Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000318/LER-1980-015, Forwards LER 80-015/03L-0 + (08:52:28, 2 January 2025)
- ML19309A817 + (08:52:29, 2 January 2025)
- 05000318/LER-1980-019, Forwards LER 80-019/02L-0 + (08:52:30, 2 January 2025)
- 05000327/LER-1980-004, Forwards LER 80-004/01T-0 + (08:52:32, 2 January 2025)
- ML19309A812 + (08:52:33, 2 January 2025)
- 05000327/LER-1980-006-01, /01T-0:on 800314,w/essential Raw Cooling Water Radiation Monitors on Train a Inoperable,Personnel Determined That Limiting Condition of Operation Requires Sampling.Caused by Misinterpretation of Tech Specs + (08:52:34, 2 January 2025)
- 05000213/LER-1980-006-03, /03L-0:on 800306,during Routine Monthly Fan Damper Test,Broken Linkage Coupling Was Found on CAR2 Fan Bypass Damper,Causing Fan to Be Inoperable.Linkage Coupling Was Replaced W/Steel Coupling of Greater Strength + (08:52:36, 2 January 2025)
- 05000318/LER-1980-016-03, /03L-0:on 800303,emergency Diesel Generator 21 Was Placed Out of Svc After It Failed to Reach Rated Speed During Start Test.Caused by Diesel Generator Governor Slow Response.Governor Replaced,All Governors Inspected + (08:52:38, 2 January 2025)
- ML19309A808 + (08:52:39, 2 January 2025)
- ML19309A807 + (08:52:40, 2 January 2025)
- 05000318/LER-1980-016, Forwards LER 80-016/03L-0 + (08:52:41, 2 January 2025)
- ML19309A803 + (08:52:42, 2 January 2025)
- 05000213/LER-1980-006, Forwards LER 80-006/03L-0 + (08:52:44, 2 January 2025)
- 05000327/LER-1980-006, Forwards LER 80-006/01T-0 + (08:52:46, 2 January 2025)
- ML19309A798 + (08:52:47, 2 January 2025)
- ML19309A797 + (08:52:48, 2 January 2025)
- 05000318/LER-1980-001-03, /03L-0:on 800225,although Low Pressure Safety Injection Pump 21 Was Placed Out of Svc for Maint, Containment Spray Pump 21 Was Disassembled.Caused by Verbal Communication Error + (08:52:50, 2 January 2025)
- ML19309A794 + (08:52:51, 2 January 2025)
- ML19309A795 + (08:52:51, 2 January 2025)
- ML19309A793 + (08:52:52, 2 January 2025)
- ML19309A792 + (08:52:53, 2 January 2025)
- ML19309A791 + (08:52:54, 2 January 2025)
- ML19309A789 + (08:52:55, 2 January 2025)
- 05000318/LER-1980-001, Forwards LER 80-001/03L-0 + (08:52:56, 2 January 2025)
- ML19309A786 + (08:52:57, 2 January 2025)
- ML19309A784 + (08:52:58, 2 January 2025)
- ML19309A783 + (08:52:59, 2 January 2025)
- ML19309A782 + (08:52:59, 2 January 2025)
- ML19309A781 + (08:53:00, 2 January 2025)
- ML19309A780 + (08:53:01, 2 January 2025)
- ML19309A779 + (08:53:02, 2 January 2025)
- ML19309A777 + (08:53:03, 2 January 2025)
- ML19309A778 + (08:53:03, 2 January 2025)
- ML19309A776 + (08:53:04, 2 January 2025)
- PM-80-358, Forwards Annual Environ Surveillance Rept for CY79 + (08:53:05, 2 January 2025)
- ML19309A773 + (08:53:07, 2 January 2025)
- ML19309A772 + (08:53:07, 2 January 2025)
- ML19309A771 + (08:53:09, 2 January 2025)
- ML19309A770 + (08:53:12, 2 January 2025)
- ML19309A768 + (08:53:13, 2 January 2025)
- ML19309A767 + (08:53:16, 2 January 2025)
- TXX-3110, Deficiency Rept:On 800228,QA Insp Revealed Control Board Welded Connections Not Meeting Seismic Design Criteria.Cause Unstated.Control Board Suppliers & Ae Reviewing as-built Weld Configurations.Rework Will Be Completed by 800501 + (08:53:17, 2 January 2025)
- ML19309A766 + (08:53:17, 2 January 2025)
- TXX-3114, Forwards Rept of Actions Taken to Correct Deficiencies in Mfg of Discs for Svc Water Control Valves.Supporting Documentation Is Available at Site for Inspector Review + (08:53:19, 2 January 2025)
- ML19309A762 + (08:53:21, 2 January 2025)
- ML19309A760 + (08:53:22, 2 January 2025)
- ML19309A759 + (08:53:23, 2 January 2025)
- ML19309A758 + (08:53:24, 2 January 2025)
- ML19309A757 + (08:53:25, 2 January 2025)
- ML19309A756 + (08:53:26, 2 January 2025)
- ML19309A755 + (08:53:27, 2 January 2025)
- ML19309A754 + (08:53:28, 2 January 2025)