Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1980-049-03, /03L-0:on 800516,during Routine Surveillance, Position 08 for Rod 14-15 Did Not Indicate.Probably Caused by Ground in Prototypic Inlet Piping.Problem Under Investigation + (05:46:28, 2 January 2025)
- 05000325/LER-1980-049, Forwards LER 80-049/03L-0 + (05:46:31, 2 January 2025)
- 05000293/LER-1980-017-03, /03L-0:on 800505,during 24-h Performance Test of a Diesel Generator Per IE Bulletin 79-23,three Attempts Made Before Satisfactory Conclusion on 800510.Caused by Failure of Potential Transformer in High Voltage Chassis + (05:46:33, 2 January 2025)
- 05000293/LER-1980-017, Forwards LER 80-017/03L-0 + (05:46:35, 2 January 2025)
- ML19312E671 + (05:46:36, 2 January 2025)
- ML19312E669 + (05:46:37, 2 January 2025)
- IR 05000245/1979021 + (05:46:39, 2 January 2025)
- ML19312E665 + (05:46:40, 2 January 2025)
- IR 05000483/1980001 + (05:46:42, 2 January 2025)
- ML19312E661 + (05:46:43, 2 January 2025)
- ML19312E660 + (05:46:44, 2 January 2025)
- ML19312E659 + (05:46:44, 2 January 2025)
- ML19312E657 + (05:46:45, 2 January 2025)
- IR 05000333/1978014 + (05:46:46, 2 January 2025)
- ML19312E654 + (05:46:48, 2 January 2025)
- ML19312E655 + (05:46:48, 2 January 2025)
- ML19312E651 + (05:46:49, 2 January 2025)
- ML19312E652 + (05:46:49, 2 January 2025)
- ML19312E650 + (05:46:50, 2 January 2025)
- PNO-V-80-035, licensee Irradiated U Sample in Reactor as Part of Class Experiment.Sample Was Returned Via Pneumatic Sample Transfer Sys to Receiving Station within Ventilation Hood.Sample Holder Had Cracked.No Exposures Involved + (05:46:52, 2 January 2025)
- ML19312E647 + (05:46:53, 2 January 2025)
- ML19312E648 + (05:46:53, 2 January 2025)
- ML19312E646 + (05:46:54, 2 January 2025)
- ML19312E645 + (05:46:55, 2 January 2025)
- ML19312E644 + (05:46:55, 2 January 2025)
- ML19312E643 + (05:46:56, 2 January 2025)
- ML19312E642 + (05:46:57, 2 January 2025)
- ML19312E641 + (05:46:58, 2 January 2025)
- ML19312E639 + (05:46:59, 2 January 2025)
- ML19312E637 + (05:47:00, 2 January 2025)
- IR 05000364/1980006 + (05:47:01, 2 January 2025)
- ML19312E634 + (05:47:02, 2 January 2025)
- ML19312E632 + (05:47:03, 2 January 2025)
- ML19312E631 + (05:47:04, 2 January 2025)
- ML19312E630 + (05:47:05, 2 January 2025)
- IR 05000553/1980006 + (05:47:07, 2 January 2025)
- PNO-II-80-092, on 800520,release from Pipe Flange to Work Area of Less than 1 Kg U Hexafluoride Occurred.Ten Workers Evacuated from Area.No Detectable Personnel Exposures Resulted + (05:47:09, 2 January 2025)
- ML19312E626 + (05:47:10, 2 January 2025)
- PNO-I-80-081A, on 800520,manual Reactor Trip Was Initiated Because of High Turbine Bearing Temp Resulting from Loss of Both Svc Water Sys.Licensee Procedures Have Been Modified to Require Addl Checking + (05:47:12, 2 January 2025)
- IR 05000361/1980007 + (05:47:13, 2 January 2025)
- PNO-II-80-089, on 800516,during Exam of Installed Fuel Holddown Springs W/Television Camera,One Cracked Spring on Fuel Assembly Identified.Assemblies W/Cracked Fuel Assembly Holddown Springs Will Be Replaced + (05:47:15, 2 January 2025)
- ML19312E620 + (05:47:16, 2 January 2025)
- PNO-I-80-078, on 800515,NRC Was Notified That Chem-Nuclear Tractor Trailer Hauling Low Specific Activity Radwaste Broke Down.Tractor Engine Determined Irreparable.No Loss of Contents or Radiological Problems Identified + (05:47:18, 2 January 2025)
- PNO-IV-80-021C, on 800515,following Purge of Reactor Bldg, Fans Were Left on to Continue Ventilation.Epa Officials Indicated That No Radiation Levels Were Detected Offsite. Util Samples Indicated That 4 Out of 8 Had Traces of Xe-133 + (05:47:19, 2 January 2025)
- ML19312E615 + (05:47:20, 2 January 2025)
- ML19312E613 + (05:47:21, 2 January 2025)
- ML19312E614 + (05:47:21, 2 January 2025)
- ML19312E611 + (05:47:22, 2 January 2025)
- PNO-III-80-094, on 800515,licensee Reported That Cracks Had Been Found in a & C Sections of Low Pressure Turbine.Section a Will Be Replaced W/New Spindle + (05:47:23, 2 January 2025)
- 05000321/LER-1980-043-03, /03L-0:on 800503,while at Steady State Power, Torus Air & Water Temp Recorder Was Discovered to Be Stamping Erratic & Upscale.Caused by Faulty Balancing Motor in Recorder.Balancing Motor Replaced + (05:47:26, 2 January 2025)
- 05000366/LER-1980-055-03, /03L-0:on 800506,while Performing Reactor Core Isolation Cooling Steam Line Pressure Instrument Functional Test,Outboard Steam Supply Line Isolation valve,2E51-F608, Failed to Operate.Caused by Failed Operator Torque Switch + (05:47:28, 2 January 2025)