Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039C613 + (04:59:25, 20 December 2024)
- ML20039C611 + (04:59:26, 20 December 2024)
- ML20039C609 + (04:59:27, 20 December 2024)
- ML20039C608 + (04:59:28, 20 December 2024)
- ML20039C607 + (04:59:29, 20 December 2024)
- ML20039C606 + (04:59:30, 20 December 2024)
- ML20039C605 + (04:59:31, 20 December 2024)
- ML20039C604 + (04:59:32, 20 December 2024)
- ML20039C602 + (04:59:33, 20 December 2024)
- IR 05000335/1981033 + (04:59:34, 20 December 2024)
- ML20039C600 + (04:59:35, 20 December 2024)
- ML20039C598 + (04:59:39, 20 December 2024)
- 05000321/LER-1981-132-03, /03L-0:on 811201,discovered Tech Specs Revision Re Mod in G51 Torus Water Cleaning Sys Had Not Been Approved.Cause by Personnel Failure to Notify NRC of Proposed Revision Before Startup + (04:59:40, 20 December 2024)
- ML20039C595 + (04:59:42, 20 December 2024)
- ML20039C593 + (04:59:43, 20 December 2024)
- 05000321/LER-1981-132, Forwards LER 81-132/03L-0 + (04:59:46, 20 December 2024)
- ML20039C587 + (04:59:48, 20 December 2024)
- ML20039C588 + (04:59:48, 20 December 2024)
- 05000275/LER-1981-007-03, /03L-0:on 811125,discovered That Tech Specs Surveillance Requirement 4.11.2.4.1 Re Project Doses Due to Gaseous Releases from Plant Not Performed within Required Time Interval.Caused by Personnel Oversight + (04:59:50, 20 December 2024)
- IR 05000250/1981032 + (04:59:51, 20 December 2024)
- 05000348/LER-1981-071-03, /03L-0:on 811123,fire Barrier Cable Penetration 07-155-31 Declared Inoperable When Determined Penetration Was Not Sealed.Caused by Personnel Failing to Follow Control Procedures + (04:59:53, 20 December 2024)
- ML20039C583 + (04:59:55, 20 December 2024)
- 05000275/LER-1981-007, Forwards LER 81-007/03L-0 + (04:59:56, 20 December 2024)
- ML20039C580 + (04:59:58, 20 December 2024)
- 05000275/LER-1981-008-03, /03L-0:on 811130,discovered That Gross Alpha Activity Analysis Had Not Been Performed within Required Time Interval.Caused by Personnel Oversight.Sample Counted on 811130 + (04:59:59, 20 December 2024)
- 05000348/LER-1981-071, Forwards LER 81-071/03L-0 + (05:00:01, 20 December 2024)
- ML20039C575 + (05:00:03, 20 December 2024)
- ML20039C573 + (05:00:04, 20 December 2024)
- 05000324/LER-1981-125-03, /03L-0:on 811118,4-inch Level Discrepancy Noted Between Wide Range & Narrow Range Instruments of Torus Level Indications.Caused by Drift of Instrument Used for Routine Chamber Water Level Surveillance Only.Instrument Recalib + (05:00:06, 20 December 2024)
- 05000339/LER-1981-088-01, /01T-0:on 811209,reactor Was Taken Critical from Mode 3 to Mode 2 W/Solid State Protection Train B Trip Functions Defeated.Caused by Apparent Auxiliary Contact Failure + (05:00:08, 20 December 2024)
- 05000275/LER-1981-008, Forwards LER 81-008/03L-0 + (05:00:10, 20 December 2024)
- 0CAN128111, Requests 60-day Extension Beyond 811228 for Comment Period on NUREG-0801,re Control Room Design Review + (05:00:11, 20 December 2024)
- 05000324/LER-1981-125, Forwards LER 81-125/03L-0 + (05:00:14, 20 December 2024)
- ML20039C565 + (05:00:15, 20 December 2024)
- 05000339/LER-1981-088, Forwards LER 81-088/01T-0 + (05:00:17, 20 December 2024)
- ML20039C562 + (05:00:18, 20 December 2024)
- IR 05000346/1981018 + (05:00:20, 20 December 2024)
- ML20039C559 + (05:00:23, 20 December 2024)
- ML20039C558 + (05:00:24, 20 December 2024)
- 05000339/LER-1981-086-03, /03L-0:on 811126,axial Flux Difference Deviated from Target During Performance of Moderator Temp Coefficient Test.Caused When Tave Was Reduced by Boration for Measurement of Moderator Coefficient Causing Oscillation + (05:00:25, 20 December 2024)
- ML20039C556 + (05:00:27, 20 December 2024)
- ML20039C555 + (05:00:28, 20 December 2024)
- 05000250/LER-1981-017-03, /03L-0:on 811122,periodic Test of 3A & 4B High Head Safety Injection Pumps Was Not Completed within Required Time Interval.Surveillance Completed on 811129 & 1206 for 3A & 4B Pumps,Respectively + (05:00:29, 20 December 2024)
- IR 05000298/1981014 + (05:00:30, 20 December 2024)
- 05000302/LER-1981-077-03, /03L-0:on 811204,B Emergency Diesel Generator Control Circuit Discovered Grounded During Surveillance Procedure SP-354,rendering Generator Inoperable.Caused by Electrical Conduit Separation,Rubbing Insulation Off Wiring + (05:00:32, 20 December 2024)
- 05000339/LER-1981-086, Forwards LER 81-086/03L-0 + (05:00:34, 20 December 2024)
- ML20039C547 + (05:00:35, 20 December 2024)
- 05000324/LER-1981-131-03, /03L-0:on 811124,primary Containment Atmospheric Monitor Hydrogen analyzer,2-CAC-AT-1263-1,Model 1A3AX Showed Slight Hydrogen Concentration in Drywell.Caused by Cold Solder Joint in Analyzer.Solder Joint Repaired + (05:00:37, 20 December 2024)
- 05000250/LER-1981-017, Forwards LER 81-017/03L-0 + (05:00:38, 20 December 2024)
- GO2-81-052, Final Deficiency Rept Re Quality Class I Soil Backfill, Originally Reported on 811112.Extensive Test Program Using Penetration Tests,Downhole Nuclear Density & Pressuremeter Tests Concluded Item Is Not Reportable + (05:00:39, 20 December 2024)
- 05000302/LER-1981-077, Forwards LER 81-077/03L-0 + (05:00:42, 20 December 2024)