Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245G444 + (07:22:01, 2 December 2024)
- ML20245G441 + (07:22:02, 2 December 2024)
- 05000352/LER-1989-037, :on 890525 & 26,two Nuclear Steam Supply Shutoff Sys Group VI a & B Isolations & Initiations of Standby Gas Treatment Sys Fan & ESF Occurred.Cause Undetermined.Isolation Reset.Relay Replaced + (07:22:04, 2 December 2024)
- ML20245G437 + (07:22:05, 2 December 2024)
- ML20245G436 + (07:22:06, 2 December 2024)
- ML20245G434 + (07:22:08, 2 December 2024)
- ML20245G431 + (07:22:08, 2 December 2024)
- ML20245G428 + (07:22:09, 2 December 2024)
- ML20245G430 + (07:22:09, 2 December 2024)
- ML20245G426 + (07:22:10, 2 December 2024)
- ML20245G422 + (07:22:11, 2 December 2024)
- 05000304/LER-1988-015-09, :on 881219,operator Noticed That Auxiliary Feedwater Pump Headers Not Split,As Required by Tech Specs Due to Inoperable Pump.Caused by Deficiency in Plant Heatup Procedure.Procedure Revised + (07:22:12, 2 December 2024)
- ML20245G420 + (07:22:13, 2 December 2024)
- ML20245G418 + (07:22:14, 2 December 2024)
- ML20245G416 + (07:22:14, 2 December 2024)
- ML20245G413 + (07:22:15, 2 December 2024)
- ML20245G411 + (07:22:15, 2 December 2024)
- ML20245G410 + (07:22:16, 2 December 2024)
- ML20245G409 + (07:22:17, 2 December 2024)
- ML20245G404 + (07:22:18, 2 December 2024)
- ML20245G401 + (07:22:19, 2 December 2024)
- ML20245G403 + (07:22:19, 2 December 2024)
- ML20245G399 + (07:22:20, 2 December 2024)
- 05000455/LER-1989-005-09, :on 890523,feedwater Isolation Occurred from Reactor Trip P-4 Signal Generated While Racking in Reactor Trip Breaker.Cause of Event Could Not Be Identified.Caution Placed on Reactor Trip Breaker Cubicle + (07:22:22, 2 December 2024)
- 05000265/LER-1988-022-05, :on 880531 & 0601,loss of Chimney Monitors Occurred When Power Supply Deenergized for Maint.Caused by Procedure Inadequacies Since Ref Documents Did Not Clearly Identified Affected Equipment + (07:22:24, 2 December 2024)
- ML20245G395 + (07:22:25, 2 December 2024)
- ML20245G392 + (07:22:26, 2 December 2024)
- ML20245G393 + (07:22:26, 2 December 2024)
- ML20245G391 + (07:22:27, 2 December 2024)
- ML20245G388 + (07:22:28, 2 December 2024)
- BECO-89-084, Forwards Addl Info Re 880804 Response to Generic Ltr 88-01 Concerning NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping,Per NRC 890331 Request + (07:22:28, 2 December 2024)
- ML20245G387 + (07:22:29, 2 December 2024)
- ML20245G384 + (07:22:30, 2 December 2024)
- ML20245G380 + (07:22:30, 2 December 2024)
- ML20245G375 + (07:22:31, 2 December 2024)
- ML20245G372 + (07:22:32, 2 December 2024)
- 05000254/LER-1988-011-11, :on 880625,deviation Meter on RCIC Flow Controller Found to Be Indicating Full Pump Flow While Sys Was Off.Caused by Poor Electrical Contact in Controller Plug Connection.Connector Cleaned + (07:22:35, 2 December 2024)
- ML20245G359 + (07:22:36, 2 December 2024)
- ML20245G358 + (07:22:36, 2 December 2024)
- ML20245G355 + (07:22:38, 2 December 2024)
- 05000219/LER-1989-015, :on 890518,reactor Automatically Shut Down Due to Trip of Main Turbine Generator.Caused by Personnel Error. Administrative Controls Implemented & Operators Briefed on Need to Use All Available Indications + (07:22:39, 2 December 2024)
- ML20245G348 + (07:22:41, 2 December 2024)
- ML20245G341 + (07:22:42, 2 December 2024)
- 05000456/LER-1987-057, :on 871009,as Throttle Valve 2 Being Cycled, MW Output Became Erratic Resulting in Reactor Trip.Root Cause Indeterminate.Temporary Instrumentation Installed on Sensing Line of Turbine Impulse Transmitter + (07:22:44, 2 December 2024)
- ML20245G332 + (07:22:45, 2 December 2024)
- ML20245G333 + (07:22:45, 2 December 2024)
- ML20245G326 + (07:22:47, 2 December 2024)
- ML20245G325 + (07:22:49, 2 December 2024)
- 05000295/LER-1989-010-03, :on 890711,unmarked Jumper Simulated Open Signal on Turbine Stop Valve,Causing Train a Reactor Trip. Caused by Not Properly Removing test-related Jumper After Testing.Testing Procedures Revised + (07:22:50, 2 December 2024)
- IR 05000413/1989007 + (07:22:54, 2 December 2024)
- 05000412/LER-1988-018, :on 881123,evaluation of Binding Problems W/ Telemecanique Gould MCC A821 & A822 NEMA Linestarters Determined That Failure Could Cause Loss of Safety Function. Changeout Assembly Kit Provided + (07:22:56, 2 December 2024)
- ML20245G320 + (07:22:57, 2 December 2024)