ML20238C504

From kanterella
Jump to navigation Jump to search
Informs That Clean Facilities Bldg Addition Const Site Will Be Temporarily Removed from Protected Area.Schedules Identify Approx 9-month Const Phase Beginning in mid-Sept 1987.Encl Details Re Temporary Fencing Withheld
ML20238C504
Person / Time
Site: Salem, Hope Creek, 05000000
Issue date: 09/03/1987
From: Corbin McNeil
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLR-N87167, NUDOCS 8709100161
Download: ML20238C504 (2)


Text

-_-_-.-- - ___- - --_---

SAFEGUARDS INFORMATION f'

A Public Service.

Electric and Gas Company t

Cctbin A. McNein, Jr.

Public Service Electric and Gas Company P.O. Box 236. Hancocks Bridge, NJ 08038 609 339-4800 tu

. Senior Vice President -

s s

 ?

Nuclear SEP - 3 1987 NLR-N8 */1;.1 United States Nuclear Regulatory Commission Document. Control Desk Washington, DC 20555

)

Gentlemen TEMPORARY MODIFICATION OF PROTECTED AREA SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311, 50-354 In accordance with discussions held at Artificial Island on May 18, 1987, with NRC Inspectors R. Bailey and T. Madden and with Mr.

R.

Keimig and others of your staff at King of Prussia on July.

23, 1987, Public Service Electric and Gas Company (PSE&G) will temporarily remove from the Protected Area the Salem Clean Facilities Building Addition construction site.

Schedules identify approximately a nine month construction phase buginning in mid-September 1987.

Additional construction and building modification lasting another thirteen months will take place within the reinstalled original Protected-Area.

Details of the temporary fencing and compensatory security measures are indicated on Attachments 1 and 2.

1 WHEN SEPARATED ' FRdM ENCLOSURES HANDLE THIS DOCUMENT AS DECONTROLLED I

i SAFEGUARDS INFORMATION

/

0, g,d

/g 4

I 8709100161 870903 PDR-ADOCK 05000272 p.

PDR,

M SAFEGUARDS INFORMATION 4"

Document Control Desk 2

PSE&G appreciates your cooperation and assistance in this project.

I assure you that this project will be implemented with the highest regard for maintaining the security integrity of the Artificial Island Protected Area.

Sincerely, OUIN EILL, e k.

c.

J

/

4Lfp~l Attachments C

W.

T.

Russell, Administrator Region I Mr.

D.

C.

Fischer Licensing Project Manager Mr.

T.

J.

Kenny Senior Resident Inspector Mr.

G.

W.

Rivenbark USNRC Licensing Project Manager i

Mr.

R. W. Borchardt USNRC Senior Resident Inspector l

l Mr.

D.M.

Scott, Chief (cover letter only) l Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 1

4 l

l i

1

}

0 1

I i

l

(

(

e l

w i

m f

I N

C 4 l

iU C'

4 a

en b a

I l

w v>

k N

T 09 l

I i

1 1

i i

l l

l l

l i

f l

l

,./

l I

l i

l l

l l

l i

I 1

l i

1 i

f N