ML19309E512

From kanterella
Jump to navigation Jump to search
Responds to NRC 800228 Request for Info Re Mgt & Technical Resources
ML19309E512
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/11/1980
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Crocker L
Office of Nuclear Reactor Regulation
References
NUDOCS 8004220549
Download: ML19309E512 (9)


Text

.

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 3699 PHILADELPHIA. PA.19101 (21538414000 April 11, 1980 Mr. Lawrence P. Crocker Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, DC 20555

Dear Mr. Crocker:

Enclosed is the infor=ation requested by Mr.

Denton in his letter of February 28, 1980, regarding managenent and technical resources for the Peach Bottom Atomic Power Station.

Should you have any questions relative to this response, please contact Mr. William Birely of mystaffat(215)8h1-50h8.

Very truly yours, l'

M. J ocney

/

Supcraintendent GerEationDivision/ Nuclear

'h Enclosure

\\

\\p'L cc: Je=es Powers 9

a Teknekren Research, Inc.

hk.

1h83 Chain 3 ridge Road y

McClean, 7A 22101 t

APRIL, 1980 PHILADELPHIA ELECTRIC COMPANY TABLE 1 Indicate whether your onsite short-term management meets cach qualification listed below.

(Short-term is defined as from time of accident until one hour following it.)

Plant All OH-SITE SHORT TERM MANAGEMENT Manager Shi ft Supervisors (Note 2) e B.S. in Engineering YES NO 2 yrs of operating experience YES (19 Years)

YES e

at a nuclear power plant e

1 yr experience at the specific YES (10 Years)

YES plant e

An NRC Senior Operator's NOTE 1 YES License e

4 yrs supervisory experience YES (19 Years)

YES Note 1:

Formerly held Senior Operator's License. Assistant Superintendent and other members of the staff are SLO.

NOTE 2: The information provided is for the senior Shif t Supe rvisors at Peach Bottom.

These personr.el have the title of Shift Superintendent.

I

TABl.E 2 5 tate whether your current plant staff includes at least cne individual with the qualifications listed for each posit.icn or area of expertise.

00sitior/ Area of Excertise Yes/Nn i

Reactor Engineer

- 5.5. in Engineering or Science YES

- Minimum of 5 years total experience YES i

j

- Minimum 1 year nuclear operations (including 5 YES months ensite)

- Six men:ns reac:Or transien; analys1s NOTE 3

- Simula:Or training YES Tnermal Hycraulics Scecialis:

- 5.5. in Engineering or Science YES

- Minimum of 5 years total excerience YES j

- Minimum 1 year nuclear Ocerations (including YES j

6 T.cn ns ensite)

- Six mon:ns of nydraulics transient analysis NO (NOTE 4)

- Simulator training YEs Instrumentation anc Control Engineer

- 3.5. in Engineering or Science YES

- Minimum of 5 years :::si excerience YES

- Minimum 1 year nuclear ocerations (inclucing YES 5 men:ns ensite)

- Si :uia e :rsinin Cnemistry anc r.aciccnemistry YES

- 3.I. in Engineering or Science YES

- Minimum of i years :::al experience YES

- Minimum cf 1 year nuclear c: era:icns (inciucing i men:ns ensite)

YES

- 5imuic Or training YES Note 3:

One semester graduate studies on transient analysis Note 4: Most of t he thirty five graduate engineers on the plant staff have taken college course in thermodynamics and hydraulics, i

Many of the nea f f ennineers, including all the STAS have received formal

t. raining in ther odynamics and thermal hydraulics as applied l

eo a WR p.uer riant.

TABLE 2 li.ontinued)

11-
r /An.i of I mertise Yes/tto 24cla uan 3ro:c lon 3:ectails:

- Assocla a cegree or equivalen:

YES Minimum f 3 years

21 experience YES

- Minimum of 1 year nuclear opera:icns YES

- Simulater training YES Meenanical Engineering

- 3.5. in Engineering YES

- Minimum of 5 years :::al excerience YES

- 1 year in operations YES 6 months in nydraulic transient cesign NO Simulator training YES Overail Plant Design anc Engineering

- 5.5. in Science er Engineerin9 YES

- Minimum of 10 years total experienca YES 5 years of operations YES 3imula:Or rainin:

YES

lan or Uni: Manager s.2.

in -ngineering or science YES Minimum of 10 years :::al ex:erience YES Minimum cf 3 years in a '<ey cosition in nuclear YES ocera 'ng plant Minimum of a years su:ervi: 1rg ex:erience YES Cualify f:r,nOlc, P neic 50 :P 3E0 YES Ocers lon: Manager 5.2. in Engineering cr 3cienca YES Minimum Of 3 years ::ai ex:erien:2 YES Minimum of 2 years nuclear ::erating :'.an-YES Two yeces in a :ucervising role hole in 5R0 license YES

'e nnical Manager i.3. in Engineering er 5cien:e YES Minimum of 3 years :::21 ex:erience YES l

- Minimum f 3 years ny:I aa- :e#atin; :ian-YES t

Iwo year in a supervisory role YES 1

TABLE 3

' tatx whether your present of fsite staff includes at least one individual with the listed qualifications for each position or area of expertise below.

