DEC 1 51981
e-
Docket No. 50-346
o
%
Toledo Edison Company
p
, , , , , .
ATTN:
Mr. Richard P. Crouse
C/
r-
p
Vice President
-
Nuclear
L
OEC2O b3I'~
. Edison Plaza
ri-
300 Madison Avenue
'*'
"
Toledo, OH 43652
\\
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. L. A. Reyes
and W. G. Rogers of this office on October 1, 2, 5-9, 13-17, 19-23, 26-30,
1981, of activities at Davis-Besse Nuclear Power Station, Unit 1, authorized
by NRC Operating License No. NPF-3 and to the discussion of our. findings with
Mr. T. Murray at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the.NRC's Public Document Room. If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Sectiori 2.790(b)(1), any such application must be
.
4
O
e#
p
/
.
8112290450 811215
PDR ADOCK 05000 46
0
.DR
T 0/
E.k
o
_ _ - _ _ _ _ _
.
.
Toledo Edison Company
-2-
DEC 1 5 t981:
accompanied by an affadavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
parated as far as possible into a separate part of the affadavit.
If we do
not hear from you in this regard within the specified periods noted above, a
copy of this letter, the enclosures, and your response to this letter will
be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
20rfgfnal s!gned by R.t.. Spessard"
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
Inspection Report
No. 50-346/81-18
cc w/encls:
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Helen W. Evans, State of Ohio
-
-
,
-
>
.
,. ,
,
RIII
-
'
RIII
RII
197 8 e/so
Yj
I
McGregov
S reeter
. k.
Sp
ard
11/23/81
32-As/gg
gt)
, _ . . . . . . . . . . . . . . . .
..
. .
. . . . . . . . . . . . . . . . . . . . . _ . . . . _ .