ML20238C529

From kanterella
Jump to navigation Jump to search
Forwards SALP Repts 50-266/87-01 & 50-301/87-01 for Apr 1986 - Sept 1987.Mgt Attention Required in Listed Areas to Assure Performance Improvement.Overall Performance Acceptable
ML20238C529
Person / Time
Site: Point Beach  
Issue date: 12/23/1987
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20238C532 List:
References
NUDOCS 8712310066
Download: ML20238C529 (2)


See also: IR 05000266/1987001

Text

- - - -_- --

h

s

2 .

UNITED STATES

[go asc

),

oq

I

NUCLEAR REGULATORY COMMISSION

'g-

&

1

l S

REGION lil

%-

'"l

7se moosEVELT mo Ao

GLEN ELLYN ILUNOt$ $01 H

  • g

DEC 2 31987

.

.....

l

l

l

lf

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

i

Vice President

}!

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee,'WI 53201

Gentlemen:

Enclosedforyourrev(ew,priortoourscheduledmeetingofJanuary8,1988,

is the SALP 6 Board Report for Point Beach covering the period April 1, 1986

through September 30, 1987.

In accordance with NRC policy, I have reviewed the SALP Board Assessment-

,

and concur with their ratings.

It is my view that your conduct of nuclear

I

activities in connection with the Point Beach facility was acceptable, but

j

that further management attention is required to assure that actions to

improve performance continue to be effectively implemented. Specific areas

I would like to highlight for your attention are:

1.

The functional area of Fire Protection improved in performance.

Fire

l

Protection, which had received a Category 2 rating in the last SALP,

_l

was rated Category 1 in this assessment period.

Your performance

improved as a result of increased management involvement and

willingness and assertiveness to address NRC concerns, and excellent

.'

engineering evaluations of fire protection issues.-

2.

Performance in the areas of Operations' declined from a Category 1

rating during the previous SALP, to a Category 2 rating during this

SALP. The decline in performance in the Operations area was largely

4

due to weaknesses in procedures and their implementation that resulted in

3

i

an increase in and significance of violations.

Overall, we found your performance acceptable and directed toward the safe

operation of the facility.

While you will have sufficient opportunity to present your comments at the

meeting on January 8, 1988, we also request any written comments within

30 days after the meeting. Upon receipt, your comments will be evaluated

1

and our conclusions relative to them will be provided to you.

j

i

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

i

Report will be placed in the NRC's Public Document Room.

({[

8712310066 871223

{DR

ADOCK 05000266

DCD

/

I

i,

.I q h

'

_ _ - _ _ _ _ _ _

-

.

$

=,

,

.

.

'

t

DEC 2 31987

j

Wisconsin Electric Power Company

2

Should you have any questions concerning the SALP Report, we would be pleased

to discuss them with you.

,

Sincerely,

l

,)

A. Bert Davis

1

4S Regional Administrator

1

I

Enclosure:

SALP 6 Board Reports /

No. 50-266/87001; 50-301/87001

cc w/ enclosure:

.

G.J.'J,..Zach, Plant Manager

.

DCD/DCB'.(RIDS)n

Licensing Fee Management Branch

Resident Inspector, RIII

Virgil Kanable, Chief

Boiler Section

Charles Thompson, Chairman

Wisconsin Public Service

Commission

R. I. Braund (SLO),

WI Div. of Emergency Government

Lawrence J. McDonnell, Chief

Radiation Protection Section

j

WI Department of Health and

.,

t

Social Services, Division

of Health

T. E. Murley, Director, NRR

Regional Administrators

RI, RII, RIV, RV

L. W. Zech, Chairman

'

K. C. Rogers, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

K. M. Carr, Commissioner

D. Wagner, NRR Project Manager

D. R. Muller, NRR Director, Project Directorate III-2

J. Lieberman, Director, Office of

Enforcement

'

D. E. Hickman, SALP Coordinator, NRR

RIII PRR

RIII SGA

State Liaison Officer, State

of Wisconsin

,

INP0

DRP, DRS and'DRSS Division Directors,

Branch Chiefs and Section Chiefs

L. McGregor, Project Inspector, RIII

!

--_ -__--_ - - _ _