Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035D414 + (10:08:13, 20 December 2024)
- ML20035D413 + (10:08:14, 20 December 2024)
- ML20035D412 + (10:08:16, 20 December 2024)
- IR 05000327/1993010 + (10:08:33, 20 December 2024)
- ML20035D410 + (10:08:35, 20 December 2024)
- ML20035D406 + (10:08:36, 20 December 2024)
- ML20035D405 + (10:08:37, 20 December 2024)
- ML20035D403 + (10:08:38, 20 December 2024)
- ML20035D400 + (10:08:40, 20 December 2024)
- ML20035D399 + (10:08:41, 20 December 2024)
- ML20035D398 + (10:08:42, 20 December 2024)
- ML20035D397 + (10:08:43, 20 December 2024)
- ML20035D395 + (10:08:47, 20 December 2024)
- ML20035D392 + (10:08:49, 20 December 2024)
- ML20035D391 + (10:08:50, 20 December 2024)
- ML20035D390 + (10:08:51, 20 December 2024)
- ML20035D389 + (10:08:52, 20 December 2024)
- ML20035D387 + (10:08:55, 20 December 2024)
- 05000338/LER-1993-010, :on 930323,SWP Started Unexpectedly During Performance of Reactor Protection & ESF Response Time Testing.Caused by Inadequate Procedures.Procedures Will Be Revised Prior to Next Refueling Outage + (10:08:56, 20 December 2024)
- 05000278/LER-1993-003-03, :on 930310,discovered That Reactor Vessel Head Vents Closed & pressure-temp Data Not Obtained.Caused by Operator Not Fully Moving Control Switches to Auto Position. Head Vents Restored to Proper Position + (10:09:05, 20 December 2024)
- ML20035D378 + (10:09:06, 20 December 2024)
- LIC-93-0101, Forwards Public Version & Central Files Version of Revised Epips,Including Rev 22 to EPIP-OSC-1,Rev 12 to EPIP-OSC-15 & Rev 13 to EPIP-RR-22.Central Files Version Withheld + (10:09:07, 20 December 2024)
- ELV-05378, Special Rept:On 930313,mechanical Governor Response to DG 1B Indicated Higher than Actual Speed of Engine.Caused by DG Trip on Low Oil Pressure.On 930324,noticed Water Spraying from Area Near Exhaust Piping.Caused by Crack in Shroud + (10:09:10, 20 December 2024)
- ML20035D371 + (10:09:14, 20 December 2024)
- ML20035D370 + (10:09:15, 20 December 2024)
- ML20035D367 + (10:09:16, 20 December 2024)
- IR 05000324/1993013 + (10:09:22, 20 December 2024)
- ELV-03614, Application for Amends to Licenses NPF-68 & NPF-81,changing Value of Calculated Peak Containment Pressure Re DBA from 45 Psig to 37 Psig + (10:09:24, 20 December 2024)
- ML20035D361 + (10:09:26, 20 December 2024)
- ML20035D360 + (10:09:27, 20 December 2024)
- ML20035D358 + (10:09:28, 20 December 2024)
- ML20035D357 + (10:09:29, 20 December 2024)
- ML20035D356 + (10:09:30, 20 December 2024)
- ML20035D355 + (10:09:32, 20 December 2024)
- ML20035D353 + (10:09:33, 20 December 2024)
- 05000277/LER-1993-006, :on 930314,personnel May Have Been Unable to Respond to Site in Event of Emergency Due to Severe Snowstorm from 930312-13.Roads Impassable Until 930314. Temporary Sleeping Facilities Provided + (10:09:34, 20 December 2024)
- ML20035D351 + (10:09:36, 20 December 2024)
- ML20035D349 + (10:09:37, 20 December 2024)
- ML20035D347 + (10:09:38, 20 December 2024)
- IR 05000324/1993010 + (10:10:34, 20 December 2024)
- ML20035D345 + (10:10:36, 20 December 2024)
- ML20035D343 + (10:10:37, 20 December 2024)
- ML20035D342 + (10:10:38, 20 December 2024)
- ML20035D341 + (10:10:39, 20 December 2024)
- ML20035D340 + (10:10:40, 20 December 2024)
- ML20035D338 + (10:10:42, 20 December 2024)
- ML20035D336 + (10:10:43, 20 December 2024)
- 05000321/LER-1993-001-04, :on 930316,discovered Loss of Vacuum Resulting in Unplanned Scram & Group 2 Primary Containment Isolation. Caused by Component Failure.Valve 1G11-F019 Will Be Repacked & Actuator Will Be Rebuilt + (10:10:44, 20 December 2024)
- ML20035D331 + (10:10:47, 20 December 2024)
- ML20035D328 + (10:10:48, 20 December 2024)
- ML20035D324 + (10:10:57, 20 December 2024)