ML20010A445

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-238/81-01 on 810618-19.No Noncompliance Noted
ML20010A445
Person / Time
Site: NS Savannah
Issue date: 07/21/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Levine Z
COMMERCE, DEPT. OF
Shared Package
ML20010A446 List:
References
NUDOCS 8108110438
Download: ML20010A445 (2)


See also: IR 05000238/1981001

Text

e {lc"'

-

JUL 211981

E.

%

. h k(g;

United States Department of Commerce

,s

o

ATTN:

Dr. Zelvin Levine, Director

(y

II.

.,s

U

Of fice of Advanced Ship Operations

liUG 101981 * '--

-

'

Maritime Commission M-930

g

,, 8

Washington, DC 20230

cc w m m

%

Q

Gentlemen:

V

Q

~

Subject: Report No. 50-238/81-1

This refers to the special inspection conducted by Mr. L. A. Franklin of this

office on June 18-19, 1981, of activities authorized by NRC License No. NS-1 for

the N. S. Savannah facility and to the discussion of our findings held with

Mr. C. Clausen, Representative, Maritime Commission, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

interviews with personnel, observations by the inspectors, and independent radi-

ation surveys.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

telephone within ten days from the date of this letter of your intention to fi'e

a request for withholding; and (b) submit within twenty-five days from the date

of this letter' a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part thereof sought to be withheld, and a full

statement of the reasons on the basis of which it is claimed that the information

should be withheld from public disclosure. This section further requires the

statement to address with spec.ificity the considerations listed in 10 CFR 2.790-

(b)(4). The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit. If we do not hear from you in

this regard within the specified periods noted above, the report wi'l be placed

in the Public Document Room.

pl

8108110438 810721

PD9 ADOCK 05000239

61 l

0

PDR

'

"

"

,

JUL 211981

United States Department of Coumerce

2

Should you have any questions concerning this letter. we will be glad to discuss

them with you.

Sincerely,

/3/

R. C. Lewis, Chief

Reactor Projects Branch #.1

Division of Resident and

Reactor Project I;ispection

Enclosure:

Inspection Report No. 50-328/81-1

bcc w/ encl:

Central Files

Local Public Document Room

Washington Public Document Room

Nuclear Safety Information Center

Technical Information Center

Document Management Branch

District of Columbia

(TT

r[f

/

LFrankl'n:ht

Chose

Gibson

R Lewis

7p/81

7//h81

7/Zd/81

7

/81