ML20009C050
| ML20009C050 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/10/1981 |
| From: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| To: | NRC |
| Shared Package | |
| ML20009C053 | List: |
| References | |
| NUDOCS 8107200221 | |
| Download: ML20009C050 (1) | |
Text
,
SW2M WNSCORSin Electnc eaara couraur 231 W. MICHIGAN. P.O. BOX 2046, MILWAUKEE. WI S3201 July 10, 191}l Director of Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Gentlemen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are m(athly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of June 1981.
Also included are corrected Operating Data Reports for Point Beach Unit 2 for the month of May 1981 as discussed with Mr. Phil Ross of the NRC Staff on July 9, 1981.
Very truly yours, n __
,O 1dj l
Executive Vice President Sol Burstein Attachments Copies to J. G. Keppler - NRC, Region III
-(h
'~
NRC Resident Inspector 4
,N-b
/3' S /
C.
F. Riederer - PSCW 4
i s/s Ii c
L.g s
,+,j
!b g,3 7
-hk
.x 8107200221 810710 PDR ADOCK 0500C266 R
__