Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247B107 + (02:36:06, 2 December 2024)
- ML20247B104 + (02:36:07, 2 December 2024)
- ML20247B101 + (02:36:07, 2 December 2024)
- IR 05000445/1989012 + (02:36:34, 2 December 2024)
- 05000305/LER-1989-009, :on 890401,during Repositioning of Ventilation Dampers,Jumper Inadvertently Detached from Terminal Block Contact,Causing Damper Actuation.Caused by Procedural Inadequacies.Weidmuller Blocks Installed + (02:36:36, 2 December 2024)
- ML20247B091 + (02:36:44, 2 December 2024)
- ML20247B090 + (02:36:45, 2 December 2024)
- ML20247B088 + (02:36:46, 2 December 2024)
- ML20247B089 + (02:36:46, 2 December 2024)
- IR 05000029/1989006 + (02:36:59, 2 December 2024)
- 05000266/LER-1989-002-01, :on 890412,during Type C Containment Leak Rate Testing,Charging Sys Check Valve 1-370 Discovered Leaking in Excess of Tech Spec Limits.Caused by Bent Dowel Pin in Valve Disc.Valve Repaired & Restored + (02:37:07, 2 December 2024)
- ML20247B081 + (02:37:08, 2 December 2024)
- ML20247B080 + (02:37:09, 2 December 2024)
- ML20247B079 + (02:37:09, 2 December 2024)
- ML20247B077 + (02:37:10, 2 December 2024)
- ML20247B076 + (02:37:11, 2 December 2024)
- ML20247B075 + (02:37:11, 2 December 2024)
- U-601467, Forwards Response to Unresolved Item in Insp Rept 50-461/89-17 Re Potential 10CFR21 Defect Re motor-operated Gate Valve Supplied to Plant W/Incorrectly Sized Stem Nut + (02:37:12, 2 December 2024)
- ML20247B071 + (02:37:13, 2 December 2024)
- ML20247B070 + (02:37:13, 2 December 2024)
- ML20247B069 + (02:37:15, 2 December 2024)
- ML20247B067 + (02:37:16, 2 December 2024)
- ML20247B068 + (02:37:16, 2 December 2024)
- ML20247B060 + (02:37:18, 2 December 2024)
- ML20247B061 + (02:37:18, 2 December 2024)
- ML20247B059 + (02:37:19, 2 December 2024)
- ML20247B053 + (02:37:20, 2 December 2024)
- ML20247B056 + (02:37:20, 2 December 2024)
- ML20247B051 + (02:37:21, 2 December 2024)
- ML20247B052 + (02:37:21, 2 December 2024)
- ML20247B046 + (02:37:22, 2 December 2024)
- ML20247B047 + (02:37:22, 2 December 2024)
- IR 05000302/1989006 + (02:37:25, 2 December 2024)
- ML20247B038 + (02:37:27, 2 December 2024)
- ML20247B039 + (02:37:27, 2 December 2024)
- ML20247B036 + (02:37:28, 2 December 2024)
- ML20247B037 + (02:37:28, 2 December 2024)
- ML20247B035 + (02:37:30, 2 December 2024)
- 05000245/LER-1998-005-02, :on 980330,loss of S1 & S2 Power Supply Were Noted Due to Single Failure.Caused by Inadequate Design & Indequate Mod Review.Abt & Breaker Configuration for MCC EF3 & MCC FE3 Will Be Evaluated + (02:37:32, 2 December 2024)
- ML20247B032 + (02:37:34, 2 December 2024)
- ML20247B031 + (02:37:34, 2 December 2024)
- ML20247B028 + (02:37:35, 2 December 2024)
- ML20247B029 + (02:37:35, 2 December 2024)
- 05000352/LER-1989-014, :on 890216,isolation of Refuel Floor Secondary Containment & Initiation of Standby Gas Treatment Sys,Esf Occurred.Caused by Boiler Malfunction.Auxiliary Operator at Auxiliary Boiler Encl Restored Three Boilers + (02:37:37, 2 December 2024)
- ML20247B026 + (02:37:38, 2 December 2024)
- 05000245/LER-1998-005, Forwards LER 98-005-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 980330.LER Being Submitted Per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed + (02:37:39, 2 December 2024)
- ML20247B024 + (02:37:39, 2 December 2024)
- ML20247B019 + (02:37:40, 2 December 2024)
- ML20247B017 + (02:37:41, 2 December 2024)
- IR 05000327/1989014 + (02:37:47, 2 December 2024)
- ML20247B013 + (02:37:48, 2 December 2024)