Pos1-icn/ Area nf Expertise Yes/No Engineering Suppor Manager

- E.5. in Science or Engineering YES

- Minimum of 10 years total exoerience YES

- Minimum of 5 years nuclear power excerience YES Transient Analyses

- 3.3. in Science or Engineering YES

- Minimum of 10 years etal experienCg YES

- Minimum of 5 years nuclear ocwer ex;:erience YES

- Simulat:r : raining NO

.1uclear.:uel Charac:aris::cs enc Manacemen:

I

- 3.5. in Science or Engineering YES

- Mimir.ium of 10 years

ai excer enca YES l

- Minimum of 5 year: nuciaar cwer ex erienca YES i

TABLE 3 (Cone.inued)

. c
.-.:n/ Area of Expertise Yes/flo Fire Protection

- 1 year s:ecific training in Fire Science YES

- Minimum of 5 years c:al excertence yEs

- Minimum of 2 years nuclear power experience YEs Engineering Mecnanics of Power Plan Systems anc C =conent,

- 5.3. in Mec.1anical Engineering YES

- Minimum of 6 years total experience YES

- Minimum of 3 years nuclear power excerience YES

- 5 years in cesign YES Flan-Strue:ure anc Containment Cesign

- 3.5. in Mecnanical or Civil Engineering YES or ecuivalen:

- Minimum of 5 years to ai ex:erience YEs

- Minimum of a years nuclear power excerience YEs

~ nem;; ry anc.aciocnemis ry

- 1.1. in Chemistry or Ecuivalent YES i year 40;;caemis ry YES

- cr.imu:

f 5 jear:

al er. erienta TES

- m mu:n :f ;. ear; nuclear :cwer e.cerien:a m

adia:icn Cen r i anc Heal n Chy:ic:

- 2.2.

n

en:2 :r Engineerir.; Or E:uivaient

?ES

' year ::ec::ii:ec : rain:ng YES

- *inimum O f - yea rs

21 er.::er' en 3

733

- Minimum Of 3 ye3r nuclear ::we 2.ceri3r.03 Ygs ppm 9 9 y}

o u u d ${ g'da n

. o w.

lr

e TABLE 3 (Continued)

Position / Area of Expertise Yes/No Reactor Physics Design and Control Theory

- 5.5. in Engineering or Science YES

- Minimum of 10 years total experience YES

- Minimum of 5 years nuclear power experience

- 3 years in design __.,

YES Electrical Power Systems

- 5.5. in Electrical Engineering YES

- Minimum of 5 years c:al experience YES

- Minimum of 3 years nuclear power experience YES 5 years in casign YES 5 years in c era: ion YES Pr: cess Cc= uters

- 3.5. in Com uter Science YES

- Minimum of 5 years otal experlence YES

- :4inimum of 3 years nuclear pcwer experience YES

nssrumenta icn 2nc Con:rei 5 s ams

/

- 3.2. In Electrica! Engineering YES

- :linimum of 5 years

al ex;erience YES

- Minimum of a years nuclear pcwer ex:erience YES 2 years in cesign YES i

l l

l

TABLE 3 (Cr>ntinued) 00s1 1cn Yes/ilo Radioactive Waste ilanagement

- 3.5. in Chemical Engineering or Ecuivalen; us

- 1 year sceciali:ed training NOTE 7 14inimum of 5 years total experience YES

- Minimum of a year; nuclear poner ekperience YES NOTE 7:

Several individuals have the equivalent of 1 year specialized training.

, nu.

00 YOUR ADVAllCED PLAfitilf(G, 'REPARATI0tl. Att0 PROCEDURES IftCLUDE THE F0ll0WIfiG AREAS Re:ui red Areas for Snecial Pnceaures Yes/t!o ORGAtiIZATIOri Exists ano can be promotly activated e

YES e Has cirec ac: ass to succor services YES Organ 1 a:icnal roles nefinea and aoproved e

YES C0t4MuttICATI0t:5 Voi:e link ce ween ensite/offsite resource e

(Dedicated line)

YES e

a:a sinx ce ween ensi a/offsi e resour:ss NO e

Recuncan: ::=unica:icn cacacili-ies YES Mooile ::r=unica icns availability e

YES cer=unica-ion general accessioility e

YES C =unica:icn networx :esting YES SUPPORT SERVCIES Designa:ec work areas for resources e

YES (Review grous esoecially) e Back u: resources (onsite personnel, ccmunica-tiens)

YES RE3CURCE LTILI.AT!0ti PROCICURE3 3 ocecures assuring avaiiacili y e

rescur:as no Pmcecures assuring assignmen of mscur:es e

YES ACCICEt;T JIAGriC3:3 Att0 MITIGATICri Organi:2:icn Of accident 091 tean (off,i te) e 3eie::icn,

raining, astinc, cuties NOTE 6 e

hto 6:

orannizntIon and functions of the D & M team will be incorporated into the revised Emergency Plan and implementing procedures.

O -