Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20238C529 + (10:49:39, 2 December 2024)
- ML20238C527 + (10:49:40, 2 December 2024)
- ML20238C526 + (10:49:40, 2 December 2024)
- JPN-87-047, Forwards Application for Amend to License DPR-59,extending Expiration Date of OL from 100520 to 141017.Fee Paid + (10:49:41, 2 December 2024)
- ML20238C520 + (10:49:42, 2 December 2024)
- ML20238C521 + (10:49:42, 2 December 2024)
- TXX-6697, Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-445/87-06 & 50-446/87-05.Corrective Actions:Exposed Cable Reels Immediately Recovered & Walkdown of Cable Yard Performed to Ensure That Cables Protected + (10:49:43, 2 December 2024)
- ML20238C516 + (10:49:44, 2 December 2024)
- ML20238C509 + (10:49:44, 2 December 2024)
- ML20238C507 + (10:49:45, 2 December 2024)
- ML20238C504 + (10:49:46, 2 December 2024)
- ML20238C506 + (10:49:46, 2 December 2024)
- ML20238C502 + (10:49:47, 2 December 2024)
- ML20238C503 + (10:49:47, 2 December 2024)
- ML20238C501 + (10:49:48, 2 December 2024)
- TXX-6713, Final Supplemental Deficiency Rept CP-85-40 Re Adequacy of Flux Mapping Seal (Fms) Table Restraints Under Seismic Loads.Initially Reported on 851126.Unit 1 Fms Mods Complete. Unit 2 Mods Scheduled for Completion by 880515 + (10:49:48, 2 December 2024)
- ML20238C498 + (10:49:49, 2 December 2024)
- ML20238C496 + (10:49:50, 2 December 2024)
- ML20238C495 + (10:49:51, 2 December 2024)
- ML20238C494 + (10:49:51, 2 December 2024)
- 05000322/LER-1987-033, :on 871130,discovered Weekly Liquid Effluent Samples Required by Tech Specs Discarded Prior to Monthly & Quarterly Analysis.Caused by Personnel Error.Technician Received Written Reprimand + (10:49:53, 2 December 2024)
- ML20238C489 + (10:49:54, 2 December 2024)
- ML20238C487 + (10:49:56, 2 December 2024)
- ML20238C486 + (10:49:57, 2 December 2024)
- 05000259/LER-1987-018-01, :on 870807,spurious Opening of Reactor Protection Sys Circuit Protector Occurred.Cause Not Revealed by Investigation.Further Corrective Action Not Planned.W/ + (10:49:58, 2 December 2024)
- NLS8700672, Requests NRC Consideration & Concurrence W/Revised Schedule by 880129,to Allow Finalization of Feb 1988 Outage,In Order to Implement Major Panel Mods & Enhancements Per Suppl 1 to NUREG-0737 Re Crdr + (10:50:00, 2 December 2024)
- 05000352/LER-1987-063, :on 871116,Tech Specs Violation Occurred When Unapproved Blocking Permit Mistakenly Applied.Caused by Personnel Error.Personnel Counseled on Administrative Procedures & Memo to Shift Personnel Issued + (10:50:02, 2 December 2024)
- 05000341/LER-1987-025, :on 870625,reactor Protection Sys Actuated & Several ESFs Challenged.Caused by Pressure Spike Sensed by Reactor Vessel Water Level Transmitters on Common Ref Leg. Multi-turn Needle Valves Will Be Installed + (10:50:04, 2 December 2024)
- IR 05000461/1987038 + (10:50:05, 2 December 2024)
- ML20238C478 + (10:50:05, 2 December 2024)
- ML20238C472 + (10:50:10, 2 December 2024)
- 05000498/LER-1987-014, :on 871113,control Room Ventilation Actuation to Recirculation Mode Occurred.Caused by Toxic Gas Monitor Detection of Paint Fumes Containing Gases.Painting Suspended & Painting Control Procedure Will Be Revised + (10:50:12, 2 December 2024)
- ML20238C467 + (10:50:13, 2 December 2024)
- ML20238C469 + (10:50:13, 2 December 2024)
- ML20238C466 + (10:50:14, 2 December 2024)
- IR 05000155/1987028 + (10:50:17, 2 December 2024)
- 0CAN088708, Requests 30-day Extension for Response to Insp Repts 50-313/87-12 & 50-368/87-12 Due to Rept Distribution Problems,Per 870826 Telcon.Repts Not Received Until 870731 + (10:50:18, 2 December 2024)
- TAC:61670 + (10:50:18, 2 December 2024)
- ML20238C461 + (10:50:20, 2 December 2024)
- TXX-6711, Supplemental Final Deficiency Rept CP-80-09 Re Component Supports of Diesel Generator Auxiliary Piping Sys.Initially Reported on 810729.All Rework of Train Diesel Generator Pipe Supports for Both Units Completed + (10:50:21, 2 December 2024)
- PNO-I-87-119, on 871223,reactor Scrammed Due to Leak from Intermediate Waterbox Manway C.Caused by Failure of Manway Gasket.Waterbox C Isolated & Spill Terminated.Water in Condenser Bay Area Measured 43 Inches + (10:50:21, 2 December 2024)
- ML20238C453 + (10:50:22, 2 December 2024)
- ML20238C454 + (10:50:22, 2 December 2024)
- ML20238C448 + (10:50:23, 2 December 2024)
- ML20238C447 + (10:50:23, 2 December 2024)
- 2CAN088703, Monthly Operating Rept for Jul 1987 + (10:50:24, 2 December 2024)
- ML20238C445 + (10:50:25, 2 December 2024)
- IR 05000387/1987020 + (10:50:26, 2 December 2024)
- 1CAN088705, Monthly Operating Rept for Jul 1987 + (10:50:26, 2 December 2024)
- ML20238C442 + (10:50:27, 2 December 2024)
- ML20238C438 + (10:50:28, 2 December 2024)