ML19309A784
| ML19309A784 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 03/21/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19309A785 | List: |
| References | |
| NUDOCS 8004010340 | |
| Download: ML19309A784 (1) | |
Text
____.. ___
PP W shington Public Power Supply System A JOINT OPERATING AGENCY l
q P. o. som 988 3000 GEo WasMINGTON WAY RfCMLAND. W ASHINGToM 9 9 3 5 2 PMons (509) 375 5000 March 21, 1980 Docket Nos. STN 50-508 STN 50-509 Mr. Harold R. Opnton, Director Office of Nuclear Reactor Regulation U.S. NUCLEAR REGULATORY COMMISSION Washington, D.C. 20555
Subject:
WPPSS NUCLEAR PROJECTS N0S. 3 AND 5 NPDES PERMIT MODIFICATIONS
Dear Mr. Denton:
Construction Permit Condition 16 requires that the discharges comply with the conditions contained in the National Pollutant Discharge Elimination System Permit issued for the facility, as presently approved or as later modified. That condition additionally requires that the Supply System analyze any proposed modification of the discharge pentiit, and if such changes would warrant any modification of the Construction Permit or pre-sent an unreviewed safety question or involve any adverse environmental impacts significantly greater than analyzed in the FES, the permittees should file appropriate documents with the U.S. Nuclear Regulatory Comission.
In our judgement, the modification to the NPDES Permit, attached, does not involve any adverse environmental impact significantly greater than that analyzed in the FES.
It does not involve any safety issues, and does not require any modification to the Construction Permit.
Very truly yours, b
D. L. RENBERGER Assistant Director, Technology DLR:KRW:slw coo *b Attachment 65
///