Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009C054 + (06:19:55, 23 December 2024)
- STC-20-006, Letter Transmitting Radiogenix Generator Guidance Revision 1 + (06:19:58, 23 December 2024)
- ML20009C051 + (06:20:01, 23 December 2024)
- ML20009C050 + (06:20:02, 23 December 2024)
- ML20009C049 + (06:20:03, 23 December 2024)
- ML20009C047 + (06:20:04, 23 December 2024)
- ML20009C046 + (06:20:05, 23 December 2024)
- ML20009C043 + (06:20:09, 23 December 2024)
- ML20009C039 + (06:20:10, 23 December 2024)
- ML20009C038 + (06:20:11, 23 December 2024)
- ML20009C036 + (06:20:12, 23 December 2024)
- PM-81-584, Forwards Monthly Operating Rept for June 1981 + (06:20:13, 23 December 2024)
- ML20009C034 + (06:20:15, 23 December 2024)
- ML20009C032 + (06:20:16, 23 December 2024)
- RA-81-073, Forwards IE Bulletin 79-14,Safety-Related Piping,Sys Phase 2 Inaccessible Piping Insp Rept, Per Request of Northern States Power Co + (06:20:16, 23 December 2024)
- PM-81-583, Forwards Monthly Operating Rept for June 1981 + (06:20:19, 23 December 2024)
- ML20009C027 + (06:20:21, 23 December 2024)
- ML20009C024 + (06:20:22, 23 December 2024)
- ML20009C023 + (06:20:23, 23 December 2024)
- ML20009C022 + (06:20:24, 23 December 2024)
- BSEP-81-1325, Forwards Monthly Operating Rept for June 1981 + (06:20:25, 23 December 2024)
- ML20009C018 + (06:20:27, 23 December 2024)
- ML20009C017 + (06:20:28, 23 December 2024)
- W3P81-1661, Forwards Amend 20 to Application for Ol,Containing Amend 20 to FSAR + (06:20:29, 23 December 2024)
- 05000331/LER-1981-023-03, /03L-0:on 810611,during Surveillance Testing, Reactor Core Isolation Cooling Steam Line High Flow Pressure Differential Switch Pdis 2442,tripped at 100 Inches of Water.Caused by Instrument Drift.Switch Recalibr + (06:20:32, 23 December 2024)
- A01744, Forwards Evaluation of SEP Topic III-6,seismic Design Considerations.Lists Completion Dates for Reviews & Analyses Needed to Address 18 Open Issues + (06:20:36, 23 December 2024)
- 05000331/LER-1981-023, Forwards LER 81-023/03L-0 + (06:20:41, 23 December 2024)
- ML20009C009 + (06:20:42, 23 December 2024)
- ML20009C010 + (06:20:42, 23 December 2024)
- ML20009C008 + (06:20:44, 23 December 2024)
- ML20009C007 + (06:20:46, 23 December 2024)
- ML20009C006 + (06:20:47, 23 December 2024)
- ML20009C005 + (06:20:48, 23 December 2024)
- ML20009C004 + (06:20:50, 23 December 2024)
- ML20009C003 + (06:20:50, 23 December 2024)
- ML20009C002 + (06:20:52, 23 December 2024)
- ML20009C001 + (06:20:53, 23 December 2024)
- ML20009C000 + (06:20:54, 23 December 2024)
- 05000255/LER-1981-025-01, /01T-0:on 810626,shutdown Sequencers 34-5 & 34-6 Failed During Testing.Caused by Sticking Clutch & Dirty Contacts.Clutch Cleaned & Lubricated.Contacts Cleaned + (06:20:56, 23 December 2024)
- ML20009B998 + (06:21:00, 23 December 2024)
- ML20009B997 + (06:21:01, 23 December 2024)
- 05000255/LER-1981-025, Forwards LER 81-025/01T-0 + (06:21:02, 23 December 2024)
- ML20009B993 + (06:21:07, 23 December 2024)
- ML20009B992 + (06:21:08, 23 December 2024)
- ML20009B991 + (06:21:09, 23 December 2024)
- 05000301/LER-1981-005-03, /03L-0:on 810625,during Normal Operation, Contractor Accidently Tripped Turbine Overspeed Trip Valve on Auxiliary Feedwater Pump.Valve Reset.Contractors Removed from Area & Reminded to Use Caution + (06:21:14, 23 December 2024)
- ML20009B987 + (06:21:16, 23 December 2024)
- 05000301/LER-1981-005, Forwards LER 81-005/03L-0 + (06:21:18, 23 December 2024)
- ML20009B984 + (06:21:19, 23 December 2024)
- ML20009B983 + (06:21:20, 23 December 2024)
- ML20009B982 + (06:21:21, 23 December 2024)