Forwards IE Insp Rept 50-483/80-01 on 800107-09.No Noncompliance Noted
ML19312E661
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/23/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19312E662 List:
References
NUDOCS 8006050506
Download: ML19312E661 (2)


See also: IR 05000483/1980001

Text

.'

/ "%,o,,

TIC

/

UNITED STATES

j' '

,"% (

~

g

NUCLEAR REGULATORY COMMISSION

,

t

,a

REGION 111

Q

[

799 ROOSEVELT ROAD

%...../

GLEN ELLYN, ILLINOIS 60137

APR 2 31980

.

.

.

'.

Docket No. 50-483

Union Electric Company

ATTN:

Mr. John K. Bryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Mr. H. M. Wescott and other

members of the NRC staff during the period January 7-9, 1980, at the

SNUPPS Organization Office, Gaithersburg, Maryland, of activities

authorized by NRC Construction Permit No. CPPR-139 for Callaway, Unit

No. 1, and to the discussion of our findings with Mr. N. A. Petrick

and other members of the SNUPPS staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within thirty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

S00605 M Oh Q

_

- - - -

e

'

Union Electric Company

-2-

APR 2 3 560

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

D

V

  • G.

iorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

'

Report No. $0-483/80-01

cc w/ enc 1:

Mr. W. H. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Region I & IV

Ms. K. Drey

Mr. Ronald Fluegge, Utility

Division, Missouri Public

Service Commission