Forwards Rept on Wall Penetration Fire Stops & Fire Test Criteria for Penetration Seals in Concrete Floors & Walls
ML19318C338
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/19/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19318C339 List:
References
1-060-16, 1-60-16, NUDOCS 8007010369
Download: ML19318C338 (1)


Text

_

wm

'~. Titis 0000MEitT COMTWS

-P00R qu wTY W j

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501)371-4000 June 19, 1980 1-060-16 Director of Nuclear Reactor Regulation ATTN:

Mr. R. W. Reid, Chief Operating Reactors Branch #4 U. S. Nuclear Regulatory Commission i-shington, D. C.

20555

Subject:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Fire Protection (File:

1510, 2040)

Gentlemen:

As conmitted in our letter of June 15, 1978, attached, in enclosure A, are the test results of the metal lath and pl. aster wall test as pro-posed to the NRC in our letter of March 9, 1979.

As outlined on page 2 of this report, the subject fire stops demonstrated compliance with the requirements for a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> rating in accordance with the acceptance criteria specified in IEEE 634.

Also attached, in enclosure B, is the proposed fire test criteria for four (4)_ Unit 1 electrical penetration seals.

These four (4) seals are to be tested as a result of our resealing effort on Unit 1, which was carried out earlier this year, in which all non-3 hour approved Unit 1 electrical penetration seals were replaced with approved 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> seals. All but the subject four (4) seals to be tested were installed in accordance with ANO-2 approved designs.

Therefore, only these four (4) seals will need to be tested.

We request your review of the proposed fire test criteria in enclosure B be completed at the earliest possible date, as we would like to select the lab for this test by July 11, 1980.

Very truly yours.

m

, c David C. Trimble

/

Manager, Licensing DCT:DEJ:skm Enclosures 80070103 L