ML20035D338
| ML20035D338 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/06/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9304130090 | |
| Download: ML20035D338 (3) | |
Text
>R REctf UNITED STATES f
y Ig NUCLEAR REGULATORY COMMISSION I
'# I REGION IV
'f 611 RYAN PLAZA DRIVE, SUITE 400 o,
ARLlNGToN, T EXAS 760118064 APR 61993 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licer.see:
Gulf States Utilities Name of Facility:
River Bend Station Docket:
50-458 EA No.:
93-060 Date and Time April 21, 1993 of Meeting:
10 a.m.
Location of Meeting:
NRC Region IV Office Training Conference Room Arlington, Texas Purpose of Meeting:
Enforcement Conference (public meeting) to discuss the adequacy of the interlocks between the containment airlock doors NRC Attendees:
J. Mi'hoan, Regional Administrator J. Moi.:gomery, Deputy Regional Administrator A. Beach, Director, Division of Reactor Projects (DRP)
T. Gwynn, Deputy Director, DRP A. Howell, Deputy Director, Division of Reactor Sat: ty S. Black, Director, Project Directorate IV-2, Office of Nuclear Reactor Regulation (NRR)
J. Gagliardo. Chief, Project Section C, DRP E. Baker, Project Manager, NRR I
W. Smith. Senior Resident Inspector, DRP E. Collins, Project Engineer, Project Section C, DRP D. Loveless, Resident Inspector. DRP Licensee Attendees:
P. D. Graham. Vice President Other members of the licensee's s' aff NOTE:
(1) Attendance by NRC personnel at this meeting should be made known by COB on Apri' 19 via telephone call to J. E. Gagliardo (817) 860-8270.
(2) This meeting is ope 1 to attendance by members of the general public.
/.A I
^
Approved By:,
A. Bill Beach,(Di#ector f Division of ReaTfor Pr ects 9304130090 930406 I
g PDR ADOCK 05000458 jF G
PDR jL
APR 6 1993 Gulf States Utilities 1 i
Distribution:
j DMB (IE 45)
J. H. Sniezek, DEDR (MS 17G21)
I H. L. Thompson, DEDS (MS 17G21)
T. E. Murley, D/NRR (MS 12D1)
W. T. Russell, ADT/NRR (MS 12G18)
J. G. Partlow, ADP/NRR (MS 12D9)
J. Lieberman, D/0E (MS 7H5)
L. J. Chandler, OGC (MS 15B18) i OED0 RIV Coordinator (MS 17G21)
L. R. Plisco, LPEB/NRR (MS 10A19)
G. F. Sanborn, EO 4
C. A. Hackney, RSLO i
J. Gilliland, PAO, RIV l
NRC Attendees RA Secretary l
Ann Mattila l
Division Secretary :DRP, DRS, DRSS)
L. S. Ousley l
RIV File i
i i
i
?
j O
RIV:C:DRP/D PA0h,k RSLO $ f D:6RP JEGagljardo JTG'O T,il and CAHackney ABBeach 4/I/93~
4/h/93 4/./93 h4/(r/93 i
(
a
APR 6 1993 Gulf States Utilities
-2_
Distribution:
- DMB (IE 45)
J. H. Sniezek, DEDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
T. E. Murley, D/NRR 'MS 12D1)
W. T. Russell, ADT/NRP, (MS 12G18)
J. G. Partlow, ADP/NRR (MS 12D9)
J. Lieberman, D/0E (MS 7H5)
L. J. Chandler, 0GC (MS 15B18)
OEDO RIV Coordinator (MS 17G21)
L. R. Plisco, LPEB/NRR (MS 10A19)
G. F. Sanborn, E0 C. A. Hackney, RSLO J. Gilliland, PAO, RIV NRC Attendees RA Secretary Ann Mattila Division Secretary (DRP, DRS, DRSS)
L. S. Ousley i
RIV File i
{
b I
RIV:C:DRP/D PA0b h RSLO5,(
):bRP f
JECagliardo JTGilTiland CAHackney 5ABBeacn 4/ 6,9S 4/2 /93 4/{,/93 4/,s93
- ---