ML19318C392
| ML19318C392 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 06/25/1980 |
| From: | Utley E CAROLINA POWER & LIGHT CO. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19318C393 | List: |
| References | |
| NO-80-961, NUDOCS 8007010425 | |
| Download: ML19318C392 (1) | |
Text
L-cpat Carolina Power & Light Company June 25, 1980 FILE: NG-3514(B)
SERIAL NO: NO-80-961 Office of Nuclear Reactor Regulation ATTENTION:
Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 3 United States Nucicar Reguhtory Commission Washington, D. C.
20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 IN-SERVICE INSPECTION - PUMP AND VALVE TESTING PROGRAM
Dear Mr. Ippolito:
On May 27, 1980, Carolina Power & Light Company (CP&L) submitted a revised In-Service Inspection (ISI) Program for pump and valve testing at Brunswick Steam Electric Plant, Unit Nos.1 and 2.
CP&L has found two clerical errors in that submittal which should be corrected. First, the sheet following page II-34 is not numbered; remove this sheet and replace it with the attached page II-36.
Secondly, page II-35 was inadvertently omitted from the May 27, 1980 submittal; the attached page II-35 should be inserted into the ISI Program behind page II-34.
We apologize for any inconvenience this has caused. Please call if you have any questions.
Yours very truly, I
E. E. Utley Executive Vice President Power Supply and Engineering & Construction JAM /tl Attachments T
s 411 Fayetteville Street
- P. O. Box 1551 e Raleigh, N. C. 27602 it m -rf m -m m mmeg g m m g rr n,,= e a
.80orozo4G
_