Forwards IE Insp Repts 50-266/81-19 & 50-301/81-21 on 811001-30 & Notice of Violation
ML20039C609
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/15/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20039C610 List:
References
NUDOCS 8112290518
Download: ML20039C609 (2)


See also: IR 05000266/1981019

Text

-

,

s

OtC 1 u obl

Docket No. 50-266

n

Docket No. 50-301

' x

,,-

-x

x

pN/

\\

Wisconsin Electric Power Company

s/

\\

ATTN:

Mr. Sol Burstein

2/

~

\\ik

Executive Vice President

{f

g g g n , ,3 1' -

7

Power Plants

40k

231 West Michigan

f

'

Milwaukee, WI 53201

j

4

'

This refers to the routine safety inspection conducted by Messrs.

,

W. G. Guldemond and R. L. Hague of this office on October 1-30, 1981, of

activities at Point Beach Nuclear Plant, Units 1 and 2, authorized by NRC

Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion of our

findings with Mr. G. A. Reed at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the iaspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or affirmation, is required.

Three of the items of noncompliance resulted from a failure to verify

the status of plant systems. These included improper valve lineups during

a main steam and main feedwater hydrostatic test, improper valve lineups

during reactor coolant system pressure isolation valve integrity checks,

and an improper valve lineup of a high head safety injection system during

power operation.

The first two noncompliances occurred because of interrup-

tions in the respective tests and subsequent failures to verify proper

conditions before continuing tests. The third nonc mpliance was the result

of operator inattentiveness.

In your response to ttis matter, please

emphasize those actions taken or planned to preclu<e recurrence of viol-

ations similar to these three.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

8112290518 911215

PDR ADOCK 05000266

O

PDR

g

J f

t//

J

.

Wisconsin Electric Power Company

-2-

DEC 1 5 Web

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affadavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bar.es for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affadavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

'"Offsinal signed by R.L. Spessard"

R. L. Spessard, Director

Division of Resident and

Project Inspection

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report No.

50-266/81-19

cc w/encls

G. A. Reed, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief Boiler

Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission