Forwards Change 1 to Rev 3 to Physical Security Plan,Per Util 871120 Commitment.Rev Withheld (Ref 10CFR2.790(A))
ML20238C442
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/23/1987
From: Mroczka E, Werner R
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
AO6850, NUDOCS 8712310015
Download: ML20238C442 (2)


Text

._.

.. - 6 SAFEGUARDS INFORMATiON IN ATTACHMENT UPON SEPARATION THIS LETTER IS DECONTROLLED NORTHEAST UTHJTIES n.-- - u... -, m,,,, ne,nn con m u u l

sE.7EN rs$iNco==

P.o. BOX 270

.n e.m..o"" *"

HARTFORD, CONNECTICUT 06141-0270 J ZZ((,",",

(203) 665-5000 k

L December 23, 1987 Docket Nos. 50-245 50-336 50-423 A06850 Re: 10CFR73.55

[

U.S.

Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Gentlemen:

Millstone Nuclear Power Station, Unit Nos.

1, 2,

and 3 Miscellaneous Amendments / Search Requirements Physical Security Plan, Revision 3, Change 1 l

In a letter dated Decembe r 2,

1986,II Northeast Nuclear Energy l

Company (NNECO) submitted Revision 3 to the Millstone Nuclear l

Power Station Physical Securitg) Plan to the NRC Staff.

In a letter dated October 1,

1987, the NRC Staff acknowledged receipt of that proposed amendment and requested additional information to expedite review of this amendment.

NNECO responded with tg) requested information in a letter dated November 20, 1987 In Reference (3), NNECO committed to submit a proposed revision to the Physical Security Plan by December 31, 1987 that would address a-number ~of the items in Reference (2).

The purpose of this letter is to fulfill that commitment.

The attachment to this letter contains the proposed changes to the plan and an explanation for each one.

The NNECO Site Operations Review Committee has evaluated this revision pursuant to 10CFR50.54(p) and has determined that it does not decrease the effectiveness of the Physical Security Plan.

Pursuant to 10CFR73.21(b),

the Physical Security Plan is considered safeguards information, and as such NNECO requests (1) E.

J.

Mroczka letter to H.

R.

Denton, " Physical Security Plan, Revision 3,"

dated December 2, 1986.

(2) M.

L.

Boyle/D.

H.

Jaffe letter to E.

J.

Mroczka, "Miscella-neous Amendments / Search Requirements," dated October 1, 1987.

(3)

E.

J.

Mroczka letter to U.S.

Nuclear Regulatory Commission,

" Miscellaneous Amendments / Search Requirements,"

dated SAFEGUARDS INFORMATICU IN ATTACHMENT N

November 20, 1987.

8712310015 071223 UPON SEPARATION THIS LEiIER IS DECONT50LLED f Il PDR ADOCK 05000245 p

PDR j

i

i SAFEGUARDS INFORMATION IN ATTACHMENT UPON SEPARATION THIS LETTER IS DECONTROLLED l

U.S.

Nuclear Regulatory Commission A06850/Page 2 December 23, 1987 I

l that these proposed changes be withheld from public disclosure pursuant to 10CPR2.790(a).

1 We trust you will find this information satisfactory.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY M t.,

os E.

J.

Mgpczka O

Senior Vice President S

~~

By:

R.

P. Werner Vice President Attachment cc: W.

T.

Russell, Region I Administrator M.

L.

Boyle, NRC Project Manager, Millstone Unit No. 1 D.

H.

Jaffe, NRC Project Manager, Millstone Unit No. 2 R.

L.

Ferguson, NRC Project Manager, Millstone Unit No. 3 W.

J.

Raymond, Senior Resident Inspector, Millstone Unit l

Nos.

1, 2,

and 3 i

i i

i SAFEGUARDS INFORMATION IN ATTACHMENT UP0ii SEPARATl0N THIS LETTER iS DECONTROLL l

l