ML20009C032
Jump to navigation
Jump to search
| ML20009C032 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/10/1981 |
| From: | Manry M GEORGIA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20009C033 | List: |
| References | |
| PM-81-584, NUDOCS 8107200189 | |
| Download: ML20009C032 (1) | |
Text
i A
Georgia Power Company Post Office Box 442 Ban;sy. Georgia 31513 l
Tele-5one 912 367-6686 912 367-7781 b
COI U OWCT Edwin I. Hatch Nuclear Plant a
r 4
l l
l July 10, 1981 PM-81-584 i
PLANT E.
I. HATCH NRC Monthly Operating Report Office of Plans and Schedules Directorate of Licensing United States Nuclear Regulatory Commission Washington, D. C.
20545
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Decket #50-366.
T b[
SA M. Manty Plant Manager CLC/pebc
(
0 h00
'7 \\\\ \\
8107200189 810710 i
PDRADOCK05000g R
_ _ _ _ _ _ _ _ _ _