ML20009C007

From kanterella
Jump to navigation Jump to search
Notifies That Reg Guide 1.146 Will Be Fully Implemented by Oct 1981,in Response to Generic Ltr 81-01 Dtd 810504.All Personnel Will Be Certified to Stds of Reg Guide 1.58, Revision 1 Sections C.5,6,7,8 & 10 by Dec 1982
ML20009C007
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/14/1981
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.058, RTR-REGGD-01.146, RTR-REGGD-1.058, RTR-REGGD-1.146 GL-81-01, GL-81-1, NUDOCS 8107200156
Download: ML20009C007 (2)


Text

. _ _ _ _ _ _ _ _ _ _ _ _

r 4 % f ', *n

,@\\

'\\'

/9 umme MW Genemi ElectricConixwly u 6/g +

1 Ba1 D mes 'ke Presdent

, y/

jf July 14, 1981 l

Trojan Nuclear Plant

[

Docket 50-344 License NPF-1 l

l Mr. Darrell G. Eisenhut, Director Division of Licensing l

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

I NRC Generic Letter 81-01 dated May 4, 1981 (Qualification of Inspection, Examination, and Testing and Audit Personnel) requested a commitment l

from licensees to meet Regulatory Guide 1.146 dated August 1980 and l

Sections C.5, 6, 7, 8, and 10 of Regulatory Guide 1.58, Revision 1.

This letter also requested the date by which compliance was expected.

Regulatory Guide 1.146 (8/80) has been carefully reviewed and Portland General Electric (PGE) intends to fully comply with its recommendations.

It is expected that Regulatory Guide 1.146 (8/80) will be completely implemented by October 1981.

Regulatory Guide 1.58, Revision I has also been reviewed and PGE intends to fully comply with the requirements of Sections C.5, 6, 7, 8, and 10.

Present inspection and test personnel are qualified to the standards set by ANSI /ASME N45.2.6 - 1973 and Regulatory Guide 1.58, Revision 0.

However, the current number of inspection and test personnel make it difficult to immediately certify everyone to the revised standards of ANSI /ASME N45.2.6 - 1978 and Regulatory Guide 1.58, Revision 1.

There-fore, PGE plans to certify all new inspection and test personnel to these improved standards and upgrade the certification for existing personnel as their preemat certification expires through the established kool 5

/ O 8107200156 010714 PDR ADOCK 05000344 PDR eet PoAnt Oregon 97204

d i

e W W M CX NT4 M N1)f Mr. Darrell G. Eisenhut July 14, 1981 l

Page two recertification program. It is expected that all personnel will be j

certified to the standards of Regulatory Guide 1.58, Revision 1 Sections C.5, 6, 7, 8, and 10 by December 1982.

Sincerely, Bart D. Withers Vice President i

Nuclear 4

i l

c:

Mr. Lynn Frank, Director State of Oregon Department of Energy i

I g

F L

I' l

I l'

i

-.. _...., _ _. _. - _. _ - _ - _... _ - -.. _.,. -. ~, - _ - -,. -,. - - ~. _ _,. _. -. _...

.