Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19318C417 + (01:27:00, 2 January 2025)
- 05000348/LER-1980-036-03, /03L-0:on 800528,during Performance of RHR Valves Inservice test,1A RHR Heat Exchanger Discharge Valve Failed to Stroke Close.Caused by Cap Screw Connecting Valve Actuator to Valve Shaft Coming Out.Cap Screw Replaced + (01:27:01, 2 January 2025)
- 05000348/LER-1980-036, Forwards LER 80-036/03L-0 + (01:27:06, 2 January 2025)
- 05000368/LER-1980-031-04, /04L-0:on 800527,during Mode 1 Operation,Condenser Gas Sample Monitor 2RITS-0645 Was Found Inoperable.Radiation Levels Were Normal Per Tech Specs.Caused by Bearing Failure on Sample Motor.Engineering Evaluation Underway + (01:27:07, 2 January 2025)
- 05000368/LER-1980-025-03, During Mode 1 Operation, Valve 2CV-5657 Was Isolated to Facilitate Maint Work & Alarm Indicated Valve Open When Valve Was Closed.Caused by Backed Out Screw Leaving Switch Misaligned.Switch Realigned + (01:27:09, 2 January 2025)
- 05000346/LER-1980-043-03, /03L-0:on 800528,while Testing Safety Features Actuation Sys,Valve DH-11 Closed & Dh Pump 1-1 Was Stopped. Caused by Procedural Inadequacy.Responsible Personnel Were Made Aware of Problem + (01:27:11, 2 January 2025)
- 05000368/LER-1980-025, Forwards Updated LER 80-025/03X-1 + (01:27:15, 2 January 2025)
- 05000346/LER-1980-043, Forwards LER 80-043/03L-0 + (01:27:22, 2 January 2025)
- ML19318C396 + (01:27:23, 2 January 2025)
- ML19318C394 + (01:27:24, 2 January 2025)
- ML19318C391 + (01:27:25, 2 January 2025)
- ML19318C392 + (01:27:25, 2 January 2025)
- ML19318C390 + (01:27:26, 2 January 2025)
- ML19318C389 + (01:27:27, 2 January 2025)
- 05000266/LER-1980-007-01, /01T-0:on 800611,blue Instrument Bus 1Y02 Was de-energized,resulting in de-energization of 3 Containment Pressure Channels.Caused by Personnel Error.Power Restored & Instrumentation Returned to Normal + (01:27:28, 2 January 2025)
- 05000327/LER-1980-076-03, /03L-0:on 800526,during Normal Operation,Output Circuit Breaker on Vital Inverter 2-I Tripped,Causing 120 Volt Ac Vital Instrument Power Board 2-I to Become Inoperable.Caused by Thermostat Being Out of Calibr + (01:27:30, 2 January 2025)
- ML19318C386 + (01:27:31, 2 January 2025)
- 05000327/LER-1980-076, Forwards LER 80-076/03L-0 + (01:27:32, 2 January 2025)
- ML19318C383 + (01:27:33, 2 January 2025)
- 05000339/LER-1980-028-99, /99T-0:on 800624,during Beginning of Core Life, Hot Zero Moderator Temp Coefficient Found More Positive than Required.Caused by Positive Moderator Temp Coefficient Discovered During Startup Physics Testing + (01:27:35, 2 January 2025)
- 05000368/LER-1980-034-03, /03L-0:on 800531,during Mode 1 Operation,Leak Developed on Charging Pump B Suction Pipe at Coupling for Capped Test Connection Line.Caused by Vibration.Defective Pipe Spool Piece Will Be Replaced + (01:27:36, 2 January 2025)
- ML19318C380 + (01:27:37, 2 January 2025)
- 05000348/LER-1980-037-01, /01T-0:on 800613,Westinghouse Notified Util of Potential for Damage to Centrifugal Charging Pumps Due to Inadequate Flow Following Secondary Side High Energy Line Rupture.Caused by Inadequate Consideration During Design + (01:27:39, 2 January 2025)
- ML19318C378 + (01:27:40, 2 January 2025)
- 05000266/LER-1980-007, Forwards LER 80-007/01T-0 + (01:27:41, 2 January 2025)
- 05000368/LER-1980-034, Forwards LER 80-034/03L-0 + (01:27:43, 2 January 2025)
- 05000348/LER-1980-037, Forwards LER 80-037/01T-0 + (01:27:44, 2 January 2025)
- ML19318C370 + (01:27:52, 2 January 2025)
- ML19318C369 + (01:27:52, 2 January 2025)
- 05000334/LER-1980-042-03, /03L-0:on 800619,contractor Notified Util That River Water Lines Grouted W/Four Inch Space Between Adjacent Bldg Walls.Lines Could Be Severed During Seismic Event.Grouting Will Be Replaced W/Suitable Fire Seal + (01:27:54, 2 January 2025)
- ML19318C367 + (01:27:56, 2 January 2025)
- 05000339/LER-1980-028, Forwards LER 80-028/99T-0 + (01:27:57, 2 January 2025)
- ML19318C364 + (01:27:58, 2 January 2025)
- ML19318C362 + (01:27:59, 2 January 2025)
- ML19318C359 + (01:28:00, 2 January 2025)
- ML19318C356 + (01:28:02, 2 January 2025)
- ML19318C354 + (01:28:03, 2 January 2025)
- ML19318C353 + (01:28:04, 2 January 2025)
- 05000327/LER-1980-073-03, /03L-0:on 800520,during Support & Hanger Insp, Discrepancies Discovered Between as-built & as-analyzed Configurations That Could Cause Failure in Piping During Seismic Event.Deviations Will Be Modified as Required + (01:28:05, 2 January 2025)
- ML19318C351 + (01:28:06, 2 January 2025)
- 05000327/LER-1980-073, Forwards LER 80-073/03L-0 + (01:28:07, 2 January 2025)
- ML19318C348 + (01:28:08, 2 January 2025)
- ML19318C347 + (01:28:09, 2 January 2025)
- ML19318C346 + (01:28:10, 2 January 2025)
- ML19318C344 + (01:28:10, 2 January 2025)
- 05000339/LER-1980-021-03, /03L-0:on 800504,during Mode 3 Operation,Leaking Valve on Radiation Monitor RMS-259 Resulted in Low Flow to Monitor.Caused by Routine Failure of Valve Bonnet.New Valve Bonnet Installed + (01:28:11, 2 January 2025)
- ML19318C342 + (01:28:14, 2 January 2025)
- ML19318C341 + (01:28:14, 2 January 2025)
- ML19318C338 + (01:28:15, 2 January 2025)
- ML19318C334 + (01:28:15, 2 January 2025)
- AECM-80-139, Forwards Emergency & Radiological Response Plans for State of Ms,Port Gibson/Claiborne County,Ms, & State of La,In Support of Util Revised Emergency Plan Submitted on 800627 as Part of Amend 40 to FSAR + (01:28:16, 2 January 2025)