Forwards IE Insp Rept 50-346/81-18 on 811001,02,05-09,13-17, 19-23 & 26-30 & Notice of Violation
ML20039C547
Person / Time
Site: Davis Besse 
Issue date: 12/15/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20039C548 List:
References
NUDOCS 8112290450
Download: ML20039C547 (2)


See also: IR 05000346/1981018

Text

'

,

- .

DEC 1 51981

e-

Docket No. 50-346

o

%

Toledo Edison Company

p

, , , , , .

ATTN:

Mr. Richard P. Crouse

C/

r-

p

Vice President

-

Nuclear

L

OEC2O b3I'~

. Edison Plaza

ri-

300 Madison Avenue

'*'

"

Toledo, OH 43652

\\

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. L. A. Reyes

and W. G. Rogers of this office on October 1, 2, 5-9, 13-17, 19-23, 26-30,

1981, of activities at Davis-Besse Nuclear Power Station, Unit 1, authorized

by NRC Operating License No. NPF-3 and to the discussion of our. findings with

Mr. T. Murray at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the.NRC's Public Document Room. If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Sectiori 2.790(b)(1), any such application must be

.

4

O

e#

p

/

.

8112290450 811215

PDR ADOCK 05000 46

0

.DR

T 0/

E.k

o

_ _ - _ _ _ _ _

.

.

Toledo Edison Company

-2-

DEC 1 5 t981:

accompanied by an affadavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

parated as far as possible into a separate part of the affadavit.

If we do

not hear from you in this regard within the specified periods noted above, a

copy of this letter, the enclosures, and your response to this letter will

be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

20rfgfnal s!gned by R.t.. Spessard"

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

Inspection Report

No. 50-346/81-18

cc w/encls:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Helen W. Evans, State of Ohio

-

-

,

-

>

.

,. ,

,

RIII

-

'

RIII

RII

197 8 e/so

Yj

I

McGregov

S reeter

. k.

Sp

ard

11/23/81

32-As/gg

gt)

, _ . . . . . . . . . . . . . . . .

..

. .

. . . . . . . . . . . . . . . . . . . . . _ . . . . _ .