Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000295/LER-1980-013, Forwards LER 80-013/03L-0 + (08:00:50, 2 January 2025)
- ML19309E570 + (08:00:51, 2 January 2025)
- 05000366/LER-1980-037-03, /03L-0:on 800328,while in Cold Shutdown & Performing Reactor Water Chemistry,Noted Chloride Concentration Was 0.116 Ppm.Cause Attributed to Reactor Water Cleanup Sys Out for 26-days.Cleanup Sys Fixed + (08:00:52, 2 January 2025)
- 05000346/LER-1980-008, Forwards Revised LER 80-008/03L-1 + (08:00:54, 2 January 2025)
- ML19309E566 + (08:00:58, 2 January 2025)
- 05000338/LER-1980-037-01, /01T-0:on 800403,at Full Power Operation,Eccs Was Initiated Due to Full Closure of Main Steam Trip Valve During part-stroke Exercising of Valve.Caused by Test Being Performed at Full Steam Flow + (08:00:59, 2 January 2025)
- 05000366/LER-1980-037, Forwards LER 80-037/03L-0 + (08:01:01, 2 January 2025)
- 05000338/LER-1980-037, Forwards LER 80-037/01T-0 + (08:01:03, 2 January 2025)
- ML19309E560 + (08:01:05, 2 January 2025)
- 05000366/LER-1980-033-03, /03L-0:on 800331,while in Cold Shutdown,Triaxial Peak Recording Accelerometers on Reactor Pedestal & Feedwater Inlet Line Were Not Calibr within Time Limit. Caused by Instrument Failure During Calibr + (08:01:06, 2 January 2025)
- 05000293/LER-1980-012-03, /03L-0:on 800312,while Performing Surveillance Test,Found That Pressure Switch 263-52A Setpoint Had Drifted.Cause Not Stated.Setpoint Drift Is Recurring Problem.Pressure Switch Recalibr + (08:01:08, 2 January 2025)
- ML19309E556 + (08:01:09, 2 January 2025)
- 05000010/LER-1980-002, Forwards LER 80-002/01T-0 + (08:01:10, 2 January 2025)
- PMNS20191230, Continued Discussions of Proposals for Building Smarter Fuel Cycle Inspection and Licensing Programs + (08:01:11, 2 January 2025)
- 05000366/LER-1980-033, Forwards LER 80-033/03L-0 + (08:01:14, 2 January 2025)
- 05000293/LER-1980-012, Forwards LER 80-012/03L-0 + (08:01:16, 2 January 2025)
- 05000265/LER-1980-007-03, /03L-0:on 800316,while Ultrasonically Inspecting Jet Pump Fixture Beam Assemblies One Through 20,width-wise Crack Indication Discovered Along Upper Surface of Pump 16 Near Bolt.Caused by Intergranular Stress Corrosion + (08:01:17, 2 January 2025)
- 05000317/LER-1980-015-03, /03L-0:on 800317,steam Generator Auxiliary Feed Pump 11 Was Taken Out of Operation.Caused by Sightglass Being Broken by Operator Taking Oil Sample for Analysis. Broken Glass Replaced + (08:01:19, 2 January 2025)
- ML19309E547 + (08:01:20, 2 January 2025)
- 05000366/LER-1980-039-03, /03L-0:on 800325,while Performing Standby Gas Treatment Ventilation Surveillance,No Flow Established at 2T46-D0016 Filter Train.Caused by Failure of 2746-C001B Fan Motor Wiring.Motor Repaired + (08:01:22, 2 January 2025)
- 05000317/LER-1980-015, Forwards LER 80-015/03L-0 + (08:01:24, 2 January 2025)
- 05000265/LER-1980-007, Forwards LER 80-007/03L-0 + (08:01:26, 2 January 2025)
- ML19309E539 + (08:01:27, 2 January 2025)
- 05000325/LER-1980-022-03, /03L-0:on 800318,during Normal Operation, Containment Atmosphere monitor,CAC-AR-1263,was Erratic. Caused by Deteriorated Inlet Hose Plugging Inlet Valve.Hose Replaced.Other Monitors Will Be Inspected + (08:01:28, 2 January 2025)
- ML19309E535 + (08:01:29, 2 January 2025)
- 05000325/LER-1980-022, Forwards LER 80-022/03L-0 + (08:01:31, 2 January 2025)
- 05000335/LER-2019-002, Reactor Coolant Pump Motor Ground Results in Reactor Coolant Pump Trip and Subsequent Automatic Reactor Trip + (08:01:36, 2 January 2025)
- 05000295/LER-1980-012-03, /03L-0:on 800312,during Normal Power w/1B Diesel Generator in Standby,Dc Control Breaker Tripped.Caused by Use of 5-amp Slow Blow Fuses in Annunciator Inverter.Slow Blow Fuses Replaced W/Fast Blowing Fuses + (08:01:38, 2 January 2025)
- ML19309E530 + (08:01:39, 2 January 2025)
- 05000295/LER-1980-012, Forwards LER 80-012/03L-0 + (08:01:41, 2 January 2025)
- ML19309E527 + (08:01:42, 2 January 2025)
- ML19309E525 + (08:01:43, 2 January 2025)
- ML19309E524 + (08:01:44, 2 January 2025)
- PMNS20191228, Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force + (08:01:45, 2 January 2025)
- ML19309E522 + (08:01:45, 2 January 2025)
- ML19309E519 + (08:01:46, 2 January 2025)
- ML19309E518 + (08:01:47, 2 January 2025)
- ML19309E517 + (08:01:48, 2 January 2025)
- ML19309E515 + (08:01:49, 2 January 2025)
- ML19309E514 + (08:01:50, 2 January 2025)
- ML19309E513 + (08:01:50, 2 January 2025)
- ML19309E512 + (08:01:51, 2 January 2025)
- 05000325/LER-1980-027-03, /03L-0:on 800319,during Normal Plant Operation, Standby Gas Treatment Sys 1B Would Not Reset.Caused by Tripped Control Power Circuit Breaker.Breaker Was Reset, Closed & Standby Gas Treatment Sys Was Successfully Run + (08:01:53, 2 January 2025)
- ML19309E507 + (08:01:54, 2 January 2025)
- ML19309E510 + (08:01:54, 2 January 2025)
- 05000325/LER-1980-027, Forwards LER 80-027/03L-0 + (08:01:55, 2 January 2025)
- ML19309E504 + (08:01:56, 2 January 2025)
- ML19309E503 + (08:01:57, 2 January 2025)
- ML19309E502 + (08:01:59, 2 January 2025)
- ML19309E501 + (08:02:00, 2 January 2025)
- ML19309E499 + (08:02:00, 2 January 2025)