ML19309E527
| ML19309E527 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 04/10/1980 |
| From: | Linder F DAIRYLAND POWER COOPERATIVE |
| To: | |
| References | |
| LAC-6856, NUDOCS 8004220584 | |
| Download: ML19309E527 (2) | |
Text
43,4; c. -
0 DA/RYLAND h
[k COOPERAT/VE. po eOx si7 2615 EAST AV SOUTH LA CROSSF WISCONSIN 54601
'608) 788 4 000 April 10, 1980 In reply, please refer to TAC-6856 DOCKET NO. 50-409 Mr. James G.
Keppler Regional Director U.
S.
Nuclear Regulatory Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 REPORTABLE OCCURRENCE NO. 80-01
Reference:
(1)
LACBWR Technical Specifications, Section 3.9.2.a.(3).
(2)
LACBWR Technical Specifications, Section 5. 2.1. 2. (b) 4.
Dear Mr. Keppler:
In accordance with Reference 1, this is to inform you of abnormal degradation discovered in the primary reactor containment during periodic Type B and C surveillance leakage rate testing while in a shutdown condition.
As a result of conducting periodic Type B leak tests on electrical renetrations, the leak flow rates determined from electrical pene-tration unit Nos.
3, 4 and 5 exceeded the permissible leak flow rates as defined in Technical Specifications (Reference 2).
The test leakage rates were determined to be 0.589 SCFH on Unit No.
3, 12.377 SCFH on Unit No.
4, and 0.589 SCFH on Unit No.
5.
The Acceptance Criteria is 0.375 SCFH.*
The tests were performed on April 9, 1980.
Prompt notification of test results to Mr. Ken Baker of the U.
S. Nuclear Regulatory Ccmmission, Region III, was accomplished at 1100 on April 10, 1980, by L.
S. Goodman, LACBWR Operations Engineer.
/QCO3 s
/!O
- Shall not exceed 1% of leakage rate L where L is 37.5 SCFH.
po po
! 1:3
- 0h4Eto 56Q l
y Mr. James G.
Keppler, Reg. Dir.
LAC-6856 U. S. Nuclear Regulatory Commission April 10, 1980-1 Repairs to the electrical penetrations are being accomplished and retests will be performed.
If there are any questions concerning this report, please contact us, i
Very truly yours, DAIRYLAND POWER COOPERATIVE
/
Frank Linder, General Manager FL:LSG:af cc:
Director, Office of Management Information and (3)
Program Control U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 l
,