/ "%,o,,
/
UNITED STATES
j' '
,"% (
~
g
NUCLEAR REGULATORY COMMISSION
,
t
,a
REGION 111
Q
[
799 ROOSEVELT ROAD
%...../
GLEN ELLYN, ILLINOIS 60137
APR 2 31980
.
.
.
'.
Docket No. 50-483
Union Electric Company
ATTN:
Mr. John K. Bryan
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the inspection conducted by Mr. H. M. Wescott and other
members of the NRC staff during the period January 7-9, 1980, at the
SNUPPS Organization Office, Gaithersburg, Maryland, of activities
authorized by NRC Construction Permit No. CPPR-139 for Callaway, Unit
No. 1, and to the discussion of our findings with Mr. N. A. Petrick
and other members of the SNUPPS staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within thirty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in an enclosure to the
application.
S00605 M Oh Q
_
- - - -
e
'
Union Electric Company
-2-
APR 2 3 560
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
D
V
- G.
iorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
'
Report No. $0-483/80-01
cc w/ enc 1:
Mr. W. H. Weber, Manager
Nuclear Construction
Central Files
Reproduction Unit NRC 20b
Local PDR
Region I & IV
Ms. K. Drey
Mr. Ronald Fluegge, Utility
Division, Missouri Public
Service Commission