__
Appendix A i
NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 4
i As a result of the inspection conducted on October 1, 2, 5-9, 13-17, 19-23, and 26-30, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:
^
Technical Specification 2.2.1 requires that the Reactor Protection System instrumentation setpoints shall be set consistent with the trip setpoint values shown on Table 2.2-1.
Table 2.2-1 and Technical Specification 3.3.1 requires that the trip setpoint for the RC pressure-temperature trip be set at (12.60 T F-5660) psig.for H
operation of the plant in Modes 1 and 2.
Contrary to the above, RPS temperature calibration was conducted under Procedure ST 5030.06 on April 17, 1981, to a nonconse-vative,cceptance criteria (1.63*F) which is in violation of their Limited Safety System l
Setting. Two of the four pressure - temperature trip setpoints were not as per requirement of Technical Specification 2.2.1.
This is a Severity Level IV violation (Supplement 1).
s Pursuant to the provisions of 10 CFR 2.201, you arc required to submit to this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full com-pliance will.be~ achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath.
or affirmation.
Consideration may be given to extending your response time
~
for good cause shown.
i 9EC 1 5 bel Dated R. L. Spessard, Director Division of Resident and Project Inspection i
r e
e v*
?
8112290456 81 5
PDR ADOCK 050 346 G
- - -