ML19318C346
| ML19318C346 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/03/1980 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-79-14, NUDOCS 8007010378 | |
| Download: ML19318C346 (1) | |
Text
- _
YQ PHILAD ELPHIA ELECTRIC COM PANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101
$HIELDS L. DALTROFF rLacta cen som June 3, 1980 Re:
Docket Nos. 50-277 50-278 lE-Bulletin 79-14 Mr. Boyce H.
Crier, Director Office of Inspection & Enforcement Region I US Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Reference:
Letter from B.
H.
Grier to S.
L.
Daltro<'.
dated October 24, 1979
Dear Mr. Grier:
The referenced letter itemizes certain actions to be completed by Philadelphia Electric Company (PECO).
Item B.4 concernsBulletin 79-14 which pertains to seismic analyses for as-built. safety-related piping systems and states that PECO is to " submit a final report within 30 days of completion of the Unit 2 effort or by June 15, 1980, whichever occurs first."
Bechtel Power Corporation is performing the engineering review and analyses for the as-built safety-related piping at Peach Bottom Units 2 and 3.
Unit 3 is in operation and a final report of the review will be submitted by June 15, 1980.
Due to the large scope of the project, the Unit 2 review will not be completed by June 15, 1980.
Unit 2 is currently in a refueling outage that is scheduled for completion by the end of July.
A final report for Unit 2 will be submitted prior to the unit startup.
If you have any questions or require any additional information, do not hesitate to contact us.
Very truly yours,
/
.%l,( $ffn s
f ec: United States Nuclear Regulatory Commission Office.of Inspection and Enforcement l
Division of Reactor Operations Inspection l~
Washington,.DC 20555 60070103yy