Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000361/1999004 + (01:27:00, 24 May 2025)
- IR 05000324/1988024 + (01:27:01, 24 May 2025)
- ML20206B439 + (01:28:28, 24 May 2025)
- L-99-016, 1998 Annual Environ Operating Rept (Nonradiological) for Jm Farley Nuclear Plant. with + (01:28:42, 24 May 2025)
- IR 05000443/1999001 + (01:28:52, 24 May 2025)
- NUREG-0649, Summary of ACRS Subcommittee on Auxiliary Sys 880810 Meeting in Washington,Dc to Discuss Proposed Resolution of USI A-17, Sys Interactions in Nuclear Power Plants. Related Info, Including List of Submitted Documents Encl + (01:29:25, 24 May 2025)
- 05000315/LER-1982-010-04, /04T-1:on 820311 & 12,unplanned Gas Release of Approx 94.7 Ci Occurred W/O Sampling & Analysis Per Tech Specs.Caused by Lifting of Safety Valve 2-SV-38 at 63 Psi Below Correct Level of 140 Psi.Valve Replaced + (01:29:44, 24 May 2025)
- TAC:60471 + (01:30:26, 24 May 2025)
- IR 05000327/1988033 + (01:31:36, 24 May 2025)
- ML20206A767 + (01:31:43, 24 May 2025)
- TAC:69868 + (01:31:47, 24 May 2025)
- TAC:65593 + (01:31:55, 24 May 2025)
- ML20206A643 + (01:32:20, 24 May 2025)
- ML20206A549 + (01:32:46, 24 May 2025)
- ML20206A525 + (01:32:52, 24 May 2025)
- IR 05000395/1988017 + (01:32:56, 24 May 2025)
- IR 05000335/1988020 + (01:33:13, 24 May 2025)
- ML20206A445 + (01:33:14, 24 May 2025)
- TAC:MA1738 + (01:34:23, 24 May 2025)
- 05000277/LER-1999-003, :on 990318,failure to Maintain Provisions of Fire Protection Program Was Noted.Caused by Previous Analysis Which Contained Erroneous Info Re Effects of Sump Room Flooding.Temporary Plant Alterations Were Installed + (01:36:43, 24 May 2025)
- IR 05000455/1986010 + (01:37:12, 24 May 2025)
- 05000529/LER-1999-002, :on 990318,discovered MSSV Lift Pressures That Were Outside of TS Limits.Caused by Valve Disc Bonding with Nozzle Seat or Setpoint Drift.Affected Valves Were Adjusted, retested,refurbished,re-certified &/Or Returned to Svc + (01:39:08, 24 May 2025)
- IR 05000373/1986004 + (01:39:45, 24 May 2025)
- ML20205T198 + (01:39:55, 24 May 2025)
- ML20205T191 + (01:39:57, 24 May 2025)
- NUREG-1232, Forwards Safety Evaluation Accepting Improvement Plan for Emergency Diesel Generators Transient Voltage Response.Mods Remain Scheduled by TVA for Completions Prior to Restart of Unit 1,Cycle 4 Refueling Outage + (01:40:39, 24 May 2025)
- ML20205T095 + (01:40:55, 24 May 2025)
- ML20205T042 + (01:41:07, 24 May 2025)
- TAC:L20002 + (01:41:39, 24 May 2025)
- IR 05000338/1988022 + (01:42:04, 24 May 2025)
- IR 05000312/1988025 + (01:42:08, 24 May 2025)
- IR 05000322/1986021 + (01:43:20, 24 May 2025)
- ML20205S547 + (01:43:41, 24 May 2025)
- 05000336/LER-1999-007, :on 990319,failure to Monitor SG Primary & Secondary Coolant Temperatures IAW TS Surveillance Requirement 4.7.2.1,was Discovered.Caused by Procedural Inadequacies.Personnel Provided with Briefings + (01:43:59, 24 May 2025)
- IR 05000213/1986002 + (01:44:00, 24 May 2025)
- 05000369/LER-1999-001, (S)-00:on 990317,discovered Unescorted Access Authorization of Contract Employee Falsely Obtained.Caused by Employee Willful Falsification of Info.Employee Unescorted Access Was Terminated on 990317 + (01:44:33, 24 May 2025)
- ML20205S395 + (01:44:47, 24 May 2025)
- ML20205S331 + (01:45:04, 24 May 2025)
- TAC:M97098 + (01:45:13, 24 May 2025)
- IR 05000269/1986017 + (01:45:18, 24 May 2025)
- ML20205S266 + (01:45:21, 24 May 2025)
- IR 05000400/1987008 + (01:45:25, 24 May 2025)
- TAC:60467 + (01:45:35, 24 May 2025)
- ML20205S145 + (01:45:58, 24 May 2025)
- IR 05000327/1985049 + (01:46:23, 24 May 2025)
- U-600563, Radiological Environ Monitoring Rept Preoperational Stage, 1985 + (01:46:36, 24 May 2025)
- DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Directors Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action + (01:46:56, 24 May 2025)
- ML20205R880 + (01:48:40, 24 May 2025)
- ML20205R874 + (01:48:42, 24 May 2025)
- ML20205R844 + (01:48:47, 24 May 2025)