Final Deficiency Rept Re Removal of Pipe Supports After Insp,Initially Reported 810220.New Procedure Written to Control Removal & Reinstallation of Pipe Supports.Hangers to Be Reverified at Time of Sys Completion
ML20010A474
Person / Time
Site: Fermi, 05000452, 05000453  DTE Energy icon.png
Issue date: 07/20/1981
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-54128, NUDOCS 8108110459
Download: ML20010A474 (2)


Text

.,

r

..DA/50 85Q Donald A. Wells Detroit MMC-Edison BM7E==

July 20, 1981 EF2-54128 Mr. James G. Keppler Region III U.S. Nuclear Regulatory Cmmission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Final Report of 10CFR50.55(e) Item on Removal of Pipe Supports After Inspection (#39)

Dear Mr. Keppler:

This is subnitted as Detroit Edison's final report on the Renoval of Pipe Supports after DC Inspection and Acceptance problem which was reported per 50.55(e) requirements.

This item was originally reported to Mr. J.E. Xonklin of NRC-Region III by Detroit Edison's Mr. E.A. Walker, Supervisor-Construction Quality Assurance, on February 20, 1981.

It was determined that the problem of removing pipe supports without proper authority applies to all Site Contractors responsible for installation of DA IcVel I Pipe Supports. Constructica management has written a procedure (AP-IV-20) to cover the disassembling and re-assembling of pipe supports.

This procedure will control the renoval and re-installation of pipe supports in the future. At the time of system completmon and turnover walkdowns, the hangers will be re-verified to assure they are installed properly and con-structed to design documents.

If you have questions concerning this matter, please contact Mr. H.A. Walker, Supervisor-Construction Quality Assurance.

c Very truly yours, p

U tr F r

v

/

bi,h

/

dUC IO 198t m [

1 daw /nAw/cp

" * " A " " '*'s y/

Y

'l f

8108110459 810720 PDR ADOCk 05000341 jg S

PDR 6 190

1 t

Mr. James G. Keppler, Director July 27, 1981 EF2-54128 Page Two Mr. Victor Stello, Jr., Director cc:

Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Ccmnission Washington, D.C. 20355 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccmnission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166