Text

,

o l

T,,

1

'1 I OUISIANA 3 2 OuAnONOe Srncer Enemmed P O W E R & L 1 G H T[ P O. BOX 6000 . NEW OALEANS. tOUIStANA

. (504) 36& 2345 70174 tu?Rksensin  !

March 28,1980 '

O L ASWELL ven prenntent Pow.c Productum j

LPL 13398 Q-3-A35.07.11 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Of fice of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit 3 Docket No. 50-382 Final Report of Significant Deficiency No. 11 Switchgear Breaker Position Switch Operator Defect i

j

REFERENCE:

LP&L Letter LPL 11136 to NRC dated May 10, 1979

Dear Mr. Seyfrit:

In accordance with the requirements of 10 CFR 50.55(e), we are hereby providing two copies of the Final Report of Significant Deficiency No. II, "Switchgear Breaker Position Switch Operator Defect".

All corrective action work for this significant deficiency is now complete and reinspection has been accomplished. If we can be of further assistance in this matter, please advise.

Yours very truly, Ome!

D. L. Aswell DLA:TFG:ned Attachment l

l cc: 1) Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (with 15 copies of report)

, 2) Director Of fice of Management Information and Program Control \%

U. S. Nuclear Regulatory Commission  ;) \