ML20035D357

From kanterella
Jump to navigation Jump to search
Submits Licensee Quarterly Status Rept Re Construction Activities at Plant,Per 831014 Memorandum & Order in Proceeding.W/O Encl
ML20035D357
Person / Time
Site: Washington Public Power Supply System
Issue date: 04/01/1993
From: Reynolds N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, WINSTON & STRAWN
To: Bloch P, Bright G, Schink D
Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX
References
CON-#293-13834 OL, NUDOCS 9304130120
Download: ML20035D357 (1)


Text

/383 WINSTON & STILMVN 1

F:EDEAICK H WINSX)N P8:3-18861 1400 L STPEET. N w cs,c,ao o,,,cs AASHiNGTON. DC. 20005-3502 as wrst wacxEn cant 5 LA$ ** $".1 AWN 0991-1946)

) p /Cy@c rtuNOIS 6050i wn

.g 4202) 371 5700 FACSMLE (202) 3715950 u. von...a,oo m u, April 1, 1993 Peter B. Bloch, Esquire David R. Schink Chairman, Atomic Safety and Department of Oceanography Licensing Board Texas A&M University U.S. Nuclear Regulatory College Station, Texas 77843 Commission Washington, D.C.

20555 i

Mr. Glenn O.

Bright Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Subj:

Washington Public Power Supply System (WPPSS Nuclear Project No. 3) Docket No. 50-460-OL Gentlemen:

In accordance with the October 14, 1983, Memorandum and Order in the captioned proceeding, the Washington Public Power Supply System hereby r,ubmits its quarterly status report regarding construction activities at WNP-1.

During the first quarter of 1992, no significant safety-related construction activities were performed at WNP-1, although a limited engineering effort was continuing.

We do not anticipate any change in this level of activity during the next several months.

Sincer y,

k

'l Nicholas Re nolds Counsel.

r Ap licant g

cc:

Service List

{

9304130120 930401 PDR ADOCK 05000460 PDR fp3 0

.