Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039G324 + (03:54:23, 20 December 2024)
- ML20039G322 + (03:54:24, 20 December 2024)
- ML20039G320 + (03:54:25, 20 December 2024)
- ML20039G316 + (03:54:26, 20 December 2024)
- ML20039G314 + (03:54:27, 20 December 2024)
- ML20039G312 + (03:54:28, 20 December 2024)
- ML20039G311 + (03:54:29, 20 December 2024)
- ML20039G309 + (03:54:30, 20 December 2024)
- ML20039G307 + (03:54:31, 20 December 2024)
- TAC:47464 + (03:54:31, 20 December 2024)
- ML20039G305 + (03:54:32, 20 December 2024)
- ML20039G303 + (03:54:33, 20 December 2024)
- ML20039G299 + (03:54:35, 20 December 2024)
- ML20039G296 + (03:54:36, 20 December 2024)
- ML20039G295 + (03:54:37, 20 December 2024)
- ML20039G292 + (03:54:38, 20 December 2024)
- ML20039G290 + (03:54:39, 20 December 2024)
- ML20039G291 + (03:54:39, 20 December 2024)
- ML20039G289 + (03:54:40, 20 December 2024)
- ML20039G288 + (03:54:41, 20 December 2024)
- ML20039G287 + (03:54:42, 20 December 2024)
- 05000245/LER-1981-040-03, /03L-0:on 811203,while Performing Operability Demonstration,Isolation Valve 1-CU-3 Failed to Close on Signal.Caused by Corrosion to Motor Housing & Bearings Which Produced Open Circuit & Commutator Damage.Motor Replaced + (03:54:43, 20 December 2024)
- ML20039G284 + (03:54:44, 20 December 2024)
- ML20039G285 + (03:54:44, 20 December 2024)
- 05000245/LER-1981-039-03, /03L-0:on 811124,alarm on Control Room Panel 905 Annunciated.Caused by Blown Fuse Due to Burned Out Relay Coil.Relay Replaced & Four Switches on 595-102D Recalibr + (03:54:46, 20 December 2024)
- 05000245/LER-1981-040, Forwards LER 81-040/03L-0.Detailed Event Analysis Encl + (03:54:48, 20 December 2024)
- ML20039G280 + (03:54:49, 20 December 2024)
- 05000245/LER-1981-039, Forwards LER 81-039/03L-0.Detailed Event Analysis Encl + (03:54:50, 20 December 2024)
- A02109, Responds to 811113 Request for Addl Info Re SEP Topic III-6, Seismic Design Considerations.Contractor Authorized to Transmit Info to Lll for Review of Plant Seismic Load Capability.Load Combination Inapproriate as Design Basis + (03:54:53, 20 December 2024)
- ML20039G275 + (03:54:54, 20 December 2024)
- ML20039G272 + (03:54:56, 20 December 2024)
- ML20039G268 + (03:55:01, 20 December 2024)
- ML20039G265 + (03:55:02, 20 December 2024)
- ML20039G264 + (03:55:03, 20 December 2024)
- ML20039G262 + (03:55:04, 20 December 2024)
- 05000304/LER-1981-032-03, /03L-0:on 811219,safety Injection Accumulator Sample Containment Isolation Valve 2A0V-SS9357B Failed to Close.Caused by Sticking Valve Stem.Valve Stem Cleaned & Lubricated & Packing Adjusted + (03:55:05, 20 December 2024)
- W3P81-2085, Forwards Info Necessary to Close Out SER Open Item 9 Re Feedwater Line Break & SER Confirmatory Item 13 Re Reactor Coolant Pump Shaft Seizure Analysis.Info Will Be Included in Next FSAR Amend + (03:55:09, 20 December 2024)
- ML20039G259 + (03:55:12, 20 December 2024)
- ML20039G258 + (03:55:13, 20 December 2024)
- 05000304/LER-1981-032, Forwards LER 81-032/03L-0 + (03:55:14, 20 December 2024)
- ML20039G255 + (03:55:17, 20 December 2024)
- ML20039G254 + (03:55:18, 20 December 2024)
- ML20039G253 + (03:55:18, 20 December 2024)
- ML20039G252 + (03:55:19, 20 December 2024)
- ML20039G251 + (03:55:20, 20 December 2024)
- ML20039G250 + (03:55:20, 20 December 2024)
- ML20039G249 + (03:55:21, 20 December 2024)
- ML20039G248 + (03:55:22, 20 December 2024)
- ML20039G247 + (03:55:23, 20 December 2024)
- 05000219/LER-1981-063-03, /03L-0:on 811119,during Surveillance Testing, Isolation Condenser Valve V-14-30 Failed to Close.Caused by Torque Switch Setting & Packing Gland Tightness.Torque Switch Setting Corrected + (03:55:24, 20 December 2024)
- ML20039G245 + (03:55:25, 20 December 2024)