condition affecting a safety-related system caused by a
deficiency in a caracteristic that renders the quality of the item indeterminate.
Step 4.9.2 stated that discovery of a condition of a system or component required to be
operable by Technical Specifications, which calls into question the current or past
operability, is an example of a nonconforming condition. Step 6.1.1 stated, in part, that
an individual who identifies an adverse condition shall complete Sections 1,2, and 3 of
Attachment I (the co.idition report form) in accordance with the instructions given in the
attachment.
Contrary to the above, on Fabruary 24,1997, an individual, who identified an adverse
condition affecting a safety-related system, failed to promptly identify a nonconformance
that called into question the operability of a system required to be operable by Technical
Specifications. Specifically, the individual identified an adverse condition related to the
refueling water storage pool level instrumentation and did not promptly complete a
condition report form.
This is a Severity Level IV violation (50-382/9727-01) (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201, Entergy Operations, Inc. is hereby required to
submit a written statement or explanation to the U.S. Nuclear Reguistory Commission, ATTN:
Document Control Desk, Washington, D.C. 20555 ivith a copy to the Regional Administrator,
Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011, and a copy to the NRC
Resident inspector i.t the facility that is the subject of this Notice, within 30 days of the date of
the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a
" Reply to a Notice of Violation" and should include for each violation: (1) the reason for the
violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have
been taken and the results achieved, (3) the corrective steps that will be taken to avoid further
violations, and (4) the date when full conipliance will be achieved. Your response may reference
9801070279 980102
l
ADOCK 05000382
G
-
-.
-
- -
..
-
-.
- - -
_.
.- -
-
2-
,
or include previous docketed correspondence, if the correspondence adequately addresses the
. required response, if an adequate reply is not received within the time specified in this Notice,
an order or a Demand for Information may be issued as to why the license should not be
- modified, suspended, or revoked, or why such other action as may be proper should not be
taken. Where good cause is shown, consideration will be given to extending the response time,
Because your response will be placed in the NRC Public Document Room (PDR), to the extent
possible, it should not include any personal privacy, proprietary, or safeguards information so
that it can bo placed in the PDR without redaction. However, if you find it necessary to include
such information, you should clearly indicate the specific information that you desire not to be
placed in the PDR, and provide the legal basis to support your request for withholding the
- information from the pubM.
. Dated at Arlington, Texas
this 2 day of January,1998
,