Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247A269 + (02:48:20, 2 December 2024)
- ML20247A272 + (02:48:20, 2 December 2024)
- ML20247A267 + (02:48:21, 2 December 2024)
- ML20247A261 + (02:48:22, 2 December 2024)
- ML20247A260 + (02:48:22, 2 December 2024)
- ML20247A257 + (02:48:23, 2 December 2024)
- ML20247A258 + (02:48:23, 2 December 2024)
- 0CAN088914, Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Release Rept from Arkansas Nuclear One + (02:48:24, 2 December 2024)
- ML20247A255 + (02:48:25, 2 December 2024)
- IR 05000338/1989018 + (02:48:26, 2 December 2024)
- ML20247A253 + (02:48:26, 2 December 2024)
- ML20247A250 + (02:48:27, 2 December 2024)
- 05000354/LER-1989-009-03, :on 890419,overvoltage Condition Affecting Class 1E Channel C Battery Charger Resulted in Loss of ECCS Instrumentation When Inverter Tripped.Caused by Personnel Error.Personnel Counselled + (02:48:29, 2 December 2024)
- ML20247A246 + (02:48:30, 2 December 2024)
- ML20247A244 + (02:48:31, 2 December 2024)
- 05000482/LER-1997-018, :on 971001,multiple Failures of B Rhrp to Start Were Noted.Caused by Breaker Closing Circuit Not Achieving Continuity After Switch Was Actuated.Adjusted Breakers Positive Interlock Roller + (02:48:32, 2 December 2024)
- IR 05000482/1989010 + (02:48:36, 2 December 2024)
- ML20247A239 + (02:48:39, 2 December 2024)
- ML20247A237 + (02:48:39, 2 December 2024)
- ML20247A234 + (02:48:40, 2 December 2024)
- ML20247A231 + (02:48:40, 2 December 2024)
- ML20247A228 + (02:48:41, 2 December 2024)
- ML20247A226 + (02:48:43, 2 December 2024)
- ML20247A225 + (02:48:43, 2 December 2024)
- AECM-89-0065, Application for Amend to License NPF-29,authorizing Footnote Change to Table 1.2, Operational Conditions + (02:48:44, 2 December 2024)
- ML20247A223 + (02:48:45, 2 December 2024)
- ELV-00499, Submits Three Changes to Description of Initial Startup Test Program in Chapter 14 of Fsar.Changes Add Footnote to Test Abstract for Boron Thermal Regeneration Sys & Liquid Waste Processing Sys + (02:48:46, 2 December 2024)
- ML20247A221 + (02:48:46, 2 December 2024)
- ML20247A219 + (02:48:47, 2 December 2024)
- ML20247A217 + (02:48:48, 2 December 2024)
- ML20247A214 + (02:48:48, 2 December 2024)
- ML20247A210 + (02:48:50, 2 December 2024)
- PNO-III-89-046, on 890714,operators Reduced Power from 100% to 35% in Response to Rapidly Decreasing Condenser Vacuum. Vacuum Lost Due to Failure of Turbine Boot Seal.Region III Monitoring Licensee Course of Action & State of Il Notified + (02:48:50, 2 December 2024)
- ML20247A205 + (02:48:51, 2 December 2024)
- ML20247A204 + (02:48:51, 2 December 2024)
- ML20247A202 + (02:48:52, 2 December 2024)
- ML20247A199 + (02:48:53, 2 December 2024)
- ML20247A200 + (02:48:53, 2 December 2024)
- ML20247A197 + (02:48:54, 2 December 2024)
- ML20247A194 + (02:48:54, 2 December 2024)
- ML20247A193 + (02:48:55, 2 December 2024)
- RBG-30365, Provides Description of Inadequacy & Corrective Steps Taken to Improve & Strengthen Emergency Preparedness.Certified Individual Will Be Assigned to Control Room at Notification of Unusual Event Classification + (02:48:56, 2 December 2024)
- ML20247A189 + (02:48:57, 2 December 2024)
- ML20247A183 + (02:48:58, 2 December 2024)
- RBG-31247, Forwards Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Instrument Air Quality Consistent W/Mfg Recommendations for Components Served + (02:48:58, 2 December 2024)
- ML20247A182 + (02:48:59, 2 December 2024)
- ML20247A180 + (02:48:59, 2 December 2024)
- ML20247A179 + (02:49:00, 2 December 2024)
- ML20247A176 + (02:49:01, 2 December 2024)
- ML20247A178 + (02:49:01, 2 December 2024)
- ML20247A175 + (02:49:02, 2 December 2024)
- ML20247A172 + (02:49:03, 2 December 2024)