ML20247A237

From kanterella
Jump to navigation Jump to search
Forwards Design Document Survey Plan, Used as Basis for Industry Survey Being Conducted Over Cross Section of Power Plants,Per Conversation W/ a Pietrangelo.Exchange of Info W/ Groups Working in Area Suggested
ML20247A237
Person / Time
Issue date: 03/23/1989
From: Grimes B
Office of Nuclear Reactor Regulation
To: Raisin W
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
Shared Package
ML20247A243 List:
References
NUDOCS 8903290078
Download: ML20247A237 (2)


Text

-

i f

f.

j 1

MAR 8 31989 1

Nr. William Raisin j

Nuclear Management and Resources Council l

1776 Eye Street, N.W.

q Suite 1300 j

f Washington, D.C.

20006 2496 I

Dear Mr. Raisin:

L i

l Pursuant to Mr. A. Pietrangelo's conversation with Gene Imbro, enclosed j

for your information is a copy of the Design Document Survey Plan. We have been using this document as the basis for our industry survey that is being conducted over a representative cross-section of power plants. After we survey t

ceveral licensees, we would like to meet with the NUMARC or INPO groups that may be working in this area to exchange information. Gene Imbro of my staff is I

the technical contact in this area.

l l

Sincerely, j

f Original signed by Brian K. Grime $

i Brian K. Grimes, Director Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosure:

Design Document Survey Plan cc: Alex Marion, NUMARC A. Pietrangelo, NUMARC Distribution:

1 PDR

~

l

_ Central; Files- '

SIB R/F DRIS R/F h j[/' [//~D, TMartin, ED0 pf'03

/

l FMiraglia

/ pig;/_

BGrimes

/l CHaughney GImbro f

  • SEE PREVIOUS C0 i NCE l

OFC

SIB:DRIS:hRR*
C: SIB: )MSTNRT:D:

8, w.....:__________......:...........___:. __ /__..._:.__________...:...___________:-__.......__

eAME :EVImbro:mgc

CJHaughney
V im c.....:.......____..__.:.........____:_____._.___..:..________....:........_____:......___....

itTATE :03/14/89

03/2#/89
03/24/89 3290078 890333 3

REVGP ERGNihlRC PDC

.[J# *"

UNITED STATES

[..

j,ig,Gf ?,

NUCLEAR REGULATORY COMMISSION g

j wAssincTon. o. c 20s55

s/g.dl!$:/ !

l

%....'./

~

MAR 2 31989 i

Mr. William Raisin Nuclear Management and Resources Council 1776 Eye Street, N.W.

Suite 1300 Washington, D.C.

20006-2496

Dear Mr. Raisin:

Pursuant to Mr. A. Pietrangelo's conversation with Gene Imbro, enclosed for your information is a copy of the Design Document Survey Plan. We have been using this document as the basis for our industry survey that is being conducted over a representative cross-section of power plants. After we survey several licensees, we would like to meet with the NUMARC or INPO gioups that may be working in this area to exchange information. Gene Imbro of my staff is the technical contact in this area.

Sincerely,

/

-t q Brian K. Grimes, irector Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

Enclosure:

Design Document Survey Plan cc: Alex Marion, NUMARC A. Pietrangelo, NUMARC