ML20010A445
| ML20010A445 | |
| Person / Time | |
|---|---|
| Site: | NS Savannah |
| Issue date: | 07/21/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Levine Z COMMERCE, DEPT. OF |
| Shared Package | |
| ML20010A446 | List: |
| References | |
| NUDOCS 8108110438 | |
| Download: ML20010A445 (2) | |
See also: IR 05000238/1981001
Text
e {lc"'
-
JUL 211981
E.
%
. h k(g;
United States Department of Commerce
,s
o
ATTN:
Dr. Zelvin Levine, Director
(y
II.
.,s
U
Of fice of Advanced Ship Operations
liUG 101981 * '--
-
'
Maritime Commission M-930
g
,, 8
Washington, DC 20230
cc w m m
%
Q
Gentlemen:
V
Q
~
Subject: Report No. 50-238/81-1
This refers to the special inspection conducted by Mr. L. A. Franklin of this
office on June 18-19, 1981, of activities authorized by NRC License No. NS-1 for
the N. S. Savannah facility and to the discussion of our findings held with
Mr. C. Clausen, Representative, Maritime Commission, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
interviews with personnel, observations by the inspectors, and independent radi-
ation surveys.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to fi'e
a request for withholding; and (b) submit within twenty-five days from the date
of this letter' a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure. This section further requires the
statement to address with spec.ificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit. If we do not hear from you in
this regard within the specified periods noted above, the report wi'l be placed
in the Public Document Room.
pl
8108110438 810721
PD9 ADOCK 05000239
61 l
0
'
"
"
,
JUL 211981
United States Department of Coumerce
2
Should you have any questions concerning this letter. we will be glad to discuss
them with you.
Sincerely,
/3/
R. C. Lewis, Chief
Reactor Projects Branch #.1
Division of Resident and
Reactor Project I;ispection
Enclosure:
Inspection Report No. 50-328/81-1
bcc w/ encl:
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
District of Columbia
(TT
r[f
/
LFrankl'n:ht
Chose
Gibson
R Lewis
7p/81
7//h81
7/Zd/81
7
/81