ML19312E655
| ML19312E655 | |
| Person / Time | |
|---|---|
| Issue date: | 05/06/1980 |
| From: | Plesset M Advisory Committee on Reactor Safeguards |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| ACRS-R-0876, ACRS-R-876, NUDOCS 8006050495 | |
| Download: ML19312E655 (2) | |
Text
1 i
I f
' F R O *A:
ACTION CONTROL DATES CONTROL NO l
- ,( d$ ; F}6$$g(
CCMPL CEADLINE
PREPARJ FOR SIGNATURE OF.
g g g g,4 j gj g g FINAL REPLY C CHAIRMAN FILE LOCATION O EXECUTIVE DIRECTOR I.
OTHER:
i OESCPIPTION O LETTER CMEMO O REPORT O OTHER SPECI AL INSTRUCTIONS OR REMARKS 44 4TIG2 R dE C61C45 - concors it.
.ie ; Lata 1.144. Rev.1 4 recaueMs Original letter to Public Doctment Room t
i as Li.r : s : of :,4cific tantification May 12,1980.
.sua r.amrs :o promei fu:; Guides prier Hugh Voress notified of abose on 5-12-80/
i.
to hadssion ta 4.S for review CLASSIFIED DATA r%ction Completed on May 12,19F4 00CUMENT/ COPY NO.
CLASSIFICATION l W. M. Morrison
'4VMB E R OF PAGES CATEGORY TI POST AL REGIST R Y NO.
O Nsi @D O FRD ASSIGNED TO.
DATE y
INFORMATION ROUTING LEG AL REVIEW i2 FINAL O COPY
_t,_,m-
,/ 71.9
- j pg f*
ASSIGNED 70; OATE NO LEG AL Cd)ECTIONS I
$OGd!I NOT 6 F Y:
O ECO ADVIN k CCR RE5 ists
- l
" ' ' \\,
L,,
g COMM E NTS. NOTIF Y; p'gl,,g EXT.
s a
' I/
/
\\! - l Camral filos JCAE NOTIFIChTION PECOMMENDED.
U YES O No
(
\\
EXECUTIVE DIRECTOR FOR OPERATIONS 00 NOT REMOVE TH/S COPY PRINCIPAL CORRESPONDENCE CONTROL THIS DOCUMENT CONTAINS POOR QUAUTY PAGES t
l 1
l 8006050lTS i
- hpnea, u
- [
- UNITED STATES 4
NUCLEAR REGULATORY COMMISSION g y,,q g
- c-
.c ADVISORY COMMITTEE ON REACTOR SAFEGUARDS
~
o,, si WASHINGTON. D. C. 20S55
,/
g
.s May 6, 1980 Mr. William J. Dircks Acting Executive Director for Operations U.S. Nuclear Regulatory Comm;ssion Washington, DC 20555
SUBJECT:
ACR$ \\CTION ON REGULATORY GUIDES
Dear Mr. Dircks:
Ouring its 241st meating, May 1-3, 1980, the ACRS concurred in the regulatory position of Regulatory Guide 1.144, Revision 1, " Auditing of Quality Assurance Programs for Nuclear Power Plants".
During this meeting, the Committee also discussed the appropriateness of the NRC Staff's procedure for assigning specific identification numbers to proposed Regulatory Guides.
During the April 9,1980 and April 30, 1980 Regulatory Activities Sul,:ommittee meetings, the NRC Staff indicated that a specific identification number will not be assigned to a proposed Regulatory Cuide until juet prior to its issuance for industry use.
The ACRS objects to this proce-aure, since it believes that this method of assigning numbers to proposed Regulatory Guides will make it exceedingly difficult to maintain complete and adequate records of the history and development of Regulatory Guides. The ACRS recommends strongly that the NRC Staff assign specific identification numbers to proposed Regulatory Guides prior to submitting them to the ACRS for review.
Sincerely, Milton S. Plesset Chai rman cc:
H. Denton, NRR R. Minogue, OSD G. Arlotto, OSD
- 5. J. Chilk, SECY i
aedd Cif. 5;2
%:2.
...:..me.
"?--
4 e
,