Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206Q203 + (00:02:10, 24 May 2025)
- COM-091, Discusses Issuance of License XCOM-1004,replacing Expired License XCOM-0914,per Elgar Intl Corp Request.License XCOM-1004 Issued Under Waiver of Usual 15-day Waiting Period to Enable Licensee to Meet Late Aug 1986 Shipping Schedule + (00:02:21, 24 May 2025)
- ML20206Q066 + (00:02:40, 24 May 2025)
- TAC:62166 + (00:02:42, 24 May 2025)
- ML20206P837 + (00:03:30, 24 May 2025)
- ML20206P805 + (00:03:41, 24 May 2025)
- 05000282/LER-1998-019, :on 981209,discovered Condition Where Thermally Induced Pressure Transient Has Potential to Overpressurize Containment Penetration Piping Segment.Caused by non- Conservative Assumption.Analyses Performed + (00:03:47, 24 May 2025)
- L-99-004, Submits Request for 60 Day Implementation Period for LARs 258 & 129.Proposed Amends Submitted by ltr,L-98-241,on 981224 Re EDG Parameters & Usable Fuel Oil Requirements of Tech Specs 3.8.1.1 & 3.8.1.2 + (00:03:50, 24 May 2025)
- ML20206P728 + (00:04:02, 24 May 2025)
- 05000382/LER-1998-021, :on 981210,boron Concentration Below TS Limit in SIT 2B,occurred.Caused by Lack of Complete Understanding of Cumulative Effects of Sys Design.B Concentration in SIT 2B Was Returned to within TS Required Concentrations + (00:04:03, 24 May 2025)
- 05000482/LER-1999-004, :on 990412,personnel Discovered That Direct Flow Path Had Been Created Between Containment Bldg Atmosphere & Auxiliary Bldg During Fuel Movement.Caused by Series of Personnel Errors.Operations Mgt Assigned + (00:04:08, 24 May 2025)
- 05000395/LER-1999-005, :on 990412,ESF Components Were Potentially Outside Design Basis of Plant.Caused by Submergence Qualification Issues for Certain ESF Components.All Affected Components Were Verified + (00:04:23, 24 May 2025)
- IR 05000070/1998001 + (00:04:26, 24 May 2025)
- IR 05000302/1999002 + (00:05:27, 24 May 2025)
- ML20206P515 + (00:05:38, 24 May 2025)
- L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With + (00:05:57, 24 May 2025)
- IR 05000266/1985013 + (00:06:18, 24 May 2025)
- 05000336/LER-1998-005-02, Forwards LER 98-005-02,re HELB Deficiencies for Piping Inside Containment Identified on 980318.Commitments Made by Util Also Encl + (00:07:09, 24 May 2025)
- ML20206P212 + (00:07:11, 24 May 2025)
- ML20206P186 + (00:07:17, 24 May 2025)
- ML20206P112 + (00:07:32, 24 May 2025)
- 05000458/LER-1999-007, :on 990410,inadvertent Containment Isolation Valve Closure Occurred Due to Tagging Deficiency.Caused by Less than Adequate Work Practices.Plant Was Shutdown for Scheduled RFO & Subject Valves Shifted to Closed Position + (00:07:34, 24 May 2025)
- TAC:60657 + (00:07:38, 24 May 2025)
- ML20206P060 + (00:07:43, 24 May 2025)
- 05000483/LER-1998-003-01, Forwards LER 98-003-01 Re Inadvertent Actuation of ESFAS Due to a SG High Level During Refuel 9.Rept Is Submitted to Report Change in C/A from That Reported in Original Rept + (00:07:53, 24 May 2025)
- ML20206N978 + (00:08:09, 24 May 2025)
- L-98-238, LARs 262 & 135 to Licenses DPR-66 & DPR-73,modifying Applicable TS & Bases by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor + (00:08:18, 24 May 2025)
- ML20206N906 + (00:08:30, 24 May 2025)
- TXX-4875, Interim Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units.Initially Reported on 860521.Alternative Solution Currently Being Evaluated by York Intl.Next Rept Due on 860724 + (00:08:44, 24 May 2025)
- ML20206N816 + (00:08:56, 24 May 2025)
- ML20206N793 + (00:09:01, 24 May 2025)
- ML20206N631 + (00:09:59, 24 May 2025)
- ML20206N460 + (00:10:50, 24 May 2025)
- TAC:L32114 + (00:11:12, 24 May 2025)
- ML20206N378 + (00:11:13, 24 May 2025)
- 05000266/LER-1998-028, :on 981113,surveillances Required by Section XI Pressure Test Program Were Missed.Caused by Failure to Take Timely Action on & Implement Corrective Actions for ASME Program Problems.Completed 40 Month Pressure Test + (00:11:38, 24 May 2025)
- ML20206N200 + (00:12:15, 24 May 2025)
- ML20206N171 + (00:12:22, 24 May 2025)
- IR 05000293/1985015 + (00:16:12, 24 May 2025)
- IR 05000250/1988015 + (00:16:46, 24 May 2025)
- 05000424/LER-1998-006-03, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements + (00:17:07, 24 May 2025)
- IR 05000213/1985098 + (00:18:29, 24 May 2025)
- 05000482/LER-1999-003, :on 990409,source Range Instrumentation Was Not Tested Prior to Entering Mode 6.Caused by Inadequate Training.Coached & Trained Personnel + (00:18:32, 24 May 2025)
- ML20206M877 + (00:18:39, 24 May 2025)
- IR 05000387/1985028 + (00:19:29, 24 May 2025)
- ML20206M794 + (00:19:40, 24 May 2025)
- TAC:59005 + (00:20:30, 24 May 2025)
- ML20206M482 + (00:21:03, 24 May 2025)
- ML20206M458 + (00:21:30, 24 May 2025)
- IR 05000346/1988034 + (00:22:43, 24 May 2025)
- ML20206M306 + (00:22:45, 24 May 2025)