Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20010A515 + (12:34:23, 21 December 2024)
- ML20010A514 + (12:34:24, 21 December 2024)
- ML20010A512 + (12:34:25, 21 December 2024)
- 05000295/LER-1981-029-99, /99X-0:on 810528,inverter 114 Failed,Yielding Safety Injection.Caused by Primary Winding of Master Sola Transformer Which Shorted to Ground,Tripping Inverter & Causing Slave Transformer to Burn Up + (12:34:27, 21 December 2024)
- ML20010A510 + (12:34:28, 21 December 2024)
- ML20010A509 + (12:34:29, 21 December 2024)
- ML20010A507 + (12:34:30, 21 December 2024)
- ML20010A505 + (12:34:31, 21 December 2024)
- 05000295/LER-1981-029, Forwards LER 81-029/99X-0 + (12:34:33, 21 December 2024)
- ML20010A501 + (12:34:34, 21 December 2024)
- 2CAN088103, Advises That First Draft of Core Protection Computer Addressable Constant Determination Methodology Will Be Submitted by 810911 Per 810526 Commitment + (12:34:35, 21 December 2024)
- IR 05000518/1981011 + (12:34:39, 21 December 2024)
- ML20010A497 + (12:34:40, 21 December 2024)
- ML20010A496 + (12:34:41, 21 December 2024)
- ML20010A494 + (12:34:42, 21 December 2024)
- 0CAN078106, Informs That New Computerized Sys Will Manage Training Records,Per Nov 1980 Commitment.No Addl Status Repts Will Be Prepared + (12:34:43, 21 December 2024)
- ML20010A490 + (12:34:45, 21 December 2024)
- ML20010A489 + (12:34:46, 21 December 2024)
- IR 05000321/1981012 + (12:34:47, 21 December 2024)
- PNO-III-81-068, on 810803,crane Boom Collapsed on Roof of Essential Svc Water Pump House While Lifting Concrete Hatch Weighing Approx 12-18 Tons.Rept Will Be Submitted Following Safety Survey + (12:34:50, 21 December 2024)
- TXX-3374, Interim Deficiency Rept Re Alignment Difficulties in Diesel Generator Pipe Supports,Originally Reported on 800926.Weld Program Initiated & Supporting Documentation Compiled to Certify Compliance W/Asme Code + (12:34:51, 21 December 2024)
- 05000311/LER-1981-053-03, /03L-0:on 810701,following Outage,Containment Integrity Established W/O Performing Required Surveillance Procedure.Caused by Personnel Error.Procedure Completed & Personnel Counseled + (12:34:53, 21 December 2024)
- ML20010A480 + (12:34:55, 21 December 2024)
- ML20010A479 + (12:34:56, 21 December 2024)
- IR 05000518/1981010 + (12:34:59, 21 December 2024)
- 05000311/LER-1981-053, Forwards LER 81-053/03L-0.Detailed Event Analysis Encl + (12:35:01, 21 December 2024)
- ML20010A474 + (12:35:02, 21 December 2024)
- ML20010A475 + (12:35:02, 21 December 2024)
- ML20010A473 + (12:35:03, 21 December 2024)
- ML20010A472 + (12:35:04, 21 December 2024)
- ML20010A471 + (12:35:06, 21 December 2024)
- 05000220/LER-1981-031-03, /03L-0:on 810704,during Startup W/Reactor at Low Pressure,Emergency Condenser Loop 11 Was Removed from Svc Because of Water Hammer.Caused by Inadequate Draining of Emergency Condenser Sys.Loop Cooled Down & Isolated + (12:35:08, 21 December 2024)
- ML20010A469 + (12:35:09, 21 December 2024)
- ML20010A467 + (12:35:10, 21 December 2024)
- 05000220/LER-1981-031, Forwards LER 81-031/03L-0 + (12:35:11, 21 December 2024)
- ML20010A463 + (12:35:13, 21 December 2024)
- IR 05000454/1981006 + (12:35:14, 21 December 2024)
- ML20010A460 + (12:35:15, 21 December 2024)
- ML20010A458 + (12:35:16, 21 December 2024)
- ML20010A457 + (12:35:17, 21 December 2024)
- ML20010A456 + (12:35:18, 21 December 2024)
- ML20010A455 + (12:35:19, 21 December 2024)
- ML20010A454 + (12:35:20, 21 December 2024)
- ML20010A453 + (12:35:21, 21 December 2024)
- ML20010A452 + (12:35:22, 21 December 2024)
- ML20010A449 + (12:35:23, 21 December 2024)
- ML20010A450 + (12:35:23, 21 December 2024)
- ML20010A447 + (12:35:24, 21 December 2024)
- ML20010A445 + (12:35:25, 21 December 2024)
- ML20010A444 + (12:35:26, 21 December 2024)
- ML20010A442 + (12:35:28, 21 December 2024)